| | Dust Drag Chain Conveyors | | | | 
| | |
| Full scope has been awarded to:Replacement of Waste heat boiler drag chain conveyor and replacement of chains for two (2) conveyors |
| | Supply of Brick Lining System - Sulphur Furnace and Mixing Tee | | | | 
| | |
| Full scope has been awarded to:SHINAGAWA REFRACTORIES AUSTRALASIA PTY LTD | 23 Glastonbury Avenue UNANDERRA, NSW Australia 2526 Phone: +61 02 4221 1700 Fax: +61 02 4221 1795 Email: sales@shinagawa.biz Web: shinagawa.com.au
|
Engineering, detailed design, supply, fabrication, assembly, inspection and testing of the brick lining system for one new replacement sulphur burner and the adjacent mixing tee, including but not limited to:
* Firebrick
* Insulating Firebrick
* Castable Refractory
* Mortar
* Ceramic Blanket
* Ceramic Paper
* Castable Anchors
* Vectorwall |
| | Supply of Hot Gas Heat Exchanger | | | | 
| | |
| Full scope has been awarded to:The Design and Supply of Hot Gas Heat Exchanger (a shell and tube heat exchanger which transfers heat from the converter second pass to the Sulphur Burner).
Technical description:
* Shell side inlet and outlet nozzles to incorporate a radius.
* Update the gas nozzle internal posts and straps (stiffeners/vanes) and associated external gussets.
* Locate bottom plate stiffeners inside the vestibule instead of outside to provide a cleaner surface to insulate and more uniform temperatures.
* Design Completion.
* Fabrication Including Factory Acceptance Testing.
* Packing.
* FCA Suppliers Works (Incoterms 2020). |
| | Supply of All Areas Mild Steel Fabrication (Tanks and Ducting) | 17 Jun 2020 | 29 Jun 2020 | | 
| | |
| Engineering, Detailed design, supply, fabrication, assembly, inspection and testing of tanks and ducting including light and medium structural steel fabrication. |
| | Supply of All Areas Stainless Steel Fabrication (Tanks Piping and Ducting) | 17 Jun 2020 | 29 Jun 2020 | | 
| | |
| Engineering, Detailed design, supply, fabrication, assembly, inspection and testing of stainless steel tanks and ducting. |
| | Supply of Cooling Tower Materials for Refurbishment and Installation of Fifth Cell | 06 Mar 2020 | 20 Mar 2020 | | 
| | |
| Major refurbishment of Cooling Tower #2 (Acid Plant) including structural repairs, new fill media fixing screws, spray nozzles and side stream filtration |
| | Supply of Gas Converter Bed Catalyst | 17 Jun 2020 | 29 Jun 2020 | | 
| | |
| Bed 1 Catalyst 40,000L, Bed 2, 3 and 4 Catalyst 62,000L. |
| | Supply of Steam Valves | 06 Mar 2020 | 25 Mar 2020 | | 
| | |
| Replacement & refurbishment of steam valves in the acid plant and on the main plant header. Also includes valves associated with the smelter shutdown. |
| | Waste Heat Boiler Panels - Replacement and Repair | 30 Jul 2020 | 09 Aug 2020 | | 
| | |
| The refurbishment and overhaul of the Waste Heat Boiler (WHB) requires the complete replacement or partial replacement / major repair of sixteen (16) Panels (i.e. tube-bundle + outer membrane), and one (1) Plate (only).
The Grade of Tube Material is ASTM A192, with Inconel 625 Cladding of eleven (11) of the 17-off Panels/Plate.
Approx. Panels/Plate size is ~5m X 2m.
The Scope of Supply includes:
- production of Fabrication Drawings (including Transport Frames)
- supply of all Items
- Inspection and Testing
- Quality
- Goods and Packaging. |
STATUS
|
|
SERVICES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Domestic Transport | | | | 
| | |
| Full scope has been awarded to:To provide Domestic Transportation services for material movements from various locations around Australia to Project Jobsite, including some out of gauge movements and warehousing. |
| | Construction / Installation / Management | 06 Mar 2020 | 20 Mar 2020 | | 
| | |
| * Civils/ Concrete/SMP
* Furnace Copper Piping
* Electrical & Instrumentation (E&I)
* Demolition/ Removal
* Refractory Installation
* Furnace Heat Up |
| | Installation Electrical and Controls - Site Wide | 24 Sep 2020 | 16 Oct 2020 | | 
| | |
| To provide on-site installation services for existing facility infrastructure, plant and equipment. |
| | Installation of Project Site Temporary Facilities | 24 Sep 2020 | 16 Oct 2020 | | 
| | |
| Provide on-site installation services for temporary facilities. |
| | Supply and Installation of Tank Rubber Lining | 24 Sep 2020 | 16 Oct 2020 | | 
| | |
| Supply and on-site installation services for existing facility infrastructure, plant and equipment. |
| | Supply and Operate Project Site Major Cranage | 24 Sep 2020 | 16 Oct 2020 | | 
| | |
| To supply equipment and provide on-site services. |
| | Supply of Temporary Non Process Infrastructure Buildings | 31 Jul 2020 | 12 Aug 2020 | | 
| | |
| One hundred eight (108) buildings are required. Change rooms and laundry buildings will be purchased and other buildings will be hired.
There are 14 types of building as listed below:
a. 12m x12m office
b. 12m x 6m office
c. 12m x12m training
d. 12m x 3m - 6 person
e. 12m x 3m - 4 person
f. 12m x 3m - 2 peson
g. Lunchroom
h. Guardhouse
i. Medical facility
j. Shower Locker
k. 12m x 3m Permit hut
l. 6m x 3m Permit hut
m Ablutions
n. Laundries
Each building shall be supplied completely fitted out and ready for operation once it has been installed (by others) on the foundations. |
| | Surveying Services | 06 Mar 2020 | 26 Mar 2020 | | 
| | |
| To provide on-site survey services for existing facility infrastructure, plant and equipment. |