STANDARD LISTINGS ▲ CONTRACT
|
STATUS
|
|
BRIDGES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Bridge Bearings | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| A bridge bearing is a component of a bridge which typically provides a resting surface between bridge piers and the bridge deck. |
| | Bridge Deck Joints | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Bridge expansion joints designed to allow for continuous traffic between structures while accommodating movement, shrinkage, and temperature variations on reinforced and prestressed concrete, composite, and steel structures. |
| | Concrete Cutting | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply |
| | Concrete Place and Finish | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Concrete pouring, finishing and curing |
| | Concrete Pumping | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Concrete pumping equipment and services. |
| | Concrete Supply | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply of concrete. |
| | Demolition | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Demolition of pre-existing buildings and structures and removal of demolition waste from site. |
| | Formwork | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Temporary or permanent molds into which concrete or similar materials are poured. |
| | Piling Service and Materials | 02 Dec 2019 | 30 Mar 2021 | 30 Mar 2021 | 
| | |
| Supply of piling services and materials including steel pile liners. |
| | Post Tensioning | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Post-tensioning is a method of reinforcing concrete, used extensively in the construction and refurbishment of bridges. Once the concrete has gained strength, tension is then applied, pulling the tendons and anchoring them against the outer edges of the concrete, before service loads are applied. |
| | Precast Concrete Headstock and Wingwalls | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Precast Concrete Headstock and Wingwalls |
| | Prestressed Concrete Deck Slab Girders | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Prestressed Concrete Deck Slab Girders |
| | Reinforced Earth Retaining Walls and Soil Structures | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Supply and/ or installation of reinforced earth retaining walls and soil structures. |
| | Reinforcing Steel | 02 Dec 2019 | 30 Mar 2021 | 30 Mar 2021 | 
| | |
| Reinforcing steel products including bar, cage, mesh and rod. |
| | Scaffolding | 02 Dec 2019 | 30 Mar 2021 | 30 Mar 2021 | 
| | |
| Supply and installation of scaffolding. |
| | Steel Fixing | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Positioning and securing steel reinforcing bars, also known as rebar, and steel mesh used in reinforced concrete on construction projects. |
| | Steel Walkway and Guardrail | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Manufacture and/ or supply of steel walkway and guardrails. |
STATUS
|
|
BULK EARTHWORKS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Asbestos Removal | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Site decontamination services including asbestos management and removal. |
| | Clearing and Grubbing | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Clearing includes cutting, taking down, removing and disposing of everything above ground level, except where such trees, vegetation, structures or specific sites are designated to remain.
Grubbing consists of the removal and disposal of surface vegetation, the bases of stumps, roots, the underground parts of structures and other obstructions to the depth specified in the earthworks specifications. |
| | Construction Water - Storage Tanks | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Groundwater extraction and storage facilities with 50kL water tank, including pumps and pipework. |
| | Construction Water - Supply and Cart | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply and cartage of construction water for soil compaction activities and dust suppression of haul roads. |
| | Excavation Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Excavation work generally means work involving the removal of soil or rock from a site to form an open face, hole or cavity using tools, machinery or explosives. trenches, shafts and tunnels |
| | General Earthworks | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| General earthworks (cut, fill, subgrade treatment) and track formation reconstruction. |
| | Geotextiles | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Permeable fabrics which, when used in association with soil, have the ability to separate, filter, reinforce, protect, or drain. |
| | Grading Contractor | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply |
| | Material Cartage and Haulage | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Wet and dry hire of dump trucks to transport and remove/ dispose of spoil and topsoil. |
| | Plant and Equipment - Roadheaders | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Plant and Equipment - Roadheaders |
| | Plant and Equipment - Specialist Foundation Equipment | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Plant and Equipment - Specialist Foundation Equipment |
| | Plant and Equipment - Spoil Conveyance Systems and Equipment | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Plant and Equipment - Spoil Conveyance Systems and Equipment |
| | Plant Hire - Large | 02 Dec 2019 | 30 Mar 2021 | 15 Nov 2020 | 
| | |
| Wet and dry hire of large plant which may include compactors, dozers, earthmovers, excavators, graders, rollers and scrapers. |
| | Quarries and Quarry Materials | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply general fill materials. |
| | Testing Services - Materials | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Testing of material (including concrete and soil) for construction on the basis of its geotechnical qualities. |
| | Lime Stabilisation | 20 Oct 2020 | 15 Nov 2020 | | 
| | |
| Supply and/ or installation of commercial grade lime for in-situ soil stabilisation. |
| | On Site Treatment of Materials | 02 Dec 2019 | 15 Nov 2020 | | 
| | |
| Mix/blend cut/excavated material, removed track formation material and/or imported fill from quarry, including stockpile management of output material. |
| | Survey Services | 02 Dec 2019 | 15 Nov 2020 | | 
| | |
| Cadastral survey - Survey (site) and setting-out services; condition survey; contour or detail survey; dilapidation survey; identification survey; land survey |
STATUS
|
|
CAPPING ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Capping Material | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply of well-graded natural or artificially blended gravel/soil placed directly below the ballast layer. Capping material must be capable of providing structural support to the ballast layer and shedding water from the ballast away from the formation |
STATUS
|
|
DRAINAGE ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Ballast Cages with Precast Concrete Pits | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Ballast cage with 600x600x600 precast concrete pit and galvanised grate |
| | Drainage Installation Services - Surface Drains | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Installation of cut off and table drains, and low flow and toe channels. |
| | High-Density Polyethylene (HDPE) Slotted Drain Pipe | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Manufacture and/ or supply of HDPE slotted drain pipe |
| | Pipe and Culvert Laying | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Laying of precast concrete pipes and culverts. |
| | Piping Valves and Fittings | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Supply of water and sewer piping, valves and fittings. |
| | Precast Concrete Drainage Junction Pits | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Precast concrete storm water pit base units and risers, suitable for junction pits, kerbs and grated inlets |
| | Reinforced Concrete Pipe | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Reinforced concrete pipes, headwalls and wingwalls with diameters 300mm - 600mm. |
| | Reinforced Concrete Box Culverts | 02 Dec 2019 | 15 Nov 2020 | | 
| | |
| Precast concrete structure that allows water to flow under a road, railroad, trail, or similar obstruction from one side to the other side.
Includes headwalls, wingwalls and scour protection." |
STATUS
|
|
EARLY WORKS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Container Hire | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Short and long-term hire of shipping and/ or storage containers. |
| | Drilling Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Drilling for water bores |
| | Electrical Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Electrical works including including low voltage electrical, data and communications, Incoming power to site for construction purposes and internal reticulation for same. |
| | Geotechnical Investigations and Monitoring | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Geotechnical investigations are performed by geotechnical engineers or engineering geologists to obtain information on the physical properties of soil earthworks and foundations for proposed structures and for repair of distress to earthworks and structures caused by subsurface conditions. |
| | Plumbing Services. | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Hydraulics reticulation for construction purposes. |
| | Temporary Fencing and Hoarding | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Temporary construction access gates, barriers, fencing, hoardings and noise walls on and around the Site; |
STATUS
|
|
FACILITIES AND FACILITY SERVICES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Accommodation Village (Camp) - Operations and Maintenance | 02 Dec 2019 | 15 Nov 2020 | 27 Jan 2021 | 
| | |
| Operational management of the accommodation village including coordination of services such as catering, housekeeping, grounds maintenance and security. |
| | Housing and Accommodation Service Providers | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Provision of short and long-term accommodation services. |
| | Information Technology Infrastructure | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Could include, but is not limited to communications rack, conduits, data cabling, IT cabinets, permanent power/ temporary power/ backup power. |
| | Office Furniture and Equipment | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Provision of office furniture including book shelves, chairs, desks, filing cabinets, stationery cupboards, whiteboards etc) |
| | Security Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Site security including mobile patrols and static guards. |
| | Site Cleaning | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Site office cleaning and progressive / final construction cleaning services. |
| | Site Facilities (Temporary) | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Temporary site facilities including ablutions / amenities blocks, camp accommodation, crib rooms, offices and sheds. |
| | Transport Services - Bus and/ or Coach Hire | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Bus/ coach charter services for the transport of site workers. |
STATUS
|
|
FENCING ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Fences and Gates | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Removal of existing rail boundary fences and gates; Supply and installation of rural fences and gates and chainwire fencing. |
STATUS
|
|
MISCELLANEOUS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Any Opportunities | 12 Nov 2019 | 30 Mar 2021 | | 
| | |
| Please register your interest for any opportunities that may arise on the project. |
STATUS
|
|
NOISE WALLS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Artwork | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Artwork to community side of noise barrier |
| | Gabions | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Gabion is a cage, cylinder, or box filled with rocks, concrete, or sometimes sand and soil for use in civil engineering, road building, military applications and landscaping |
| | Noise Walls | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Noise barriers comprising galvanised steel post and precast panels. |
STATUS
|
|
PRODUCTS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Bolts Bars and Fasteners | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Supply of bolts bars and fasteners |
| | Landscaping Products - Hard and Soft | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Supply of hard and soft landscaping products including:
-Construction materials including brick, timber (decking and fencing), stone (pavers and tiles) and rocks and aggregates.
-Vegetative materials including mulch, plants, sand, soils, trees and turf. |
| | Personal Protective Equipment and Clothing PPEC). | 06 Apr 2020 | 30 Mar 2021 | | 
| | |
| Manufacturers and suppliers of PPE&C including safety boots- eye wear-gloves -
helmets -work wear etc. |
STATUS
|
|
PROFESSIONAL SERVICES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Environmental and Rehabilitation Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply |
| | Heritage Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Including Cultural Heritage Services |
| | Labour Hire and Recruitment Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Short and long-term labour hire and training solutions. |
| | Landscaping Services | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Provision of landscaping services. |
| | Pre-employment Medical Assessment Services | 09 Apr 2020 | 30 Mar 2021 | | 
| | |
| Provision of pre-employment medical evaluation services including drug and alcohol testing, work fitness assessments, audiometry, vision assessment, and statutory and code of practice screening. |
| | Site Contamination Consultant | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Provision of site contamination consultancy services including assessing the existence or nature or extent of site contamination. |
| | Training Service Providers | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Training service providers including Group Training Organisations and Registered Training Organisations. |
| | Vacuum Excavation and Service Locating | 20 Oct 2020 | 30 Mar 2021 | | 
| | |
| Locating and clean exposure of a variety of utility services. |
STATUS
|
|
ROADS AND CROSSINGS (LEVEL CROSSINGS) ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Asphalt and Seals | 02 Dec 2019 | 30 Mar 2021 | 30 Mar 2021 | 
| | |
| Supply and lay asphalt and Seals for road surfaces |
| | Precast Concrete Panels | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Precast Concrete Panels |
| | Road Construction and/ or Maintenance Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Repair of existing Rail Maintenance Access Road, by regrading and constructing a Type 3 arrangement |
| | Road Safety Barriers/ Roadside Barriers | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Products including guardrails, road barrier systems and safety crash barriers. |
| | Road Signage | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Road Signage |
| | Signalling and Control Lights | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Signalling and Control Lights |
| | Steel Plate Assembly | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Steel Plate Assembly |
| | Traffic Management | 02 Dec 2019 | 30 Mar 2021 | 30 Sep 2020 | 
| | |
| Labour and Variable Message Signage (VMS) |
STATUS
|
|
SIGNAGE ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Signage - External | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| External banners and signage, wayfinding signage |
STATUS
|
|
TRACKWORK ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Ballast | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Track ballast forms the trackbed upon which railroad ties are laid. It is used to bear the load from the railroad ties, to facilitate drainage of water, and also to keep down vegetation that might interfere with the track structure. |
| | Plant and Equipment - Flashbutt Welding Machines | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Flash welding is a type of resistance welding that does not use any filler metals. |
| | Plant and Equipment - Surfacing Machines | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply |
| | Plant and Equipment - Tracklaying Machinery | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply |
| | Track Removal and Installation Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Services include removal of existing rail, sleepers and ballast and installation of new ballast, sleepers and rail. |
| | Welding Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| weld using mobile flash-butt welding machines and aluminothermic welding |
STATUS
|
|
TRANSPORT, HIRE AND LOGISTICS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Courier Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Provision of freight and parcel delivery services. |
| | Cranes and Cranage Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Wet and dry hire of mobile cranes. |
| | Equipment Hire - Small | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Hire of compressors, floodlighting, diesel generators etc. |
| | Fuels and Lubricants - Supply and/or Storage | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Supply and storage of bulk diesel fuel and lubricants. |
| | Plant and Equipment - Maintenance Services | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| On-site maintenance and servicing of plant and equiopment. |
| | Plant and Equipment - Slurry Treatment Plants | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Plant that enables the excavated material to be separated out for disposal or reuse |
| | Vehicle Hire - 4WD Vehicles | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Long and short-term hire of 4x4 utility vehicles. |
| | Waste Management Services - Liquids and/ or Solids | 02 Dec 2019 | 30 Mar 2021 | | 
| | |
| Demolition material, liquids, rubbish and spoil removal and disposal from site. |