USFPI Northern Territory Training Areas & Ranges Project



Contact Details


  Industry Capability Network (NT)
  +61 8 8922 9422
 CONTACT EMAIL

  Locations: NT Australia (Onshore)
  Project Value: $514M
  Project Status: Planning Phase
  Project Owner SITZLER PTY LTD

Project Details


The NT Training Areas and Ranges Project seeks to upgrade and expand the existing facilities at Robertson Barracks Close Training Area (RBTA), Kangaroo Flats Training Area (KFTA), Mt Bundey Training Area (MBTA); and Bradshaw Field Training Area (BFTA) to support the United States Forces Posture Initiative (USFPI) within the Territory.

Sitzler Pty Ltd has been awarded the Managing Contractor role for this large scale project and is now requesting Registrations of Interest (ROI) from trade subcontractors and suppliers interested in participating in this expansive Territory-based project.

Delivery Phase works are scheduled to commence in late 2021 and be completed in 2025, however, construction commencement is contingent on Departmental, Government and Parliamentary approvals.

A summary of the indicative scope of works includes:

  • Decommissioning of select facilities and ranges,
  • Upgrade of existing training area facilities,
  • Construction of new facilities including range control, weapons ranges, obstacle courses, aircraft landing sites, vehicle wash points, camp and medical facilities,
  • Provision of new roads and upgrades to existing roads,
  • Provision of new services infrastructure and upgrades to existing services; and
  • New heavy-duty hardstand

As a local industry champion, Sitzler is committed to maximising local industry and Indigenous participation and will continue to communicate via the ICN Gateway platform throughout the course of the project. To ensure you receive all correspondence regarding this project, please register your interest below.

Sitzler looks forward to working with local industry in the delivery of exemplary facilities for the Commonwealth.

The Code for Tendering and Performance of Building Work 2016 applies to the building work associated with this project. By submitting an expression of interest in, or tender for this project, you will become subject to the Code for the Tendering and Performance of Building Work 2016.

SHOW LESS

Project Documents


Industry Briefing 201119

  ▲ CONTRACT
201119 EST01990 EOI Planning Industry Presentation

News and Media

  ▲ CONTRACT
Media release - NT company secures $22m contract 041019
SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Any Opportunities4 Oct 19 31 Dec 25
Express interest for any opportunities that may arise for this project.
STATUS   PLANNING PHASE    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
02 BUILDING CERTIFICATION20 Nov 192 Dec 19 
Assessment of ALL relevant structures and buildings for the project and interpretation of compliance with the Building Code, relevant Acts and Regulations.

Please sign into your company profile to download the EOI returnable schedule document.
03a RANGE DESIGN TECHNICAL SPECIALIST - OPTION A - COMPLETE SCOPE20 Nov 192 Dec 19 
Ownership of all aspects of the design within the defined battery limits of the ranges as defined in the MPFR and including completion of range templates, layouts and design to support the new STICTS training concept.

Please sign into your company profile to download the EOI returnable schedule document.
03b RANGE DESIGN TECHNICAL SPECIALIST - OPTION B - PARTIAL SCOPE - RANGE TECHNICAL DESIGN20 Nov 192 Dec 19 
Works Package 03b Option B involves the scope for Range design but excludes civil (earthworks, stormwater, pavement and hardstand), structural elements, infrastructure and ICT integration.

Please sign into your company profile to download the EOI returnable schedule document.
03c RANGE DESIGN TECHNICAL SPECIALIST - OPTION C - PARTIAL SCOPE - RANGE CIVIL DESIGN20 Nov 192 Dec 19 
Works Package 03c Option C excludes Range Technical Design, and includes all civil works inclusive of Work Package 04 (ie. Inside and outside of Ranges battery limit). This package requires significant coordination with the Range Technical Design consultant from Works Package 3b for all scope within the Ranges battery limit.

Please sign into your company profile to download the EOI returnable schedule document.
04 CIVIL AND STRUCTURAL ENGINEERING20 Nov 192 Dec 19 
Provision of all civil and structural design inputs for all works outside of the Ranges battery limit (referenced in packages 03a, 03b,03c), including Training Area buildings, facilities and supporting infrastructure.

Please sign into your company profile to download the EOI returnable schedule document.
05 MEP AND SUPPORT DISCIPLINES20 Nov 192 Dec 19 
Outside of the Ranges battery limits Provision of Mechanical/Electrical/Plumbing (MEP) design for all inputs external and internal to buildings and structures.

Please sign into your company profile to download the EOI returnable schedule document.
06 COMMUNICATIONS AND SECURITY20 Nov 192 Dec 19 
Provision of all ICT and Security design at a Training Area/infrastructure level and within buildings including electronic, comms, audio visual and physical security design advice and design.

Please sign into your company profile to download the EOI returnable schedule document.
07 ARCHITECTURAL AND LANDSCAPE SERVICES20 Nov 192 Dec 19 
All architectural works for the project including the development of necessary precincts related to Ranges and admin/support areas.

Please sign into your company profile to download the EOI returnable schedule document.
08 COST PLANNING20 Nov 192 Dec 19 
Preparation of the Cost Plan for both the Planning and if approved the Delivery Phases for each of the design review milestones.

Please sign into your company profile to download the EOI returnable schedule document.
09 DIGITAL ENGINEERING / BIM20 Nov 192 Dec 19 
Nominate for Works Package 09 Digital Engineering / BIM only if the sub-contractor preselects Works Package 03 Range Design Technical scope, 04 Civil/Structural scope, 05 MEP, and/or 07 Architectural Services and would assume role of lead consultant.

Please sign into your company profile to download the EOI returnable schedule document.
10 ENVIRONMENTAL CONSULTANT SERVICES AND INVESTIGATIONS20 Nov 192 Dec 19 
Development and management of all environmental investigations and assessments during the Planning Phase as necessary.

Please sign into your company profile to download the EOI returnable schedule document.
12 LAND SURVEYING20 Nov 192 Dec 19 
All Land surveying for the Project scope including both new and existing roads and facilities to inform design.

Please sign into your company profile to download the EOI returnable schedule document.
13 GEOTECHNICAL ENGINEERING AND INVESTIGATIONS20 Nov 192 Dec 19 
Provision of geotechnical assessment and investigations.

Please sign into your company profile to download the EOI returnable schedule document.
14 WATER SUPPLY INVESTIGATIONS20 Nov 192 Dec 19 
Assessment and investigation capacity for groundwater.

Please sign into your company profile to download the EOI returnable schedule document.