  Project Status: Project Execution Phase
  Project Owner PILBARA ENERGY COMPANY PTY LTD

Project Details


Project Overview:


Fortescue Metals Group (Fortescue) is a global leader in the iron ore industry, recognised for its culture, innovation and industry-leading development of world class infrastructure and mining assets in the Pilbara, Western Australia.


Fortescue’s Energy Strategy focusses on implementing innovative and practical solutions to reduce emissions and ensures that the use of gas and renewable energy sources are considered during the development and replacement of power stations.


In an effort to increase the connectivity of the Pilbara to drive efficient power use, Pilbara Energy Company, a subsidiary of Fortescue, plans to develop the Pilbara Transmission Project, a high voltage power transmission network


The Project aims to integrate Fortescue’s iron ore mining and port operations in the Pilbara into one common 220kV network. This will enable Fortescue’s existing Solomon Mine power station to supply power to Fortescue’s $US2.6 billion Iron Bridge Magnetite Project, currently in development. It will also have the ability to expand and connect to other assets.


Pilbara Energy Company is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the Industry Capability Network (ICN) Gateway.   


Scope Overview:


The Pilbara Transmission Project will require the establishment of:

  • <400km high voltage transmission lines
  • 5 high voltage substations


Construction will be broken into three (3) stages:


  • Stage 1: Solomon to Iron Bridge
    • 223km
    • 220kV dual circuit
    • 4 x 220kv terminal substations
    • 2 x overhead fibre OPGW


  • Stage 2: Lambda to Cloudbreak
    • 78km
    • 220kV single circuit
    • 1 x overhead fibre OPGW


  • Stage 3: North Star to Port Hedland
    • 97km
    • 220kV single circuit
    • 1 x 220kv terminal substation
    • 1 x overhead fibre OPGW


Indicative Timeline:

Procurement of poles, transmission lines, conductors and OPGW from November 2019.

Construction of earthworks and civils from early 2020.

Construction of transmission lines from early 2020.

Design and construction of substations from December 2019.

Practical Completion of Stage 1 by mid-2021.


Local and indigenous participation:           

In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for Pilbara Transmission Project tendering opportunities.

SHOW LESS

Work Packages


There are currently no open work packages for this project.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Pilbara Transmission Project - Any Opportunities19 Sep 197 Oct 19 
Express interest for any opportunities that may arise for this project.
Construction of Civils7 Oct 1921 Oct 1921 Oct 19
Please refer to the scope of works document for details of the package
Construction of Earthworks7 Oct 1921 Oct 1921 Oct 19
Please refer to the scope of works document for details of the package
Construction of Trans Lines7 Oct 1921 Oct 1921 Oct 19
Please refer to the scope of works document for details of the package
Design and Construction of Substations7 Oct 1921 Oct 1921 Oct 19
Please refer to the scope of works document for details of the package
Procurement of Conductors7 Oct 1921 Oct 1921 Oct 19
Please refer to the scope of works document for details of the package
Procurement of poles7 Oct 1921 Oct 1921 Oct 19
Please refer to the scope of works document for details of the package
Supply of Concrete7 Oct 1921 Oct 1921 Oct 19
Please refer to the scope of works document for details of the package
Fabrication and Supply of Power Distribution and Earthwork Transformers9 Oct 1923 Oct 1923 Oct 19
Please refer to scope of work for further details pertaining to this package.
Fabrication and Supply of Modular Bay Compact Indoor Gas Insulated Switchgear19 Nov 194 Dec 194 Dec 19
Please refer to the scope of works document for details of the package