Mardie Salt & Potash Project



Contact Details


Andie Pfaff
ICN Coordinator
+61 8 9365 7735
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: Live
  Project Owner MARDIE MINERALS PTY LTD

Project Details


Mardie Minerals Pty Ltd (Mardie) is a wholly owned subsidiary of BCI Minerals Limited (BCI). The Mardie Salt & Potash Project (the Project) is located within Australia’s major salt producing region on the West Pilbara coast. The Project is proposing to be Australia’s first to produce salt and Sulphate of Potash (SOP) through the evaporation of seawater. The evaporation production process is powered largely through natural solar and wind energy, meaning sustainable supply of salt and potash. The Project will produce high purity salt that will be used mainly within the chemical manufacturing industry. SOP will be used as a premium fertiliser to improve plant growth and drought resistance. The Project includes the following components;


·        large scale earthworks associated with construction of evaporative ponds, salt crystallisers and

         SOP crystallisers

·        salt wash and stockpile facilities

·        SOP production and storage facility

·        new accommodation Village

·        non process infrastructure

·        port marine structures – 2.5km Jetty

·        dredging

·        power station and gas pipeline

·        production water and associated pumping

·        communications infrastructure

·        potable water supply and reticulation

·        medium haulage and light vehicle roads

·        upgrades to existing water feed infrastructure


It is a BCI Minerals requirement that standards utilised are either Australian or internationally recognised equivalents, unless otherwise justified due to specific technological, commercial, intellectual property or similar requirements. All invitations to tender, tender and contract document references will stipulate required standards requirements. In certain circumstances, materials specifications in tender documents may be met by using either Australian or internationally recognised standards.  The Project is committed to local and indigenous engagement according to the Project’s approved Australian Industry Participation plan (summary publicly available).


The anticipated project delivery schedule will be approximately four years, subject to the necessary approvals.

SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Mardie Salt and Potash Project - General updates19 Apr 202119 Apr 2022 
 
Express interest for general updates on this project