Project Marinus


Project at a glance


TAS, VIC Australia
Design and Approvals Phase
TASMANIAN NETWORKS PTY LTD

Contact Details


Colin Young - Victoria
Industry Adviser
+61 438 753 428

Todd Hendriks - Tasmania
Senior Project Manager
+61 3 6477 7081

Project Marinus was established by TasNetworks and is being progressed with financial support from the Australian and Tasmanian Governments. Project Marinus is comprised of several related standalone projects:


  • Marinus Link - a proposed 1500 megawatt HVDC underground and subsea electricity interconnector between Tasmania and Victoria
  • Supporting transmission developments in Tasmania.


The proposed construction of Marinus Link has been formally recognised as a key component of Australia's fast-evolving National Energy Market.


TasNetworks is owned by the State of Tasmania, and is operated as a commercial business with assets of $3.5 billion. TasNetworks is also the jurisdictional planner in the National Energy Market for Tasmania.


Find out more:

Project Marinus and Marinus Link
TasNetworks and supporting transmission developments


TasNetworks has already established contracts for the following work required to support the Design and Approvals phase of the project:

  • technical, engineering and project management
  • inter-regional transmission pricing
  • regulatory investment tests for transmission
  • economic modelling
  • HVDC cable advisory
  • marine reconnaissance and geophysical surveys
  • cable route assessment
  • system studies analysis
  • project establishment and strategic advisory
  • legal
  • community and customer engagement
  • environmental, land use planning and heritage
  • land access, acquisition and easement negotiation


It is anticipated that contracts for the following work will be made available, and progressed during, Design and Approvals phase:


Marinus Link and North West Transmission Developments:

  • Geotechnical investigation services (various packages – Vic and Tas)


It is anticipated that contracts for the following major works packages will be made available during the Design and Approvals phase, for progression during the Construction phase (subject to the Final Investment Decision, expected by early 2024):


Marinus Link (Vic and Tas):

  • Converter site establishment (two packages – Vic and Tas)
  • HVDC Voltage Source Conversion converter station design, manufacture, transportation, supply, installation and commissioning (single package – Vic and Tas); including design and construction of converter buildings
  • HVDC submarine cable design, manufacture, transportation, supply, installation and commissioning (single package), including horizontal directional drilling (Vic and Tas)
  • HVDC underground land cable design, manufacture, transportation, supply, installation and commissioning (single package, excluding civil trenching works), including horizontal directional drilling (Vic and Tas)
  • Land civil trenching works (Vic only)


Based on knowledge of market capability, TasNetworks anticipates that each of the HVDC works packages will be led by international suppliers, with the converter station site establishment and land civil trenching work packages to be led by suitably qualified and experienced Australian civil works contractors.


North West Transmission Developments (Tas only):

  • Design and construction of new HVAC 220 kV transmission lines (single and double-circuit, total length approximately 220 km, up to four packages)
  • Design and construction of new switching stations (three of)
  • Design and construction of new substations (two of)Upgrades to existing substations (three sites)


For the North West Transmission Developments, it is TasNetworks’ expectation that each of the works packages will be led by suitably qualified and experienced Australian suppliers and contractors. Sourcing of key materials (e.g. conductors, steel) from within Australia will be viewed favourably by TasNetworks.


General

Depending on the nature of the procurement activity, TasNetworks may elect to conduct the procurement process in two stages - expression of interest / pre-qualification, followed by request for tender.


TasNetworks recognises that the project will provide significant opportunities for suitably qualified and experienced Australian manufacturers, suppliers, contractors, consultants and other service providers to participate, directly or indirectly, in the project.


Across all works packages, the ability to effectively manage contract interfaces and scheduling requirements will be critical to the success of the project.


Timing

Tasmanian Networks aim to reach a Final Investment Decision in early 2024, with design, manufacturing and construction to commence shortly after that decision is made.


The proposed 1500 MW capacity of Marinus Link is planned to be built in two 750 MW stages, with commissioning of each stage proposed to be separated by two to three years. The first stage is planned to be ‘shovel ready’ by 2024 and commissioned by 2028.


The full capacity of Marinus Link (stage 1 and stage 2) could be in service by as early as 2030.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.


ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.


(1) ICN Gateway Setup Wizard
(2) ICN Gateway User Guide

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

General

Full Scope EOI

Create EOI
Closes: 
30 Jun 2023

Partial Scope EOI

  Open
Accordian collapse

Miscellaneous

Full Scope EOI

Create EOI
Closes: 
30 Jun 2022

Partial Scope EOI

Create EOI
Closes: 
30 Jun 2022
  Open

Full Scope EOI

Create EOI
Closes: 
30 Jun 2022

Partial Scope EOI

Create EOI
Closes: 
30 Jun 2022
  Open

Full Scope EOI

Create EOI
Closes: 
30 Jun 2022

Partial Scope EOI

Create EOI
Closes: 
30 Jun 2022
  Open

Full Scope EOI

Create EOI
Closes: 
30 Jun 2022

Partial Scope EOI

Create EOI
Closes: 
30 Jun 2022
  Open

Full Scope EOI

Create EOI
Closes: 
30 Jun 2022

Partial Scope EOI

Create EOI
Closes: 
30 Jun 2022
  Open

Full Scope EOI

Closed: 
09 Aug 2021

Partial Scope EOI

Closed: 
09 Aug 2021
  Closed

Full Scope EOI

Closed: 
10 Aug 2021

Partial Scope EOI

Closed: 
10 Aug 2021
  Closed

Full Scope EOI

Closed: 
10 Aug 2021

Partial Scope EOI

Closed: 
10 Aug 2021
  Closed

Full Scope EOI

Closed: 
10 Aug 2021

Partial Scope EOI

Closed: 
10 Aug 2021
  Closed
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
VIC AUSTRALIA

The $1.75 billion Regional Rail Revival program will upgrade every passenger train line in Victoria. It is a joint initiative of the Australian and Victoria governments.

View Project
PROJECT
VIC AUSTRALIA

The Star of the South is Australia’s first offshore wind project, proposed to be located off the south coast of Gippsland, Victoria.


The project would provide large-scale, renewable electricity generation to support Victoria’s energy transition, as well as jobs and investment for Victoria.


At 2.2 GW, it would be one of the largest offshore wind farms in the world, generating enough electricity to power up to 1.2 million homes and provide around 20 percent of Victoria’s electricity needs.


The proposed offshore wind farm would transmit electricity via offshore cables and onshore underground transmission cables to an existing terminal station in the Latrobe Valley.


The project is being progressed by a local Victorian-based team with investment from Copenhagen Infrastructure Partners (CIP) – a world leader in offshore wind development.

View Project
PROJECT
VIC AUSTRALIA

Major Road Projects Victoria (MRPV) have established a series of Panels of Contractors to deliver on a number of Major Projects which will be released to the Market via the Panel arrangement in Tranches. Each Contractor will be responsible for the Design as well as the Construction elements of each of the Projects and details of the successful Contractor will be posted here when available.

View Project
PROJECT
VIC AUSTRALIA

The Trefoil Project seeks to deliver an economically viable concept for the development of the Trefoil field (located in the Bass Basin).  The Trefoil Project is in the Define (FEED) phase, looking at defining a subsea development with production to, and control from, the existing Yolla-A platform.   The development targets the Trefoil field only in Phase 1, followed by a potential future Phase 2 of the development targeting the White Ibis field. 

View Project