STANDARD LISTINGS ▲ CONTRACT
|
STATUS
|
|
▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Anti-Graffiti Treatment | 15 Jan 2021 | 05 Feb 2021 | | 
| | |
| Supply and Application of Anti Graffiti Treatments to various locations throughout Station Precinct. |
| | Architectural linings (aluminum/stainless steel) | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Various architectural linings including:
- metal panel wall lining system - pre-finished metal sheet wall lining on suitable metal support framing, including necessary brackets, fastenings and accessories for a complete installation
- lack anodised aluminum panel wall lining system - pre-finished aluminium sheet wall lining on suitable metal support framing, including necessary brackets, fastenings and accessories for a complete installation
- stainless steel wall lining system - stainless steel sheet wall lining used as in-fill and close out panels as shown the design drawings, on suitable metal support framing, including necessary brackets, fastenings and accessories for a complete installation
- perforated metal panel - perforated pressed metal panel on suitable metal support framing, including necessary brackets, fastenings and accessories for a complete installation
- metal panel - solid metal sheet panel lining to internal wall substrates as shown on the design drawings. |
| | Asphalt Works | 15 Jan 2021 | 05 Feb 2021 | | 
| | |
| Asphalt Works to Station Precinct. |
| | Bike Racks | 15 Jan 2021 | 05 Feb 2021 | | 
| | |
| Bike racks are to be fully dynamic two-tier metal bike rack system as shown on the design drawings, securely fixed to the floor substrate, including necessary brackets, fastenings and accessories for a complete installation. Specifications include:
. material - heavy-duty high-quality steel
. size - manufacturer's standard
. finish - galvanised with powder coated accents on handles
. colour - yellow
. capacity - two bikes
. size - 1860mm (L) x 1637mm (H)
Note: The dynamic upper tier to include gas assist lift for ease of use and configured in alternating heights. |
| | Final Clean | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Final deep clean of entire station once construction and commissioning works are complete before handover to client. This includes detailed cleaning of all finished surfaces (glazing, handrails, pavers/tiles, walls, etc.) to an acceptable standard for handover. |
| | Fire Stopping | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Supply and installation of Stair Nosings at various locations throughout Station Precinct. |
| | Floor Finishes (Carpets and Vinyls) | 15 Jan 2021 | 05 Feb 2021 | | 
| | |
| - Vinyl flooring as shown on the design drawings and specifications, adhesive fixed to the floor substrate. This is required to some rooms within the station such as the maintenance office, storeroom and multipurpose room.
- Sheets need to be 1.2m wide, 2mm thick and color/pattern as per design.
- Aluminum/SS transition strips with vibration resistant adhesive. |
| | Furniture and Fittings | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Supply and Installation of Furniture and Fittings to Station. |
| | Joinery | 22 Jan 2021 | 12 Feb 2021 | | 
| | |
| Joinery, cabinetwork and other associated items within the station using typical materials such as: timber, plywood, fibreboard, particleboard, decorative overlays, laminated sheets, finishes, etc. |
| | Landscaping (including irrigation) | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| General soft landscaping works including:
- soil placement
- planting / mulching
- irrigation installation and commission |
| | Linemarking | 22 Jan 2021 | 12 Feb 2021 | | 
| | |
| Supply and installation of Linemarking at various locations to Station Precinct |
| | Loose Furniture | 21 Jan 2021 | 11 Feb 2021 | | 
| | |
| Loose furniture items for within the station, such as lockers, pin-up boards, mirrors, etc. |
| | Painting | 15 Jan 2021 | 05 Feb 2021 | | 
| | |
| Painting to various areas/surfaces as per the design, including:
- blockwork and concrete paint
- concrete paint
- paint to plasterboard walls/ceilings. |
| | Partitions and Linings | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Plasterboard partitions as per the design drawings/wall type schedule for specific types and build-up. |
| | Precinct Bollards | 15 Jan 2021 | 05 Feb 2021 | | 
| | |
| Supply and installation of Bollards to Station Precinct |
| | Roller Shutters | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Motorised steel roller shutter system as shown on the design drawings including:
- necessary brackets, fastenings and accessories for a complete installation
- interlocking perforated steel slats, with emergency hand chain operation
- concealed metal fixings
- no requirement for fire or acoustic ratings. |
| | Signage and Wayfinding | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Supply and installation of Signage to Station Precinct |
| | Stair Nosings | 21 Jan 2021 | 11 Feb 2021 | | 
| | |
| Supply and installation of Stair Nosings at various locations throughout Station Precinct. |
| | Tactile Indicators | 15 Jan 2021 | 05 Feb 2021 | | 
| | |
| Tactile indicators to areas shown on the design drawings including:
- stainless steel tactile ground surface indicator studs
- stainless steel tactile ground surface indicator bars
- stainless steel tactile ground surface indicator bars/studs to escalators
- directional tactile ground surface indicator bars
- warning tactile ground surface indicator bars/studs. |
| | Tiling | 11 Jan 2021 | 29 Jan 2021 | | 
| | |
| Vitrified ceramic tile floor finish on suitable bedding (as shown on design drawings and in specifications), including necessary grouting, trims and accessories for complete installation.
Tiling is required to the following areas within the station: customer and staff toilets, cleaner's storerooms, refuse rooms. |