NEW ENGLAND SOLAR FARM

About Green Light Pty Ltd

Green Light is a wholly owned subsidiary of Elecnor Australia, itself a subsidiary of Elecnor SA, a large Spanish-owned renewable energy group operating in 56 countries around the world. Green Light is the engineering, procurement and construction (EPC) contractor, as well as being responsible for handling the ongoing operation and maintenance (O&M) for the solar farm.


The Project

Green Light Contractors Pty Ltd has been awarded with the EPC contract for the New England Solar Farm (NESF) – Stage one with UPC. The project is located within Uralla Shire Council (USC) in the Northern Tablelands region of New South Wales. NESF is located approximately 6km north-east of Uralla, 15km south of Armidale and 80km north of Tamworth. The New England Solar Farm will occupy a 3,362-hectare site.
Stage one includes a 400MWAC solar farm, 33/330kV Substation, and an operations and maintenance building (O&M Building).
The solar farm will convert energy from solar radiation into electrical energy which will then be fed into the electricity grid. Approximately 978,576 Photovoltaic modules will be mounted onto a horizontal single-axis tracking system that follows the path of the sun.
Using inverters and step-up transformers, the PCUs will convert the DC electrical energy into AC electrical energy at an optimized reticulation voltage, anticipated to be 33 kV.


General Information on Project

https://www.newenglandsolarfarm.com.au

Please click here for more information about the project.


How to register an Expression of Interest

This is a general EoI submission and Work Packages currently available to submit an EoI for are listed below.

Shortlisted SMEs will be invited to tender Work Packages as needed.

To submit an initial EoI for the Work Scopes, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

Click here to register your company profile on ICN Gateway.

Support and assistance is available through the web links listed below.

Your company summary and company description are used to assess your ability to complete projects when you lodge an EoI- please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Project Documents
General

Share this project on:

FB Twitter LinkedIn

Project at a glance


NSW Australia
Approved - Construction
GREEN LIGHT CONTRACTORS PTY. LTD.
$500M+

Contact Details


Dusko Bajic
NSW Defence Industry Manager
+61 417 323 636

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Closed: 01 Jun 2021
  Awarded
AccordianPlus Fire Water Tanks
Closed: 14 Apr 2021
  Awarded
AccordianPlus Power Quality Meters
Closed: 31 Mar 2021
  Awarded
AccordianPlus Weather Station
Closed: 31 Mar 2021
  Awarded
AccordianPlus CCTV
Closed: 25 Jun 2021
  Closed
AccordianPlus Cleaning
Closed: 07 Sep 2021
  Closed
AccordianPlus Clearing and Grubbing
Closed: 20 Jun 2021
  Closed
Closed: 07 Jul 2021
  Closed
Closed: 26 May 2021
  Closed
AccordianPlus Electrical Accessories
Closed: 15 Jul 2021
  Closed
AccordianPlus Food Truck
Closed: 30 Sep 2021
  Closed
Closed: 30 Jun 2021
  Closed
AccordianPlus High Voltage Works
Closed: 30 Jun 2021
  Closed
Closed: 12 Jul 2021
  Closed
AccordianPlus LV Electrical Works
Closed: 07 Jul 2021
  Closed
AccordianPlus Mechanical Works
Closed: 15 Jun 2021
  Closed
Closed: 30 Sep 2021
  Closed
Closed: 24 Aug 2021
  Closed
AccordianPlus Piling works
Closed: 10 Jun 2021
  Closed
AccordianPlus Site compound
Closed: 10 Jun 2021
  Closed
Closed: 29 May 2021
  Closed
AccordianPlus Surveying works
Closed: 10 Jun 2021
  Closed
Closed: 01 Jun 2021
  Closed
Closed: 30 Jul 2021
  Closed
AccordianPlus Waste Disposal
Closed: 07 Sep 2021
  Closed
Note: The closing date/s for expressions of interest are subject to change.