Chichester Transmission and Solar Project



Contact Details


  Linus O'Brien
  +61 8 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: In progress
  Project Owner DOWNER UTILITIES AUSTRALIA PTY LTD

Project Details


The Chichester Transmission and Solar Project (EPC) is being delivered by Downer Utilities for Alinta Energy.


The project is approximately 100 km north of Newman in Western Australia, within the East Pilbara Shire Council area.


It comprises a utility-scale 60MW solar farm, new substation at FMG Christmas Creek and Cloudbreak Mine sites, and substation expansion at Roy Hill Mine.


The project will connect to the 220kV Roy Hill to Cloudbreak power transmission line. The proposed solar PV field will occupy ~150 ha & consist of ~150,000 panels mounted on a single axis tracking system. The transmission line will include 60 km of transmission infrastructure.

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
PV Module Install14 Nov 1920 Dec 1920 Dec 19
Please refer to SOW for further details pertaining to this work.
PV Module Tracker Installation14 Nov 1920 Dec 1920 Dec 19
Please refer to SOW for further details pertaining to this package.
Freight Domestic8 Nov 1918 Nov 1918 Nov 19
Please refer to the scope of works document for details of the package
Tree Removal and Clearing and Grubbing8 Nov 1918 Nov 1918 Nov 19
Please refer to the scope of woks document for details of the package
Earthworks14 Nov 1924 Nov 1924 Nov 19
Please refer to SOW for further details pertaining to this package.
Supply of DC Cables SF14 Nov 1927 Nov 1927 Nov 19
Please refer to SOW for further details pertaining to this package.
Supply of MV Cables SF14 Nov 1927 Nov 1927 Nov 19
Please refer to SOW for further details pertaining to this package.
Labour Hire Support for Project22 Nov 192 Dec 192 Dec 19
Please refer to the scope of works document for details of the package
Supply of Water Carts and Service Carts22 Nov 192 Dec 192 Dec 19
Please refer to the scope of works document for details of the package
Supply Steel support structures for substation primary equipment18 Nov 193 Dec 193 Dec 19
Please refer to the scope of works document for details of the package
Supply of 220kV Overhead Transmission Conductor14 Nov 196 Dec 196 Dec 19
Please refer to SOW for further details pertaining to this package.
Supply of 220kV Steel Transmission Towers14 Nov 1911 Dec 1911 Dec 19
Please refer to SOW for further details pertaining to this package.
Above Ground Electrical SF14 Nov 1913 Dec 1913 Dec 19
Please refer to further details pertaining to the SOW on this package.
Concrete Works SF Sub14 Nov 1913 Dec 1913 Dec 19
Please refer to SOW for further details pertaining to this packge.
Pile Installation SF14 Nov 1913 Dec 1913 Dec 19
Please refer to SOW for further details pertaining to this package.
Underground AC MV Trench and Cable Installation14 Nov 1913 Dec 1913 Dec 19
Please refer to SOW for further details pertaining to this package.