MacIntyre Wind Farm



Contact Details


  Jatin Patel
  +61 7 3364 0670
 CONTACT EMAIL

  Locations: QLD Australia (Onshore)
  Project Value: $1 billion
  Project Status: Planning
  Project Owner ACCIONA ENERGY AUSTRALIA GLOBAL PTY LTD

Project Details


About ACCIONA

In Australia, ACCIONA has constructed four wind farms and a 20 MW solar farm. The wind farms include Waubra in Victoria, Gunning in New South Wales, Cathedral Rocks in South Australia, Mt Gellibrand Wind Farm in Victoria and construction of a fifth wind farm is underway in Mortlake, Victoria. Collectively, ACCIONA has over 450 MW of operational renewable energy assets in Australia.


About MacIntyre Wind Farm

The MacIntyre Wind Farm will be located within 40,000 hectares of leased land approximately 200 kms south-west of Brisbane and approximately 50 kms south-west of Warwick in Queensland. ACCIONA plans to submit a development application seeking a development permit for a Material Change of Use (MCU) to allow construction and operation of the wind farm to the State Assessment and Referral Agency (SARA) in early 2020. The project is expected to produce 540 MW of clean energy with up to 120 turbines and commence construction at the end of 2020 with a construction duration of 18-24 months.


This project will provide significant economic activity across the Goondiwindi, Southern Downs and Toowoomba Regional Council areas, generate a construction workforce of up to 350 jobs with up to 12 fulltime positions on site once operational. ACCIONA will provide a Community Enhancement Program to strategically deliver added value to the local regional over the life cycle of the project, whilst providing clean energy equivalent to the consumption of around 200,000 homes


The project will deliver significant economic benefits to the region, including the creation of jobs, rates to the local government, rent to participating landowners.


  • Wind turbines – up to 120 machines, with steel towers.
  • Substations – up to two substations, with compound areas of around 140 x 180m and  each holding one power transformer.
  • Access tracks – Approximately 120km of access tracks may be required for the project.
  • Electrical cabling – underground electrical cabling up to 175km at 33kV.
  • Overhead transmission line – 55km of new 330kV transmission line
  • Temporary construction compounds – car parking, storage facilities, site office, amenities, etc.
  • Permanent site facilities – including a maintenance and control facility, met masts, etc.
  • Public roads – up to 9km of public road upgrades


More details on the project can be found at https://www.acciona.com.au/projects/energy/wind-power/macintyre-wind-farm/ 


Expression Of Interest


ACCIONA encourages local industry interested in supplying to the project to register an expression of interest (EOI) through the ICN Gateway webpage.


Information on specific supply opportunities will be communicated on the ICN Gateway project page as it becomes available, with local industry able to register its interest against them.


Please ensure that:

  • Your company profile on the ICN Gateway is complete, up-to-date and accurate including electing to be notified via e-mail of supply opportunities
  • You register your interest as a full or partial scope supplier (where applicable), and
  • You respond to all project and work package-specific questions.


It is important that businesses submitting an EOI are aware that their submission does not guarantee that they will progress further in the procurement process. Only companies that can demonstrate capability and capacity in accordance with ACCIONA’s standards will be invited to pre-qualify for specific opportunities.


Further Assistance


ACCIONA strongly encourage local industry to contact the ICN Queensland in the first instance to improve their understanding of the EOI process.


ACCIONA’s primary contact is:

Senior Manager, Supply Chain

macintyre@acciona.com

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Civil works23 Sep 1917 Dec 19 
Internal and external roads, concreting, quarries, steel supply, foundations, platforms and environmental restoration
Electrical23 Sep 1917 Dec 19 
Substation, MV reticulation, switchgear, generators, circuit breakers, cables, etc.
MacIntyre Wind Farm - Any Opportunities23 Sep 1917 Dec 19 
Express interest for any opportunities that may arise for this project.
Professional services23 Sep 1917 Dec 19 
quality, ecology, HSE, security, cleaning, administration, landscaping, PPE, field measurement equipment (i.e. met masts), etc.
Temporary construction facilities23 Sep 1917 Dec 19 
accommodation, security cabins, sheds, waste and recycling, safety testing, fencing, plumbing, etc.