Mardie Salt & Potash Project

Mardie Minerals Pty Ltd (Mardie) is a wholly owned subsidiary of BCI Minerals Limited (BCI). The Mardie Salt & Potash Project (the Project) is located within Australia’s major salt producing region on the West Pilbara coast. The Project is proposing to be Australia’s first to produce salt and Sulphate of Potash (SOP) through the evaporation of seawater. The evaporation production process is powered largely through natural solar and wind energy, meaning sustainable supply of salt and potash. The Project will produce high purity salt that will be used mainly within the chemical manufacturing industry. SOP will be used as a premium fertiliser to improve plant growth and drought resistance. The Project includes the following components;


·        large scale earthworks associated with construction of evaporative ponds, salt crystallisers and

         SOP crystallisers

·        salt wash and stockpile facilities

·        SOP production and storage facility

·        new accommodation Village

·        non process infrastructure

·        port marine structures – 2.5km Jetty

·        dredging

·        power station and gas pipeline

·        production water and associated pumping

·        communications infrastructure

·        potable water supply and reticulation

·        medium haulage and light vehicle roads

·        upgrades to existing water feed infrastructure


It is a BCI Minerals requirement that standards utilised are either Australian or internationally recognised equivalents, unless otherwise justified due to specific technological, commercial, intellectual property or similar requirements. All invitations to tender, tender and contract document references will stipulate required standards requirements. In certain circumstances, materials specifications in tender documents may be met by using either Australian or internationally recognised standards.  The Project is committed to local and indigenous engagement according to the Project’s approved Australian Industry Participation plan (summary publicly available).


The anticipated project delivery schedule will be approximately four years, subject to the necessary approvals.

Share this project on:

FB Twitter LinkedIn

Project at a glance


WA Australia (Onshore)
Live
MARDIE MINERALS PTY LTD

Contact Details


Georgie McInerney
Supply Chain Consultant
+61 8 9365 7491

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Create EOICloses: 28 Oct 2021
Create EOI Closes: 28 Oct 2021
  Open
AccordianPlus Powerlines
Create EOICloses: 30 Oct 2021
Create EOI Closes: 30 Oct 2021
  Open
Create EOICloses: 19 Apr 2022
  Open
Closed: 09 Jul 2021
Closed: 09 Jul 2021
  Closed
Closed: 14 Jul 2021
Closed: 14 Jul 2021
  Closed
Closed: 14 Jul 2021
Closed: 14 Jul 2021
  Closed
Closed: 14 Jul 2021
Closed: 14 Jul 2021
  Closed
Closed: 06 Aug 2021
Closed: 06 Aug 2021
  Closed
Closed: 13 Aug 2021
Closed: 13 Aug 2021
  Closed
Closed: 13 Aug 2021
Closed: 13 Aug 2021
  Closed
AccordianPlus Power Station
Closed: 30 Aug 2021
Closed: 30 Aug 2021
  Closed
Closed: 30 Aug 2021
Closed: 30 Aug 2021
  Closed
Closed: 08 Sep 2021
Closed: 08 Sep 2021
  Closed
Closed: 16 Sep 2021
Closed: 16 Sep 2021
  Closed
AccordianPlus Dredging
Closed: 30 Sep 2021
Closed: 30 Sep 2021
  Closed
AccordianPlus Crystallisers
Closed: 20 Oct 2021
Closed: 20 Oct 2021
  Closed
Note: The closing date/s for expressions of interest are subject to change.