Snowy 2.0 Connection Project



Contact Details


Geoff Reardon
Regional Manager - South NSW
+61 402 632 027
 CONTACT EMAIL

  Locations: NSW Australia (Onshore)
  Project Value: $10-$15 Mill
  Project Status: Engagement
  Project Owner TRANSGRID

Project Details


TransGrid, the Principal operates and manages the NSW high voltage electricity transmission network and holds a telecommunications carrier license to support both its services business and its electricity network functions. The Principal operates and manages the high voltage electricity transmission network in NSW and ACT, a system comprising over 100 substations and power station switchyards and over 12,000 kilometres of transmission lines operating at up to 500kV. The Principal also operates and/or manages over 100 radio sites, and an optical fibre based telecommunications network, which is primarily used to provide telecommunications services for the protection, operation and maintenance of the high voltage electricity network in NSW and the ACT. The principal has been awarded contract to set up the Maragle 330kV switching station along with 9km Transmission Line.


The project is being developed as a Design and Construct project with the contract awarded to UGL. TransGrid will be free issuing high voltage Equipment to UGL for construction of the project. The high voltage equipment required for the project together with quantities is listed in the Returnable Schedules. The list is based on the concept design and subject to change. The list of items, ratings, quantities provided are indicative only for the purpose of the EOI. The common technical parameters for all equipment are detailed in the Returnable Schedules. All equipment must meet the common technical parameters. The supplier shall review the common technical parameters and only nominate an expression of interest for items where they can meet these parameters.

SHOW LESS

Project Documents


Project Prequalification Questionnaire

  ▲ CONTRACT
Maragle EOI HV Equipment Returnable Schedules Qual Questionnaire v1.2 20201103
SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Maragle 330kV Switching Station - High Voltage Equipment Supply and Install Supervision03 Nov 202018 Nov 2020 
  
The project is being developed as a Design and Construct project with the contract awarded to UGL. TransGrid will be free issuing high voltage Equipment to UGL for construction of the project. The high voltage equipment required for the project together with quantities is listed in the Returnable Schedules. The list is based on the concept design and subject to change. The list of items, ratings, quantities provided are indicative only for the purpose of the EOI. The common technical parameters for all equipment are detailed in the Returnable Schedules. All equipment must meet the common technical parameters. The supplier shall review the common technical parameters and only nominate an expression of interest for items where they can meet these parameters