Iron Bridge Magnetite Project



Contact Details


Andie Pfaff
ICN Coordinator
+61 8 9365 7735
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: Project Execution Phase
  Project Owner IB OPERATIONS PTY LTD

Project Details


Project owner: IB Operations Pty Ltd, as agent for Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd


Project Details:

The Iron Bridge Magnetite Project (Project) is for the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure at the Iron Bridge Magnetite Project site to support production of 22 wet million tonnes per annum (wmtpa) of high grade, magnetite concentrate product. The Iron Bridge site comprises the North Star, Eastern Limb, Glacier Valley and West Star magnetite iron ore deposits, located 145km south of Port Hedland.  

Delivery of first ore is expected in the first half of calendar year 2022, with ramp up to full production within 12 months.

IB Operations is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the ICN Gateway. 


Scope Overview:

The Project scope will require the establishment of new facilities, including:

·         mine

·         ore processing facility

·         slurry and return water pipeline

·         raw water pipeline

·         port infrastructure

·         non-process infrastructure, such as airstrip, village extension, telecommunications networks, electricity, water, sewage, and wastewater facilities. 


The Iron Bridge Project will be operated by IB Operations Pty Ltd, as agent for the Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd.  IB Operations Pty Ltd is an Australian private company, which is owned by FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd, each a participant in the unincorporated Iron Bridge Joint Venture.


Local and Indigenous participation:


In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for the Iron Bridge Magnetite Project tendering opportunities.

SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
NSC0038 Provision of Flocculants and Associated Services17 Nov 202009 Dec 202009 Dec 2020
Please refer to SOW for further details pertaining to this package.
NSC0043 Provision of Ceramic Grinding Media18 Nov 202010 Dec 202010 Dec 2020
Please refer to SOW for further details regarding this package.
NSC0042 Supply of Conveyor Rollers and Frames23 Nov 202015 Dec 202015 Dec 2020
Please refer to SOW for further details pertaining to this package.
NSC0041 Supply of Mobile Cranes24 Nov 202016 Dec 202016 Dec 2020
Please refer to SOW for further details.
662NSC5034 Maintenance of Regrind Mills25 Nov 202017 Dec 202017 Dec 2020
Please refer to SOW for further details pertaining to this package.
NSC0039 Supply of Goods and Offsite Refurbishment of Gearboxes25 Nov 202017 Dec 202017 Dec 2020
Please refer to SOW for further details pertaining to this package.
100C0677 Environmental Consultancy Services02 Dec 202024 Dec 202024 Dec 2020
Please refer to SOW for further details pertaining to this package.
662NSC0003 GEOTECHNICAL SERVICES 
  

Full scope has been awarded to:

4DGeotechnics Pty Ltd

Contact details for subcontracting opportunities:

Name: John Kennedy
Phone: +61 08 6212 9000
Email: jfk@4dg.com.au

Contact details for employment opportunities:

Name: John Kennedy
Phone: +61 08 6212 9000
Email: jfk@4DG.com.au

please refer to the scope of works document for details of the package
662NSP2002 High Pressure Grinding Rollers 
  

Full scope has been awarded to:

Weir Minerals Netherlands B.V.

Contact details for subcontracting opportunities:
Contact person: Erik Klaassen
Phone Number: +31773895162
Email Address: Erik.klaassen@mail.weir

Contact details for employment opportunities:
Contact person: Mirjam Ruiten
Phone Number: +31 6 30528984
Email Address: Mirjam.ruiten@mail.weir

Please review the scope of works for details of the package.
580PHC0003 Stacker - Canyon G 
  

Full scope has been awarded to:

Thyssenkrupp Industrial Solutions (Australia) Pty Ltd

Contact details for subcontracting opportunities:
Contact Name: Richard Edwards
Phone: 0428 284 792
Email: richard.Edwards@thyssenkrupp.com

Contact details for employment opportunities:
Contact Name: Valentina Vujacic
Phone: 08 9200 0100
Email: Valentina.Vujacic@thyssenkrupp.com

Please review the scope of works document for details of the package.
662NSP2001 Cone Crushers 
  

Full scope has been awarded to:

Weir Minerals Netherlands B.V.

Contact details for subcontracting opportunities:
Contact person: Erik Klaassen
Phone Number: +31773895162
Email Address: Erik.klaassen@mail.weir

Contact details for employment opportunities:
Contact person: Mirjam Ruiten
Phone Number: +31 6 30528984
Email Address: Mirjam.ruiten@mail.weir

Please review the scope of works document for details of the package.
662NSP2003 Air Classifier 
  

Full scope has been awarded to:

Weir Minerals Netherlands B.V.

Contact details for subcontracting opportunities:
Contact person: Erik Klaassen
Phone Number: +31773895162
Email Address: Erik.klaassen@mail.weir

Contact details for employment opportunities:
Contact person: Mirjam Ruiten
Phone Number: +31 6 30528984
Email Address: Mirjam.ruiten@mail.weir

Please review the scope of works document for details of the package.
662NSP2008 Coarse Ore Stockpile Radial Stacker 
  

Full scope has been awarded to:

THYSSENKRUPP INDUSTRIAL SOLUTIONS (AUSTRALIA) PTY LTD

Awarded Information for 662NSP2008 - Radial Stacker:-

Sub-contracting opportunities:
Name: Richard Edwards
Position: Head of Procurement
Phone Number: 0428 284 792
Email Address: Richard.edwards@thyssenkrupp.com
Address: L11, 141 St Georges Tce Perth

Employment opportunities:
Name: Valentina Vujacic
Position: Manager, Human Resources
Phone Number: 08 9200 0000
Email Address: JOBS-IS-Australia@thyssenkrupp.com
Address: L11, 140 St Georges Terrace Perth, WA 6000

Please review the scope of works document for details of the package.
662NSP2019 Product Baghouse 
  

Full scope has been awarded to:

Weir Minerals Netherlands B.V.

Contact details for subcontracting opportunities:
Contact person: Erik Klaassen
Phone Number: +31773895162
Email Address: Erik.klaassen@mail.weir

Contact details for employment opportunities:
Contact person: Mirjam Ruiten
Phone Number: +31 6 30528984
Email Address: Mirjam.ruiten@mail.weir

Please review the scope of works document for details of the package.
662NSP2025 Dry Rejects Conveying System 
  

Full scope has been awarded to:

Dalian Huarui Heavy Industry (Australia) Pty Ltd

Contact details for Sub-contracting opportunities:

Contact person: Qu Ge / Harald Grosshammer
Phone Number: +61 408903520
Email Address: quge@dhidcw.com;

Contact details for Employment opportunities:
Contact person: Zhou Chao
Phone Number: +61 0456800388
Email Address: zhouchao@dhidcw.com

Please review the scope of works document for details of the package.
662NSP2054 Gyratory Crushers 
  

Full scope has been awarded to:

Thyssenkrupp Industrial Solutions (Australia) Pty Ltd.

Award Information:-

Sub-contracting opportunities:
Name: Richard Edwards
Position: Head of Procurement
Phone Number: 0428 284 792
Email Address: Richard.edwards@thyssenkrupp.com
Address: L11, 140 St Georges Terrace Perth

Employment opportunities:
Name: Valentina Vujacic
Position: Manager, Human Resources
Phone Number: 08 9200 0000
Email Address: JOBS-IS-Australia@thyssenkrupp.com
Address: L11, 140 St Georges Terrace Perth, WA 6000

Please review the scope of works document for details of the package.
662NSP2017 Steel Thickeners 
  

Full scope has been awarded to:

Outotec Pty Ltd

Contact details for subcontracting opportunities:
Contact person: Willis Oktech
Phone: +61 409 108 279
Email: willis.oketch@mogroup.com

Contact details for employment opportunities:
Contact person: Willis Oktech
Phone: +61 409 108 279
Email: willis.oketch@mogroup.com

Please refer to the scope of works document for details of the package
662NSP4003 Concentrate Belt Filters 
  

Full scope has been awarded to:

Jord International Pty Ltd

Sub-contracting opportunities:
Name: Samir Kher
Position: Commercial Manager
Phone Number: +61 2 8425 1500
Email Address: skher@jord.com.au

Employment opportunities:
Name: Erin Collins
Position: Group Human Resources Manager
Phone Number: +61 2 8425 1584
Email Address: ecollins@jord.com.au
Address: Jord International Ltd Pty
40 Oxley Street, St Leonards, NSW 2065.

Please refer to the scope of works for details of the package
662NSC3005 Canning Basin Bore Hole Drilling 
  

Full scope has been awarded to:

Boart Longyear Australia Pty Ltd

Contractor: Boart Longyear Australia Pty Ltd:-

Contact details for subcontracting opportunities: Anton Clarkson

Phone: 61 0448 375 012
Email: aclarkson@boartlongyear.com

Contact details for employment opportunities: Anton Clarkson

Phone: 61 0448 375 012
Email: aclarkson@boartlongyear.com

Please refer to the scope of works for further details on this package.
662NSP2020 Positive Displacement Pumps 
  

Full scope has been awarded to:

Weir Minerals Netherlands B.V.

Contact details for subcontracting opportunities:
Contact person: Erik Klaassen
Phone Number: +31773895162
Email Address: Erik.klaassen@mail.weir

Contact details for employment opportunities:
Contact person: Mirjam Ruiten
Phone Number: +31 6 30528984
Email Address: Mirjam.ruiten@mail.weir

Please refer to scope of work for further details pertaining to this package.
662NSP0015 Slurry Process Sump Pumps 
  

Full scope has been awarded to:

WEIR Pty Ltd

Sub-contracting opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Employment opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Please refer to scope of works for further details pertaining to this package.
662NSC5001 Bulk and Detailed Earthworks Concrete Roads Processing Plant Infrastructure 
  

Full scope has been awarded to:

NRW Pty Ltd

Sub-contracting opportunities:
Name: Lisa Branford
Position: Principal Engineer
Phone Number: (08) 9232 4200
Email Address: tendering@nrw.com.au
Address: 181 Great Eastern Highway, Belmont WA 6104

Employment opportunities:
Name: Jen Burdach
Position: Recruitment Advisor
Phone Number: (08) 9232 4200
Email Address: recruitment@nrw.com.au
Address: 181 Great Eastern Highway, Belmont WA 6104

Please refer to the scope of works for further information pertaining to the package.
662NSP2015 Demagnetizing Coils 
  

Full scope has been awarded to:

Eriez Magnetics Pty Ltd

Sub-contracting opportunities:
Name: Dennis Ng
Position: Business Development Engineer
Phone Number: 03 8401 7400
Email Address: dng@eriez.com
Address: 21 Shirley Way, Epping, VIC 3076

Employment opportunities:
Name: Jason Poole
Position: Factory Manager
Phone Number: 03 8401 7400
Email Address: jpoole@eriez.com
Address: 21 Shirley Way, Epping, VIC 3076

please refer to teh scope of works document for details of teh package
662NSP2029 Hydro-Separation Tanks 
  

Full scope has been awarded to:

Mineral Technologies Pty Ltd (A Downer Group Company)

Contact details for subcontracting opportunities:
Contact person: Dave King
Phone: +61 449 137 553
Email: Dave.King@downergroup.com

Contact details for employment opportunities:
Contact person: Dave King
Phone: +61 449 137 553
Email: Dave.King@downergroup.com

Please refer to scope of works for further details on this package.
662NSC1003 WASTE WATER TREATMENT PLANT 
  

Full scope has been awarded to:

Waste Water Services Pty Ltd

Contact details for subcontracting opportunities:
Contact person: Jerry Horgan
Phone: 9241 9100
Email: jerry@wastewaterservices.com.au

Contact details for employment opportunities:
Contact person: Jerry Horgan
Phone: 9241 9100
Email: jerry@wastewaterservices.com.au

Please refer to scope of work for further details pertaining to this package.
662NSC1009 Water Treatment Plant 
  

Full scope has been awarded to:

Waste Water Services Pty Ltd

Contact details for subcontracting opportunities:
Contact person: Jerry Horgan
Phone: 9241 9100
Email: jerry@wastewaterservices.com.au

Contact details for employment opportunities:
Contact person: Jerry Horgan
Phone: 9241 9100
Email: jerry@wastewaterservices.com.au

Please refer to scope of work for further details pertaining to this package.
662NSP2016 Hydrocyclones 
  

Full scope has been awarded to:

Weir Minerals

Sub-contracting opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Employment opportunities:
Name: Peter Alexander
Position: General Manager - Projects
Phone Number: +61 427 046 176
Email Address: peter.alexander@mail.weir
Address: 1 Marden St, Artarmon NSW Australia, 2064

Please refer to scope of work for further details pertaining to this package.
662NSP2034 Agitators 
  

Full scope has been awarded to:

Mixtec Solutions Pty Ltd

Sub-contracting opportunities:
Name: Parag Dharkar
Position: Lead Engineer
Phone Number: +61 8 9249 2944
Email Address: Parag.dharkar@mixtec.com.au
Address: 46 Millrose Drive, Malaga, WA-6090

Employment opportunities:
Name: Parag Dharkar
Position: Lead Engineer
Phone Number: +61 8 9249 2944
Email Address: Parag.dharkar@mixtec.com.au
Address: 46 Millrose Drive, Malaga, WA-6090

Please refer to scope of work for further details pertaining to this package.
662NSP2045 Slurry Samplers 
  

Full scope has been awarded to:

CONSEP

Sub-contracting opportunities:
Name: Marcel Steger
Position: Operations Manager
Phone Number: 02 9756 5299
Email Address: msteger@consep.com.au
Address: 59 Newton Road ; Wetherill Park NSW 2164

Employment opportunities:
Name: Marcel Steger
Position: Operations Manager
Phone Number: 02 9756 5299
Email Address: msteger@consep.com.au
Address: 59 Newton Road ; Wetherill Park NSW 2164

Please refer to the scope of works document for details of the package
662NSP2035 Flocculant Plant 
  

Full scope has been awarded to:

Lime Systems - Bulk Storage Solutions Pty Ltd

Contact details for subcontracting opportunities:
Contact person: Andree Marwitz
Phone: : +61 417 950 367
Email: Andree@limesystems.com.au

Contact details for employment opportunities:
Contact person: Andree Marwitz
Phone: +61 417 950 367
Email: Andree@limesystems.com.au

Please refer to the scope of works document for details of the package
662NSP2050 Coagulant Plant 
  

Full scope has been awarded to:

Lime Systems - Bulk Storage Solutions Pty Ltd

Contact details for subcontracting opportunities:
Contact person: Andree Marwitz
Phone: +61 417 950 367
Email: Andree@limesystems.com.au

Contact details for employment opportunities:
Contact person: Andree Marwitz
Phone: +61 417 950 367
Email: Andree@limesystems.com.au

Please refer to the scope of works document for details of the package
662NSP2057 Static Trash Screens 
  

Full scope has been awarded to:

Multotec Pty Ltd

Sub-contracting opportunities:
Name: Luka Vasev
Position: Project Manager
Phone Number: 0417221599
Email Address: luka.vasev@multotec.com.au
Address: 24 Volcanic Loop Wangara 6065

Employment opportunities:
Name: Daniela Adams
Position: Process Engineer
Phone Number: 0439042327
Email Address: daniela.adams@multotec.com.au
Address: 24 Volcanic Loop Wangara 6065

Please refer to scope of work for further details pertaining to this package.
662NSP0040 Steel Tanks 
  

Full scope has been awarded to:

Outotec Pty Ltd

Contact details for subcontracting opportunities:
Contact: Duncan Wyatt
Phone: +61 08 9211 2539
Email: duncan.wyatt@mogroup.com

Contact details for employment opportunities:
Contact: Duncan Wyatt
Phone: +61 08 9211 2539
Email: duncan.wyatt@mogroup.com

Please refer to scope of work pertaining to this package.
662NSP0009 Module Fabrication 
  

Full scope has been awarded to:

Wison (Nantong) Heavy Industry Co Ltd

Contact name for subcontracting opportunities:
Contact: Zhai Xuefei
Phone: +86 18962962455
Email: zhaixuefei@wilson.com

Contact name for employment opportunities:-
Contact: Zhai Xuefei
Phone: +86 18962962455
Email: zhaixuefei@wilson.com

Please refer to scope of work for further details pertaining to this package.
662NSP2038 Conveyor Drives 
  

Full scope has been awarded to:

Flender Pty Ltd

Sub-contracting opportunities:
Name: Shardul Kulkarni
Position: Strategic Procurement
Phone Number: +61 (2) 9491-5049
Email Address: shardul.kulkarni@flender.com
Address: 160 Herring Rd, Macquarie Park NSW 2113

Employment opportunities:
Name: Julia Benedikt
Position: HR Manager
Email Address: julia.benedikt@flender.com
Address: 160 Herring Rd, Macquarie Park NSW 2113

Please refer to scope of work for further information pertaining to this package.
662NSP0003 Cranes and Hoists 
  

Full scope has been awarded to:

Eilbeck Cranes Pty Ltd

Sub-contracting opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Employment opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Please refer to SOW for further details pertaining to this package.
662NSP2046 Low Profile Feeders 
  

Full scope has been awarded to:

Transmin Pty Ltd

Sub-contracting opportunities:
Name: David Cleghorn
Position: Head of Project Management
Phone Number: +61 8 9270 8540
Email Address: david.cleghorn@transmin.com.au


Employment opportunities:
Name: Lyndel Quinn-Schofield
Position: Head of Corporate Service
Phone Number: +61 8 9270 8555
Email Address: lyndel.Quinn-Schofield@transmin.com.au
Address: 33/35 Denninup Way, Malaga Western Australia 6090

Please refer to SOW for further details pertaining to this package.
662NSP2047 Rock Breakers 
  

Full scope has been awarded to:

Transmin Pty Ltd

Sub-contracting opportunities:
Name: Shiv Aradhya
Position: Project Manager
Phone Number: +61 8 9270 8514
Email Address: Shiv.Aradhya@transmin.com.au

Employment opportunities:
Name: Lyndel Quinn-Schofield
Position: Head of Corporate Service
Phone Number: +61 8 9270 8555
Email Address: lyndel.Quinn-Schofield@transmin.com.au

Please refer to SOW for further details pertaining to this package.
662NSP2042 Take-Up Equipment 
  

Full scope has been awarded to:

Eilbeck Cranes Pty Ltd

Sub-contracting opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Employment opportunities:

Name: John Rasmussen
Position: Operations Manager, WA
Phone Number: +61 8 9279 4800
Email Address: j.rasmussen@eilbeckcranes.com
Address: 28 Jackson Street, Bassendean WA 6054

Please refer to SOW for further details pertaining to this package.
662NSP2030 Conveyor Belt Covers 
  

Full scope has been awarded to:

Kinder Australia Pty Ltd

Information in relation to Award:-

Sub-contracting opportunities:
Name: Cameron Portelli
Position: Senior Mechanical Engineer
Phone Number: + 61 3 8587 9101
Email Address: cameronp@kinder.com.au
Address: 26 Canterbury Road, Braeside VIC 3195

Employment opportunities:
Name: Cameron Portelli
Position: Senior Mechanical Engineer
Phone Number: + 61 3 8587 9101
Email Address: cameronp@kinder.com.au
Address: 26 Canterbury Road, Braeside VIC 3195

Please refer to the Scope of works document for details of the package.
662NSP2027 Conveyor Belt Cleaners 
  

Full scope has been awarded to:

TS Global Pty Ltd

Sub-contracting opportunities:
Name: Jamie Whybrow
Position: Contract Manager
Phone Number: 0431 604 022
Email Address: jwhybrow@tsglobal.net.au
Address: 8 Laurio Place, Mayfield West, NSW, 2304

Employment opportunities:
Name: Jamie Whybrow
Position: Contract Manager
Phone Number: 0431 604 022
Email Address: jwhybrow@tsglobal.net.au
Address: 8 Laurio Place, Mayfield West, NSW, 2304

Please refer to SOW for further details pertaining to this package.
662NSP2026 Dry Samplers 
  

Full scope has been awarded to:

Consep Pty Ltd

Contact details for Sub-contracting opportunities:

Contact person: Marcel Steger
Phone Number: 02 9756 5299
Email Address: msteger@consep.com.au

Contact details for Employment opportunities:

Contact Person: Marcel Steger
Phone Number: 02 9756 5299
Email Address: msteger@consep.com.au

Please refer to the scope of works document for details of the package
662NSP2059 Grinding Media 
  

Full scope has been awarded to:

Magotteaux Australia (Pty) Ltd

Contact details for Sub-contracting opportunities:
Contact: Mary-Ann Li Kwong Ken
Phone : + 61 (8) 6316 2400
Email: mary-ann.li@magotteaux.com

Contact details for employment opportunities:
Contact: Christopher Greet
Phone: + 61 08 8345 5666
Email: christopher.greet@magotteaux.com

Please refer to SOW for further details pertaining to this package.
662NSP0029 Field MCC and Field DB 
  

Full scope has been awarded to:

Plummers Industries Pty Ltd

Contact details for Sub-contracting opportunities:
Contact: Wayne Plummer
Phone Number: +61 08 9277 7255
Email Address: admin@plummers.com.au

Contact details for Employment opportunities:
Contact: David Harris
Phone Number: +61 08 9277 7255
Email Address: admin@plummers.com.au

Please refer to the scope of works document for details of the package.
662NSP3002 Steel Pipe - Return Water 
  

Full scope has been awarded to:

Enviro Pipes Pty Ltd

Contractor: Enviro Pipes Pty Ltd
Contact details for subcontracting opportunities:
Contact: Luis Da Silva Jorge
Phone: +61 (8) 9352 8444
Email: sales@enviropipes.com.au

Contact details for employment opportunities:
Contact: Joe Horvat
Phone: +61 (8) 9352 8444
Email: resumes@enviropipes.com.au

Please refer to SOW for further details pertaining to this package.
662NSP3003 Steel Pipe - Concentrate Line 
  

Full scope has been awarded to:

Mitsui & Co (Australia) Pty Ltd

Contact details for subcontracting opportunities:
Contact: Ryuhei Watanabe
Phone: +61 429 124 475
Email: ryu.watanabe@mitsui.com

Contact details for employment opportunities:
Contact: Ryuhei Watanabe
Phone: +61 429 124 475
Email: ryu.watanabe@mitsui.com

Please refer to SOW for further details pertaining to this package.
662NSP2060 Slurry Analysers 
  

Full scope has been awarded to:

Outotec Australia

Sub-contracting opportunities:

Name: Gary Reinwald
Position: Project Manager, CAPEX
Phone Number: +61 3 9904 1600
Email Address: gary.reinwald@outotec.com
Address: 12 Kitchen Road Dandenong South VIC 3175 Australia

Employment opportunities:

Name: Jessica Luc
Position: Director of Human Resources - South East Asia Pacific
Phone Number: (02) 9984 2500
Email Address: Jessica.luc@outotec.com
Address: 20 Rodborough Road Frenchs Forest NSW
2068 Australia

Pleae refer to SOW for further details pertaining to this SOW.
662NSC1008 Bulk Earthworks - Access Roads and Infrastructure03 Apr 201924 Apr 201924 Apr 2019
  
Please refer to scope of works document for details on the scope of works
662NSP1001 Mine Fleet05 Apr 201926 Apr 201926 Apr 2019
  
Please refer to the scope of works for details of the package package
662NSC1006 Airport11 Apr 201902 May 201902 May 2019
  
Please review the scope of works document for details of the package.
662NSC1005 Operations Camp18 Apr 201909 May 201909 May 2019
  
please refer to the scope of works document for details of the package
662NSP2006 Regrind Mills26 Apr 201917 May 201917 May 2019
  
Please review the scope of works document for details of the package.
662NSP2032 Water Pumps07 May 201928 May 201928 May 2019
  
Please refer to the scope of works for details of the package
662NSP2018 Concrete Thickeners07 May 201928 May 201929 May 2019
  
Please refer to the scope of works document for details on the package
662NSC0009 Survey and Set Out09 May 201931 May 201931 May 2019
  
Please refer to scope of works for further details of the package.
662NSP2004 Dry Magnetic Separators14 May 201905 Jun 201905 Jun 2019
  
Please refer to scope of works for further details.
662NSP2014 Dust Collection Systems14 May 201905 Jun 201905 Jun 2019
  
Please refer to scope of works for further details on package.
662NSC2002 PROCESS PLANT CONSTRUCTION21 May 201911 Jun 201911 Jun 2019
  
Please refer to the scope of works for details of the package
662NSP2049 Tertiary Grinding Wet Screening24 May 201917 Jun 201917 Jun 2019
  
Please refer to scope of works for further details pertaining to the work.
662NSP2005 Wet Magnetic Separators28 May 201919 Jun 201919 Jun 2019
  
Please refer to scope of works for further details pertaining to this package.
662NSP4001 Dewatering Drums28 May 201919 Jun 201919 Jun 2019
  
Please refer to the scope of work for further details pertaining to the package.
662NSP2012 Vibrating Screens10 Jun 201901 Jul 201901 Jul 2019
  
Please refer to scope of works for further details pertaining to this package.
662NSP2009 Apron Feeders24 Jun 201915 Jul 201915 Jul 2019
  
Please refer to the scope of works for details of the package
662NSC2001 Bulk Earthworks Tailings Storage Facility27 Jun 201919 Jul 201919 Jul 2019
  
Please refer to the scope of works document for details of the package
662NSC3001 Pipelines Basic and Detailed Design04 Jul 201925 Jul 201925 Jul 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP0027 MV/HV Variable Speed Drives04 Jul 201925 Jul 201925 Jul 2019
  
Please refer to scope of works for further information pertaining to this work.
662NSC1004 Construction Water Supply18 Jul 201908 Aug 201908 Aug 2019
  
Please refer to scope of work for further details pertaining to this work.
662NSP2013 Belt Feeders22 Jul 201912 Aug 201912 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSC5003 Explosives Supply and Services25 Jul 201915 Aug 201915 Aug 2019
  
Please refer to scope of work for further information pertaining to this package.
662NSC5010 Waste Management26 Jul 201916 Aug 201916 Aug 2019
  
Please refer to scope of work for further details on this package.
662NSP0018 Dart Valves29 Jul 201919 Aug 201919 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP4007 Polishing Filters01 Aug 201922 Aug 201922 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP0010 LV Variable Speed Drives - Field Mounted05 Aug 201926 Aug 201926 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSC4001 Bulk Earthworks - PORT07 Aug 201928 Aug 201928 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSC5029 Water Supply - Local Borefield Development07 Aug 201928 Aug 201928 Aug 2019
  
Please refer to the scope of work for further details pertaining to this package.
662NSP0001 Water Tanks07 Aug 201928 Aug 201928 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP0002 Fire Water Pumps08 Aug 201929 Aug 201929 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP2022 Compressed Air System08 Aug 201929 Aug 201929 Aug 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSC5011 Car Hire13 Aug 201903 Sep 201903 Sep 2019
  
Please refer to scope of works for further details pertaining to this package
662NSP2052 Dam Pumps13 Aug 201903 Sep 201903 Sep 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP0008 LV VSD Switchroom Mounted16 Aug 201906 Sep 201906 Sep 2019
  
Please refer to scope of works for further information pertaining to this package.
662NSP0022 LV Motors16 Aug 201906 Sep 201906 Sep 2019
  
Please review the scope of works documents for details of the package.
662NSP2010 Isolation Gates19 Aug 201909 Sep 201909 Sep 2019
  
Please refer to scope of work for more information pertaining to this package.
662NSP2011 Vibrating Feeders19 Aug 201909 Sep 201909 Sep 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP0019 11kV Motor Control Centres21 Aug 201911 Sep 201911 Sep 2019
  
Please refer to scope of works for further details pertaining to this 11KV MCC's package.
662NSP2056 Product Baghouse Conveyors27 Aug 201917 Sep 201917 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSC4003 Detailed Earthworks and Concrete28 Aug 201918 Sep 201918 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP0020 HV Motors28 Aug 201918 Sep 201918 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP2043 Conveyor Skirts28 Aug 201918 Sep 201918 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP2040 Conveyor Idlers23 Aug 201920 Sep 201920 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSC4008 Production Shed02 Sep 201923 Sep 201923 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP4005 Sample Stations02 Sep 201923 Sep 201923 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP2033 Mechanical Valves03 Sep 201924 Sep 201924 Sep 2019
  
Please see SOW for further details pertaining to this package.
662NSP2039 Conveyor Pulleys04 Sep 201925 Sep 201925 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP2041 Conveyor Belts04 Sep 201925 Sep 201925 Sep 2019
  
Please refer to SOW for further details pertaining to this package.
662NSC4009 Laboratory re Port05 Sep 201926 Sep 201926 Sep 2019
  
Please refer to SOW pertaining to this package.
662NSP0032 Instrumentation13 Sep 201904 Oct 201904 Oct 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP0041 Control Valves13 Sep 201904 Oct 201904 Oct 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP0042 Level Radar and Ultrasonic13 Sep 201904 Oct 201904 Oct 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP0043 Nucleonic Density and Level13 Sep 201904 Oct 201904 Oct 2019
  
Please refer to SOW for further details.
662NSP2023 Analysers13 Sep 201904 Oct 201904 Oct 2019
  
Please refer to SOW for further details pertaining to this package.
662NSC2003 Concrete Supply17 Sep 201908 Oct 201908 Oct 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP2044 Weightometers23 Sep 201914 Oct 201914 Oct 2019
  
Please refer to the scope of works document for details of the package
662NSP2024 Metal Detectors24 Sep 201915 Oct 201915 Oct 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP0005 Switchrooms UPS and 400V MCC07 Oct 201928 Oct 201928 Oct 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP0006 33kV Switchrooms and 33kV Switchgear07 Oct 201928 Oct 201928 Oct 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSP0007 Transformers07 Oct 201928 Oct 201928 Oct 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSC0010 Freight and Logistics08 Oct 201929 Oct 201929 Oct 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSC5028 Installation HV Infrastructure 33KV Retic and Underground Services17 Oct 201907 Nov 201907 Nov 2019
  
Please refer to scope of work for further details pertaining to this package.
662NSC5020 Installation HV Infrastructure - Earthing Grid And Overhead Distribution18 Oct 201908 Nov 201908 Nov 2019
  
Please review the scope of works document for details of the package
662NSC5004 Iron Bridge NPI24 Oct 201914 Nov 201914 Nov 2019
  
Please refer to SOW for further details pertaining to this work.
662NSC3004 West Canning Basin Earthworks08 Nov 201928 Nov 201928 Nov 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP2048 Pipe Process Plant06 Nov 201928 Nov 201928 Nov 2019
  
Please refer to Scope of Work for further details pertaining to this package.
662NSC2006 Laboratory re Plant01 Nov 201929 Nov 201929 Nov 2019
  
Please refer to SOW for further details pertaining to this package.
662NSC4002 Structural Mechanical Piping Electrical and Instrumentation re PORT08 Nov 201929 Nov 201929 Nov 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP0011 Cable18 Nov 201909 Dec 201909 Dec 2019
  
Please refer to SOW for further details pertaining to this package.
662NSP0016 Cable Tray18 Nov 201909 Dec 201909 Dec 2019
  
Please refer to SOW for further details pertaining to this work.
662NSC0006 Pre-Cast Concrete26 Nov 201917 Dec 201917 Dec 2019
  
Please refer to the Scope of Works document for details of the package.
662NSP0033 Lights and Poles27 Nov 201920 Dec 201920 Dec 2019
  
Please refer to the scope of works document for details of the package.
662NSC0016 Iron Bridge Project RC Drilling17 Dec 201910 Jan 202010 Jan 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC3006 Geophysical Logging Services17 Dec 201910 Jan 202010 Jan 2020
  
Please refer to SOW for further details pertaining to SOW.
662NSC4012 Site Offices PORT10 Jan 202031 Jan 202031 Jan 2020
  
Please refer to SOW for further details pertaining to this package.
662NSP0012 Control System Hardware10 Jan 202031 Jan 202031 Jan 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC0004 PCS Hardware Software and Integration22 Jan 202012 Feb 202012 Feb 2020
  
Please see SOW for further details pertaining to this package.
662NSP0031 Central Control Room (CCR) EIC Equipment22 Jan 202012 Feb 202012 Feb 2020
  
Please refer to SOW for further information pertaining to this package.
662NSP3001 Steel Pipe - Canning Basin30 Jan 202020 Feb 202020 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
662NSP0035 Fire Detection System Integration30 Jan 202021 Feb 202021 Feb 2020
  
Please refer to SOW for further details on this package.
662NSP0036 CCTV System30 Jan 202021 Feb 202021 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC0017 Inspection and Expediting Services04 Feb 202025 Feb 202025 Feb 2020
  
Please refer to SOW for further details.
662NSC2011 Dry Plant Shop Detailing05 Feb 202026 Feb 202026 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC2012 Wet Plant Shop Detailing05 Feb 202026 Feb 202026 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC4013 Port Shop Detailing05 Feb 202026 Feb 202026 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC0026 Mining Operations Explosives Supply and Services06 Feb 202027 Feb 202027 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC0018 Diamond Drilling Services12 Feb 202004 Mar 202004 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC0027 Drilling Consumables17 Feb 202009 Mar 202009 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
NSC0028 OTR Tyres and Rims04 Mar 202026 Mar 202026 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC4015 Accommodation Port12 Mar 202003 Apr 202003 Apr 2020
  
Please refer to the scope of works document for details of the package
662NSC3002 Canning Basin Raw Water Pipeline23 Mar 202014 Apr 202014 Apr 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC3003 Concentrate and Return Water Pipelines23 Mar 202014 Apr 202014 Apr 2020
  
Please refer to SOW for further details pertaining to this package.
662NSP3001 Flexible Pressure Pipe - Canning Basin23 Mar 202014 Apr 202014 Apr 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC0024 Wedgefield Laydown01 Apr 202022 Apr 202022 Apr 2020
  
Please refer to SOW for further details pertaining to this package.
662NSP2058 Mobile Cranes15 Apr 202006 May 202006 May 2020
  
Please see the SOW for further details pertaining to this package.
662NSC3007 Pipelines Geotechnical Services23 Apr 202015 May 202015 May 2020
  
Please refer to SOW for further details pertaining to this package.
662NSP2062 ROM Wall Panels and Straps09 Jun 202001 Jul 202001 Jul 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC1010 Communications infrastructure Towers and RBS25 Jun 202017 Jul 202017 Jul 2020
  
Please refer to SOW for further details pertaining to this work.
662NSC0028 Design and Construct - OPF Emergency Power Station25 Aug 202009 Sep 202009 Sep 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC3016 Canning Basin Diesel Power Station17 Sep 202009 Oct 202009 Oct 2020
  
Please refer to SOW for further details pertaining to this package.
NSC0035 Exciters Refurbishment and Testing21 Sep 202013 Oct 202013 Oct 2020
  
See Scope for full details
662NSP3008 Pig Launchers and Receivers22 Sep 202014 Oct 202014 Oct 2020
  
Please refer to SOW for further details pertaining to the package.
662NSP3009 Monolithic Insulation Joints22 Sep 202014 Oct 202014 Oct 2020
  
Please refer to SOW for further details pertaining to this package.
662NSC5031 NPI - Pipeline Construction Accommodation12 Oct 202002 Nov 202002 Nov 2020
  
Please refer to SOW for further details pertaining to this package.
NSC0034 Lubricants15 Oct 202006 Nov 202006 Nov 2020
  
Please refer to SOW for further details pertaining to this Project.
662NSC5025 Stage 1 Plant Removal23 Oct 202013 Nov 202013 Nov 2020
  
Please refer to SOW for further details pertaining to this work.