Project Details


Project owner: IB Operations Pty Ltd, as agent for Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd


Project Details:

The Iron Bridge Magnetite Project (Project) is for the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure at the Iron Bridge Magnetite Project site to support production of 22 wet million tonnes per annum (wmtpa) of high grade, magnetite concentrate product. The Iron Bridge site comprises the North Star, Eastern Limb, Glacier Valley and West Star magnetite iron ore deposits, located 145km south of Port Hedland.  

Delivery of first ore is expected in the first half of calendar year 2022, with ramp up to full production within 12 months.

IB Operations is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the ICN Gateway. 


Scope Overview:

The Project scope will require the establishment of new facilities, including:

·         mine

·         ore processing facility

·         slurry and return water pipeline

·         raw water pipeline

·         port infrastructure

·         non-process infrastructure, such as airstrip, village extension, telecommunications networks, electricity, water, sewage, and wastewater facilities. 


The Iron Bridge Project will be operated by IB Operations Pty Ltd, as agent for the Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd.  IB Operations Pty Ltd is an Australian private company, which is owned by FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd, each a participant in the unincorporated Iron Bridge Joint Venture.


Local and Indigenous participation:


In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for the Iron Bridge Magnetite Project tendering opportunities.

SHOW LESS

Associated Opportunities


SHOW MORE

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Pipe Process Plant6 Nov 1928 Nov 1928 Nov 19
Please refer to Scope of Work for further details pertaining to this package.
West Canning Basin Earthworks8 Nov 1928 Nov 1928 Nov 19
Please refer to SOW for further details pertaining to this package.
Laboratory re Plant1 Nov 1929 Nov 1929 Nov 19
Please refer to SOW for further details pertaining to this package.
Structural Mechanical Piping Electrical and Instrumentation re PORT8 Nov 1929 Nov 1929 Nov 19
Please refer to SOW for further details pertaining to this package.
Cable18 Nov 199 Dec 199 Dec 19
Please refer to SOW for further details pertaining to this package.
Cable Tray18 Nov 199 Dec 199 Dec 19
Please refer to SOW for further details pertaining to this work.
Bulk Earthworks - Access Roads and Infrastructure3 Apr 1924 Apr 1924 Apr 19
Please refer to scope of works document for details on the scope of works
GEOTECHNICAL SERVICES5 Apr 1926 Apr 1926 Apr 19
please refer to the scope of works document for details of the package
Mine Fleet5 Apr 1926 Apr 1926 Apr 19
Please refer to the scope of works for details of the package package
Airport11 Apr 192 May 192 May 19
Please review the scope of works document for details of the package.
High Pressure Grinding Rollers11 Apr 192 May 192 May 19
Please review the scope of works for details of the package.
Operations Camp18 Apr 199 May 199 May 19
please refer to the scope of works document for details of the package
Regrind Mills26 Apr 1917 May 1917 May 19
Please review the scope of works document for details of the package.
Air Classifier1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Bridge Reclaimer1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Coarse Ore Stockpile Radial Stacker1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Cone Crushers1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Dry Rejects Conveying System1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Gyratory Crushers1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Product Baghouse1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Concentrate Belt Filters7 May 1928 May 1928 May 19
Please refer to the scope of works for details of the package
Steel Thickeners7 May 1928 May 1928 May 19
Please refer to the scope of works document for details of the package
Water Pumps7 May 1928 May 1928 May 19
Please refer to the scope of works for details of the package
Concrete Thickeners7 May 1928 May 1929 May 19
Please refer to the scope of works document for details on the package
Survey and Set Out9 May 1931 May 1931 May 19
Please refer to scope of works for further details of the package.
Dry Magnetic Separators14 May 195 Jun 195 Jun 19
Please refer to scope of works for further details.
Dust Collection Systems14 May 195 Jun 195 Jun 19
Please refer to scope of works for further details on package.
PROCESS PLANT CONSTRUCTION21 May 1911 Jun 1911 Jun 19
Please refer to the scope of works for details of the package
Canning Basin Bore Hole Drilling21 May 1914 Jun 1914 Jun 19
Please refer to the scope of works for further details on this package.
Tertiary Grinding Wet Screening24 May 1917 Jun 1917 Jun 19
Please refer to scope of works for further details pertaining to the work.
Dewatering Drums28 May 1919 Jun 1919 Jun 19
Please refer to the scope of work for further details pertaining to the package.
Positive Displacement Pumps29 May 1919 Jun 1919 Jun 19
Please refer to scope of work for further details pertaining to this package.
Wet Magnetic Separators28 May 1919 Jun 1919 Jun 19
Please refer to scope of works for further details pertaining to this package.
Slurry Process Sump Pumps7 Jun 1928 Jun 1928 Jun 19
Please refer to scope of works for further details pertaining to this package.
Vibrating Screens10 Jun 191 Jul 191 Jul 19
Please refer to scope of works for further details pertaining to this package.
Apron Feeders24 Jun 1915 Jul 1915 Jul 19
Please refer to the scope of works for details of the package
Bulk Earthworks Detailed Earthworks and Concrete for the Roads Processing Plant and Infrastructure27 Jun 1919 Jul 1919 Jul 19
Please refer to the scope of works for further information pertaining to the package.
Bulk Earthworks Tailings Storage Facility27 Jun 1919 Jul 1919 Jul 19
Please refer to the scope of works document for details of the package
Demagnetizing Coils28 Jun 1919 Jul 1919 Jul 19
please refer to teh scope of works document for details of teh package
MV/HV Variable Speed Drives4 Jul 1925 Jul 1925 Jul 19
Please refer to scope of works for further information pertaining to this work.
Pipelines Basic and Detailed Design4 Jul 1925 Jul 1925 Jul 19
Please refer to scope of work for further details pertaining to this package.
Hydro-Separation Tanks5 Jul 1926 Jul 1926 Jul 19
Please refer to scope of works for further details on this package.
Construction Water Supply18 Jul 198 Aug 198 Aug 19
Please refer to scope of work for further details pertaining to this work.
WASTE WATER TREATMENT PLANT17 Jul 198 Aug 198 Aug 19
Please refer to scope of work for further details pertaining to this package.
Water Treatment Plant17 Jul 198 Aug 198 Aug 19
Please refer to scope of work for further details pertaining to this package.
Belt Feeders22 Jul 1912 Aug 1912 Aug 19
Please refer to scope of work for further details pertaining to this package.
Hydrocyclones22 Jul 1912 Aug 1912 Aug 19
Please refer to scope of work for further details pertaining to this package.
Explosives Supply and Services25 Jul 1915 Aug 1915 Aug 19
Please refer to scope of work for further information pertaining to this package.
Waste Management26 Jul 1916 Aug 1916 Aug 19
Please refer to scope of work for further details on this package.
Dart Valves29 Jul 1919 Aug 1919 Aug 19
Please refer to scope of work for further details pertaining to this package.
Agitators31 Jul 1921 Aug 1921 Aug 19
Please refer to scope of work for further details pertaining to this package.
Polishing Filters1 Aug 1922 Aug 1922 Aug 19
Please refer to scope of work for further details pertaining to this package.
Slurry Samplers2 Aug 1923 Aug 1923 Aug 19
Please refer to the scope of works document for details of the package
LV Variable Speed Drives - Field Mounted5 Aug 1926 Aug 1926 Aug 19
Please refer to scope of work for further details pertaining to this package.
Coagulant Plant5 Aug 1927 Aug 1927 Aug 19
Please refer to the scope of works document for details of the package
Flocculant Plant5 Aug 1927 Aug 1927 Aug 19
Please refer to the scope of works document for details of the package
Bulk Earthworks - PORT7 Aug 1928 Aug 1928 Aug 19
Please refer to scope of work for further details pertaining to this package.
Static Trash Screens7 Aug 1928 Aug 1928 Aug 19
Please refer to scope of work for further details pertaining to this package.
Water Supply - Local Borefield Development7 Aug 1928 Aug 1928 Aug 19
Please refer to the scope of work for further details pertaining to this package.
Water Tanks7 Aug 1928 Aug 1928 Aug 19
Please refer to scope of work for further details pertaining to this package.
Compressed Air System8 Aug 1929 Aug 1929 Aug 19
Please refer to scope of work for further details pertaining to this package.
Fire Water Pumps8 Aug 1929 Aug 1929 Aug 19
Please refer to scope of work for further details pertaining to this package.
Steel Tanks9 Aug 1930 Aug 1930 Aug 19
Please refer to scope of work pertaining to this package.
Car Hire13 Aug 193 Sep 193 Sep 19
Please refer to scope of works for further details pertaining to this package
Dam Pumps13 Aug 193 Sep 193 Sep 19
Please refer to scope of work for further details pertaining to this package.
LV Motors16 Aug 196 Sep 196 Sep 19
Please review the scope of works documents for details of the package.
LV VSD Switchroom Mounted16 Aug 196 Sep 196 Sep 19
Please refer to scope of works for further information pertaining to this package.
Isolation Gates19 Aug 199 Sep 199 Sep 19
Please refer to scope of work for more information pertaining to this package.
Vibrating Feeders19 Aug 199 Sep 199 Sep 19
Please refer to scope of work for further details pertaining to this package.
Module Fabrication20 Aug 1910 Sep 1910 Sep 19
Please refer to scope of work for further details pertaining to this package.
11kV Motor Control Centres21 Aug 1911 Sep 1911 Sep 19
Please refer to scope of works for further details pertaining to this 11KV MCC's package.
Conveyor Drives21 Aug 1911 Sep 1911 Sep 19
Please refer to scope of work for further information pertaining to this package.
Cranes and Hoists27 Aug 1917 Sep 1917 Sep 19
Please refer to SOW for further details pertaining to this package.
Low Profile Feeders27 Aug 1917 Sep 1917 Sep 19
Please refer to SOW for further details pertaining to this package.
Product Baghouse Conveyors27 Aug 1917 Sep 1917 Sep 19
Please refer to SOW for further details pertaining to this package.
Rock Breakers27 Aug 1917 Sep 1917 Sep 19
Please refer to SOW for further details pertaining to this package.
Conveyor Skirts28 Aug 1918 Sep 1918 Sep 19
Please refer to SOW for further details pertaining to this package.
Detailed Earthworks and Concrete28 Aug 1918 Sep 1918 Sep 19
Please refer to SOW for further details pertaining to this package.
HV Motors28 Aug 1918 Sep 1918 Sep 19
Please refer to SOW for further details pertaining to this package.
Take-Up Equipment28 Aug 1918 Sep 1918 Sep 19
Please refer to SOW for further details pertaining to this package.
Conveyor Belt Covers23 Aug 1920 Sep 1920 Sep 19
Please refer to the Scope of works document for details of the package.
Conveyor Idlers23 Aug 1920 Sep 1920 Sep 19
Please refer to SOW for further details pertaining to this package.
Conveyor Belt Cleaners2 Sep 1923 Sep 1923 Sep 19
Please refer to SOW for further details pertaining to this package.
Production Shed2 Sep 1923 Sep 1923 Sep 19
Please refer to SOW for further details pertaining to this package.
Sample Stations2 Sep 1923 Sep 1923 Sep 19
Please refer to SOW for further details pertaining to this package.
Conveyor Shuttles3 Sep 1924 Sep 1924 Sep 19
Please refer to the scope of works document for details of the package
Mechanical Valves3 Sep 1924 Sep 1924 Sep 19
Please see SOW for further details pertaining to this package.
Conveyor Belts4 Sep 1925 Sep 1925 Sep 19
Please refer to SOW for further details pertaining to this package.
Conveyor Pulleys4 Sep 1925 Sep 1925 Sep 19
Please refer to SOW for further details pertaining to this package.
Laboratory re Port5 Sep 1926 Sep 1926 Sep 19
Please refer to SOW pertaining to this package.
Analysers13 Sep 194 Oct 194 Oct 19
Please refer to SOW for further details pertaining to this package.
Control Valves13 Sep 194 Oct 194 Oct 19
Please refer to SOW for further details pertaining to this package.
Dry Samplers13 Sep 194 Oct 194 Oct 19
Please refer to the scope of works document for details of the package
Instrumentation13 Sep 194 Oct 194 Oct 19
Please refer to SOW for further details pertaining to this package.
Level Radar and Ultrasonic13 Sep 194 Oct 194 Oct 19
Please refer to SOW for further details pertaining to this package.
Nucleonic Density and Level13 Sep 194 Oct 194 Oct 19
Please refer to SOW for further details.
Concrete Supply17 Sep 198 Oct 198 Oct 19
Please refer to SOW for further details pertaining to this package.
Weightometers23 Sep 1914 Oct 1914 Oct 19
Please refer to the scope of works document for details of the package
Grinding Media24 Sep 1915 Oct 1915 Oct 19
Please refer to SOW for further details pertaining to this package.
Metal Detectors24 Sep 1915 Oct 1915 Oct 19
Please refer to SOW for further details pertaining to this package.
33kV Switchrooms and 33kV Switchgear7 Oct 1928 Oct 1928 Oct 19
Please refer to scope of work for further details pertaining to this package.
Switchrooms UPS and 400V MCC7 Oct 1928 Oct 1928 Oct 19
Please refer to scope of work for further details pertaining to this package.
Transformers7 Oct 1928 Oct 1928 Oct 19
Please refer to scope of work for further details pertaining to this package.
Freight and Logistics8 Oct 1929 Oct 1929 Oct 19
Please refer to scope of work for further details pertaining to this package.
Installation HV Infrastructure 33KV Retic and Underground Services17 Oct 197 Nov 197 Nov 19
Please refer to scope of work for further details pertaining to this package.
Installation HV Infrastructure - Earthing Grid And Overhead Distribution18 Oct 198 Nov 198 Nov 19
Please review the scope of works document for details of the package
Iron Bridge NPI24 Oct 1914 Nov 1914 Nov 19
Please refer to SOW for further details pertaining to this work.