Botany Rail Duplication


Project at a glance


NSW Australia
Under Construction
John Holland Pty Ltd
$190M

Contact Details


Thuy Ho
Senior Consultant | Sydney and Sydney Surrounds
+61 2 9927 3100

The Port Botany Rail Duplication (including Cabramatta Loop) project comprises the duplication of the remaining single-track section of the Port Botany Rail Line and delivery of a new passing loop on the Southern Sydney Freight Line. The Project aims to provide the capacity to meet predicted growth in the containerised freight task and support rail services between Port Botany and metropolitan freight intermodal terminals.


John Holland has been awarded the contract to design and construct the Botany Rail Duplication project.


The project includes the following key features:

- Track duplication – constructing a new track predominantly within the rail corridor for a distance of about three kilometres

- Track realignment and upgrading – moving some sections of track sideways (slewing) and upgrading some sections of track to improve the alignment of both tracks and minimise impacts to adjoining land uses

- New crossovers – constructing new rail crossovers to maintain and improve access at two locations (totalling four new crossovers)

- Bridge works – constructing new bridge structures at Mill Stream, Southern Cross Drive, O’Riordan Street and Robey Street (adjacent to the existing bridges), and re-constructing the existing bridge structures at Robey Street and O’Riordan Street

- Embankment/retaining structures – construction of a new embankment and retaining structures adjacent to Qantas Drive between Robey and O’Riordan streets and a new embankment between the Mill Stream and Botany Road bridges.


Ancillary work includes bi-directional signalling upgrades, drainage work and protecting/relocating utilities.


More information about the project is available at https://artc_botanyandcabramattaprojects.icn.org.au and http://botanyduplication.com.au.


How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI. 

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway company profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - Please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
AccordianPlus Buffer Stop

Full Scope EOI

Create EOI
Closes: 
06 Aug 2022

Partial Scope EOI

  Open
AccordianPlus Switches and Crossings

Full Scope EOI

Create EOI
Closes: 
06 Aug 2022

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
26 Aug 2022

Partial Scope EOI

  Open
AccordianPlus Bungalow

Full Scope EOI

Opens: 
01 Jul 2022

Partial Scope EOI

  Pending
AccordianPlus Alumino Thermic Welds

Full Scope EOI

Closed: 
17 Dec 2021

Partial Scope EOI

  Closed
AccordianPlus Ballast Mat

Full Scope EOI

Closed: 
07 Jun 2022

Partial Scope EOI

  Closed
AccordianPlus Bored Piling

Full Scope EOI

Closed: 
09 Dec 2021

Partial Scope EOI

  Closed
AccordianPlus Crane Hire

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed
AccordianPlus Demolition Works

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed
AccordianPlus Dilapidation Survey

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Jan 2022

Partial Scope EOI

  Closed
AccordianPlus FRP - General

Full Scope EOI

Closed: 
09 Dec 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed
AccordianPlus Ground Testing

Full Scope EOI

Closed: 
31 Jan 2022

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
25 Jan 2022

Partial Scope EOI

  Closed
AccordianPlus Install - CSR and GST

Full Scope EOI

Closed: 
28 Feb 2022

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Dec 2021

Partial Scope EOI

  Closed
AccordianPlus Labour Hire

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed
AccordianPlus Plant Hire - General

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
28 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
02 Dec 2021

Partial Scope EOI

  Closed
AccordianPlus Supply - CSR Pits

Full Scope EOI

Closed: 
28 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Apr 2022

Partial Scope EOI

  Closed
AccordianPlus Supply - GST and GLT

Full Scope EOI

Closed: 
28 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Dec 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Dec 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
19 Nov 2021

Partial Scope EOI

  Closed
AccordianPlus Supply - Signal Posts

Full Scope EOI

Closed: 
28 Feb 2022

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
28 Feb 2022

Partial Scope EOI

  Closed
AccordianPlus Surveying Services

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Oct 2021

Partial Scope EOI

  Closed
AccordianPlus Tree Clearing and Grub

Full Scope EOI

Closed: 
28 Oct 2021

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
NSW AUSTRALIA

The Project’s objectives are to:- Increase rail capacity to meet forecast demand for freight services;

- Accommodate port shuttle services to move more containers in and out of the port via rail;

- Reduce road congestion, heavy vehicle road safety incidents, and road maintenance expenditure;

- Reduce rail congestion between Port Botany and intermodals;

- Provide operational flexibility flowing from reduced congestion and increased capacity;

- Improve service reliability for freight rail customers through enhanced train movements and connectivity; and

- Reduce air pollution, greenhouse gas emissions and noise from diversion of freight from road.

View Project
PROJECT
NSW AUSTRALIA

The project works will introduce a 1.65km long passing loop between existing Glenfield and Leightonfield Passing Loops. The Project works will require the design and construction of all civil, track, signalling, communications, and electrical works to commission the passing loop.

View Project