  Project Status: Project Execution Phase
  Project Owner PILBARA ENERGY COMPANY PTY LTD

Project Details


Project Overview:


Fortescue Metals Group (Fortescue) is a global leader in the iron ore industry, recognised for its culture, innovation and industry-leading development of world class infrastructure and mining assets in the Pilbara, Western Australia.


Fortescue’s Energy Strategy focusses on implementing innovative and practical solutions to reduce emissions and ensures that the use of gas and renewable energy sources are considered during the development and replacement of power stations.


In an effort to increase the connectivity of the Pilbara to drive efficient power use, Pilbara Energy Company, a subsidiary of Fortescue, plans to develop the Pilbara Transmission Project, a high voltage power transmission network


The Project aims to integrate Fortescue’s iron ore mining and port operations in the Pilbara into one common 220kV network. This will enable Fortescue’s existing Solomon Mine power station to supply power to Fortescue’s $US2.6 billion Iron Bridge Magnetite Project, currently in development. It will also have the ability to expand and connect to other assets.


Pilbara Energy Company is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the Industry Capability Network (ICN) Gateway.   


Scope Overview:


The Pilbara Transmission Project will require the establishment of:

  • <400km high voltage transmission lines
  • 5 high voltage substations


Construction will be broken into three (3) stages:


  • Stage 1: Solomon to Iron Bridge
    • 223km
    • 220kV dual circuit
    • 4 x 220kv terminal substations
    • 2 x overhead fibre OPGW


  • Stage 2: Lambda to Cloudbreak
    • 78km
    • 220kV single circuit
    • 1 x overhead fibre OPGW


  • Stage 3: North Star to Port Hedland
    • 97km
    • 220kV single circuit
    • 1 x 220kv terminal substation
    • 1 x overhead fibre OPGW


Indicative Timeline:

Procurement of poles, transmission lines, conductors and OPGW from November 2019.

Construction of earthworks and civils from early 2020.

Construction of transmission lines from early 2020.

Design and construction of substations from December 2019.

Practical Completion of Stage 1 by mid-2021.


Local and indigenous participation:           

In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for Pilbara Transmission Project tendering opportunities.

SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
540PTC0002 Construction of Earthworks 
  

Full scope has been awarded to:

NEMMS JV Pty Ltd

Sub-contracting opportunities:
Name: Peter Hines
Position: Procurement Superintendent
Phone Number: 61 08 6166 2400
Email Address: queries@nemmsjv.com.au
Address: 21 Colray Avenue Osborne Park WA 6017

Employment opportunities:
Name: Alana Sullivan
Position: Human Resources Superintendent
Phone Number: 61 08 6166 2400
Email Address: queries@nemmsjv.com.au
Address: 21 Colray Avenue Osborne Park WA 6017

Please refer to the scope of works document for details of the package
540PTC0003 Construction of Civils Foundations 
  

Full scope has been awarded to:

Powerlines Plus Pty Ltd

TBC

Please refer to the scope of works document for details of the package
540PTC0004 Construction of Transmission Lines 
  

Full scope has been awarded to:

Powerlines Plus Pty Ltd

TBC

Please refer to the scope of works document for details of the package
540PTC0005 Design and Construction of Substations 
  

Full scope has been awarded to:

Powerlines Plus Pty Ltd

Sub-contracting opportunities:
Name: Eoin Gorman
Position: Contracts Manager
Phone Number: 0409105764
Email Address: eoin.gorman@powerlinesplus.com.au
Address: Level 1, 63 Abernethy Road, Belmont WA 6104

Employment opportunities:
Name: Eoin Gorman
Position: Contracts Manager
Phone Number: 0409105764
Email Address: eoin.gorman@powerlinesplus.com.au
Address: Level 1, 63 Abernethy Road, Belmont WA 6104

Please refer to the scope of works document for details of the package
540PTC000X Supply of Concrete 
  

Full scope has been awarded to:

Mobile Concreting Solutions Pty Ltd

Employment opportunities:
Name: Susan Yu
Position: HR Manger
Phone Number: 08 9200 1840
Email Address: hr@mobileconcrete.com.au
Address: L1. 985 Wellington Street, West Perth 6005

Please refer to the scope of works document for details of the package
540PTP0001 Procurement of Poles 
  

Full scope has been awarded to:

Valmont (Industrial Galvanizers Corporation Pty Ltd) trading as INGAL EPS

Sub-contracting opportunities:
Name: Mr. Tad Jarominek
Position: Operations Manager
Phone Number: 02 9827 3338
Email Address: tad.jarominek@valmont.com
Address: 57-65 Airds Road, Minto NSW 2566

Employment opportunities:
Name: Mr. Mike Spry
Position: Human Resources Manager (Valmont ANZ)
Phone Number: 07 3718 2524
Email Address: Michael.spry@valmont.com
Address: 661 Curtin Ave East, Pinkenba, QLD 4008 Australia

Please refer to the scope of works document for details of the package
540PTP0002 Procurement of Conductors 
  

Full scope has been awarded to:

Jiangsu Zhongtian Technology Co Ltd t/a ZTT Cable

Sub-contracting opportunities:
Name: Mount Wan
Position: Country Manager
Phone Number: +86 13912864203; +61 499380381
Email Address: Mount.wan@zttcable.com
Address: 88 Qixin Road, Nantong ETDA, Nantong, Jiangsu, P.R China 226009

Employment opportunities:
Name: Kelly Zhu
Position: HR Manager
Phone Number: +86 15062720841
Email Address: kelly.zhu@zttcable.com
Address: 88 Qixin Road, Nantong ETDA, Nantong, Jiangsu, P.R China 226009

Please refer to the scope of works document for details of the package
540PTC0003 Fabrication and Supply of Power Distribution and Earthwork Transformers 
  

Full scope has been awarded to:

Wilson Transformer Company Pty Ltd

Sub-contracting opportunities:
Name: Muthu Subramaniam
Position: Bids & Solutions Manager
Phone Number: 03 8544 2342 / 0409377967
Email Address: Muthu.subramaniam@wtc.com.au
Address: Wilson Transformer Company Pty Ltd. 310 Springvale Road, Glen Waverley, Victoria 3150, Australia

Employment opportunities:
Name: Muthu Subramaniam
Position: Bids & Solutions Manager
Phone Number: 03 8544 2342 / 0409377967
Email Address: Muthu.subramaniam@wtc.com.au
Address: Wilson Transformer Company Pty Ltd. 310 Springvale Road, Glen Waverley, Victoria 3150, Australia

Please refer to scope of work for further details pertaining to this package.
540PTC0007 Power Management System 
  

Full scope has been awarded to:

ABB Power Grids Australia Pty Ltd

Sub-contracting opportunities:
Name: Hitachi ABB Power Grids' Customer Connect Center
Position: N/A
Phone Number: +61 2 9158 3274
Email Address: power-grids@hitachi-powergrids.com
Address: 757 Ann Street, Fortitude Valley, Queensland
https://www.hitachiabb-powergrids.com/au/en/contact-us

Employment opportunities:
Name: Hitachi ABB Power Grids' Customer Connect Center
Position: N/A
Phone Number: +61 2 9158 3274
Email Address: power-grids@hitachi-powergrids.com
Address: 757 Ann Street, Fortitude Valley, Queensland
https://www.hitachiabb-powergrids.com/au/en/contact-us

Please refer to SOW for further additional information pertaining to this package.
540PTP0004 Fabrication and Supply of Modular Bay Compact Indoor Gas Insulated Switchgear19 Nov 201904 Dec 201904 Dec 2019
  
Please refer to the scope of works document for details of the package
540PTC0015 Transmission Line Detailed Design (Stage 2)19 Jun 202003 Jul 202003 Jul 2020
  
Please refer to SOW for further details pertaining to this work.
540PTC0014 Network Assurance and Integration Resources21 Aug 202004 Sep 202004 Sep 2020
  
Please refer to SOW for further details pertaining to this work.
540PTC0019 Construction of Earthworks Access and Pads21 Dec 202012 Jan 202112 Jan 2021
  
Please refer to SOW for further details pertaining to this package.
540PTC0020 Construction of Civils21 Dec 202012 Jan 202112 Jan 2021
  
Please refer to SOW for further details pertaining to this package.
540PTP0006 Supply of Transmission Line Poles21 Dec 202012 Jan 202112 Jan 2021
  
Please refer to SOW for further details pertaining to this package.
540PTC0021 Construction of Transmission Lines23 Dec 202013 Jan 202113 Jan 2021
  
Please refer to SOW for additional information pertaining to this package.
540PTC0022 Design and Construction of Substations23 Dec 202013 Jan 202113 Jan 2021
  
Please refer to SOW for further information pertaining to this package.
540PTP0008 Supply of Transformers23 Dec 202013 Jan 202113 Jan 2021
  
Please refer to SOW for additional information pertaining to this SOW.
540PTC0024 Supply of Concrete Batch Plant23 Dec 202014 Jan 202114 Jan 2021
  
Please refer to SOW for further information pertaining to this package.
540PTP0007 Supply of Conductor and OPGW23 Dec 202014 Jan 202114 Jan 2021
  