Chichester Transmission and Solar Project



Contact Details


Linus O'Brien
+61 8 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: In progress
  Project Owner DOWNER UTILITIES AUSTRALIA PTY LTD

Project Details


The Chichester Transmission and Solar Project (EPC) is being delivered by Downer Utilities for Alinta Energy.


The project is approximately 100 km north of Newman in Western Australia, within the East Pilbara Shire Council area.


It comprises a utility-scale 60MW solar farm, new substation at FMG Christmas Creek and Cloudbreak Mine sites, and substation expansion at Roy Hill Mine.


The project will connect to the 220kV Roy Hill to Cloudbreak power transmission line. The proposed solar PV field will occupy ~150 ha & consist of ~150,000 panels mounted on a single axis tracking system. The transmission line will include 60 km of transmission infrastructure.

SHOW LESS

Work Packages


There are currently no open work packages for this project.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Freight Domestic 

Full scope has been awarded to:


Please refer to the scope of works document for details of the package
Tree Removal and Clearing and Grubbing 

Full scope has been awarded to:


Please refer to the scope of woks document for details of the package
Earthworks 

Full scope has been awarded to:


Please refer to SOW for further details pertaining to this package.
Supply of DC Cables SF 

Full scope has been awarded to:


Please refer to SOW for further details pertaining to this package.
Supply of MV Cables SF 

Full scope has been awarded to:


Please refer to SOW for further details pertaining to this package.
Labour Hire Support for Project 

Full scope has been awarded to:


Please refer to the scope of works document for details of the package
Supply Steel support structures for substation primary equipment 

Full scope has been awarded to:


Please refer to the scope of works document for details of the package
Supply of 220kV Overhead Transmission Conductor 

Full scope has been awarded to:


Please refer to SOW for further details pertaining to this package.
Supply of 220kV Steel Transmission Towers 

Full scope has been awarded to:


Please refer to SOW for further details pertaining to this package.
Pile Installation SF 

Full scope has been awarded to:


Please refer to SOW for further details pertaining to this package.
Underground AC MV Trench and Cable Installation 

Full scope has been awarded to:


Please refer to SOW for further details pertaining to this package.
Supply of Water Carts and Service Carts22 Nov 201902 Dec 201902 Dec 2019
Please refer to the scope of works document for details of the package
Above Ground Electrical SF14 Nov 201913 Dec 201913 Dec 2019
Please refer to further details pertaining to the SOW on this package.
Concrete Works SF Sub14 Nov 201913 Dec 201913 Dec 2019
Please refer to SOW for further details pertaining to this packge.
PV Module Install14 Nov 201920 Dec 201920 Dec 2019
Please refer to SOW for further details pertaining to this work.
PV Module Tracker Installation14 Nov 201920 Dec 201920 Dec 2019
Please refer to SOW for further details pertaining to this package.