Olympic Dam SCM21



Contact Details


Eddie Ivar
Supply Consultant, ICN SA
+61 8 8226 3011
 CONTACT EMAIL

Merril Kirk
+61 8 8303 2383
 CONTACT EMAIL

  Locations: SA Australia
  Project Value: > $500 million
  Project Status: Definition Phase Study
  Project Owner BHP Olympic Dam Corporation Pty Ltd (BHP)

Project Details


SCM 21 is the next routine maintenance shutdown, essentially a major deconstruct and reconstruct endeavour scheduled around statutory requirements (annual boiler and service) and furnace lining and repair/replacement.
The proposed SCM21 Project is currently in Definition Phase and is subject to a number of internal approvals. As part of this phase, the Company is seeking expressions of interest from suitable qualified contractors and suppliers to gain an understanding of the capacity and the capability of available contractors and suppliers for the proposed project.

All work packages listed on the ICN Gateway facility will provide equal and reasonable timeframes for Australian and non-Australian entities to respond to tenders (and RFQs).
BHP SCM21 Project will establish an arrangement with Bechtel for any upcoming work packages to be listed on the ICN Gateway On-Line Facility.

SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS   MECHANICAL    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Dust Drag Chain Conveyors 
  

Full scope has been awarded to:


Replacement of Waste heat boiler drag chain conveyor and replacement of chains for two (2) conveyors
Supply of Brick Lining System - Sulphur Furnace and Mixing Tee 
  

Full scope has been awarded to:


Engineering, detailed design, supply, fabrication, assembly, inspection and testing of the brick lining system for one new replacement sulphur burner and the adjacent mixing tee, including but not limited to:
* Firebrick
* Insulating Firebrick
* Castable Refractory
* Mortar
* Ceramic Blanket
* Ceramic Paper
* Castable Anchors
* Vectorwall
Supply of Hot Gas Heat Exchanger 
  

Full scope has been awarded to:


The Design and Supply of Hot Gas Heat Exchanger (a shell and tube heat exchanger which transfers heat from the converter second pass to the Sulphur Burner).

Technical description:
* Shell side inlet and outlet nozzles to incorporate a radius.
* Update the gas nozzle internal posts and straps (stiffeners/vanes) and associated external gussets.
* Locate bottom plate stiffeners inside the vestibule instead of outside to provide a cleaner surface to insulate and more uniform temperatures.
* Design Completion.
* Fabrication Including Factory Acceptance Testing.
* Packing.
* FCA Suppliers Works (Incoterms 2020).
Supply of All Areas Mild Steel Fabrication (Tanks and Ducting)17 Jun 202029 Jun 2020 
  
Engineering, Detailed design, supply, fabrication, assembly, inspection and testing of tanks and ducting including light and medium structural steel fabrication.
Supply of All Areas Stainless Steel Fabrication (Tanks Piping and Ducting)17 Jun 202029 Jun 2020 
  
Engineering, Detailed design, supply, fabrication, assembly, inspection and testing of stainless steel tanks and ducting.
Supply of Cooling Tower Materials for Refurbishment and Installation of Fifth Cell06 Mar 202020 Mar 2020 
  
Major refurbishment of Cooling Tower #2 (Acid Plant) including structural repairs, new fill media fixing screws, spray nozzles and side stream filtration
Supply of Gas Converter Bed Catalyst17 Jun 202029 Jun 2020 
  
Bed 1 Catalyst 40,000L, Bed 2, 3 and 4 Catalyst 62,000L.
Supply of Steam Valves06 Mar 202025 Mar 2020 
  
Replacement & refurbishment of steam valves in the acid plant and on the main plant header. Also includes valves associated with the smelter shutdown.
Waste Heat Boiler Panels - Replacement and Repair30 Jul 202009 Aug 2020 
  
The refurbishment and overhaul of the Waste Heat Boiler (WHB) requires the complete replacement or partial replacement / major repair of sixteen (16) Panels (i.e. tube-bundle + outer membrane), and one (1) Plate (only).
The Grade of Tube Material is ASTM A192, with Inconel 625 Cladding of eleven (11) of the 17-off Panels/Plate.
Approx. Panels/Plate size is ~5m X 2m.
The Scope of Supply includes:
- production of Fabrication Drawings (including Transport Frames)
- supply of all Items
- Inspection and Testing
- Quality
- Goods and Packaging.
STATUS   SERVICES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Domestic Transport 
  

Full scope has been awarded to:


To provide Domestic Transportation services for material movements from various locations around Australia to Project Jobsite, including some out of gauge movements and warehousing.
Construction / Installation / Management06 Mar 202020 Mar 2020 
  
* Civils/ Concrete/SMP
* Furnace Copper Piping
* Electrical & Instrumentation (E&I)
* Demolition/ Removal
* Refractory Installation
* Furnace Heat Up
Installation Electrical and Controls - Site Wide24 Sep 202016 Oct 2020 
  
To provide on-site installation services for existing facility infrastructure, plant and equipment.
Installation of Project Site Temporary Facilities24 Sep 202016 Oct 2020 
  
Provide on-site installation services for temporary facilities.
Supply and Installation Furnace Water Jackets and Hoses24 Sep 202016 Oct 2020 
  
Supply and on-site installation services for existing facility infrastructure, plant and equipment.
Supply and Installation of Tank Rubber Lining24 Sep 202016 Oct 2020 
  
Supply and on-site installation services for existing facility infrastructure, plant and equipment.
Supply and Operate Project Site Major Cranage24 Sep 202016 Oct 2020 
  
To supply equipment and provide on-site services.
Supply of Temporary Non Process Infrastructure Buildings31 Jul 202012 Aug 2020 
  
One hundred eight (108) buildings are required. Change rooms and laundry buildings will be purchased and other buildings will be hired.

There are 14 types of building as listed below:
a. 12m x12m office
b. 12m x 6m office
c. 12m x12m training
d. 12m x 3m - 6 person
e. 12m x 3m - 4 person
f. 12m x 3m - 2 peson
g. Lunchroom
h. Guardhouse
i. Medical facility
j. Shower Locker
k. 12m x 3m Permit hut
l. 6m x 3m Permit hut
m Ablutions
n. Laundries

Each building shall be supplied completely fitted out and ready for operation once it has been installed (by others) on the foundations.
Surveying Services06 Mar 202026 Mar 2020 
  
To provide on-site survey services for existing facility infrastructure, plant and equipment.