  Project Status: Front-end engineering design activities
  Project Owner Woodside Energy Ltd

Project Details


Woodside is proposing to develop the Scarborough gas resource through new offshore facilities connected through an approximately 430 km pipeline to a proposed brownfield expansion of the existing Pluto LNG onshore facility (Pluto Train 2).


The proposed offshore Scarborough activities will initially develop the gas field with up to seven subsea, high-rate gas wells, tied back to a semi-submersible floating production unit (FPU) moored in 900 metres of water close to the Scarborough field.


 Scarborough is an integral part of Woodside’s vision for a regional gas hub, the Burrup Hub, which will secure economic growth and local employment opportunities for Western Australia for decades to come.


 In Q1 2019 Woodside Energy Ltd. (Woodside) awarded four contracts for the front-end engineering and design activities for Scarborough.


 McDermott Australia Pty. Ltd. is undertaking engineering studies for the FPU. This includes the option to progress to an engineering, procurement, and construction contract for the execute phase activities.


 Subsea Integration Alliance, a consortium of OneSubsea Australia Pty. Ltd. and Subsea 7 Australia Contracting Pty. Ltd., is undertaking engineering studies for subsea umbilical risers and flowlines. This includes the option to progress to a next stage engineering, procurement, construction, and installation contract.


Saipem Australia Pty. Ltd. is providing export trunkline engineering support services with the option to execute line pipe coating and installation activities.


 Intecsea Pty. Ltd. is providing export trunk line FEED engineering services, with an option to progress execute engineering services.


 In Q3 2019 Woodside Energy Ltd. (Woodside)  awarded a further contract to Boskalis Australia Pty Ltd, who is providing engineering services with the option to execute seabed intervention and shore crossing activities.


The option to progress to execute phase activities under the contracts is subject to, among other conditions, a positive final investment decision being taken on the project by the Scarborough Joint Venture.


Woodside is targeting a final investment decision for Scarborough in 2020.

SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS   MCDERMOTT    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Scarborough Project - Firewater Pump Skid Package22 Mar 201917 Apr 201917 Apr 2019
  
There are two FW pump packages foreseen on the FPU:-

Package scope:
. Submerged electric motor driven FW pump.
. Diesel engine generator (including auxiliaries: diesel storage, lube oil system starting system etc) to provide power to the submerged electric motor.
.Instrumentation condition/performance monitoring.
.Acoustic enclosure and ventilation system for diesel generator.
. Documentation.
. Test & Inspection.
. Engineering & Design
. Spares and special tools
. Offshore application and remote (low- or unmanned) operation of the FPU and equipment.

Seller to provide the pump, submerged electric motor, power cabling, diesel engine generator, auxiliaries as one package (inspection & testing, assembly, documentation, design & engineering etc. also to be executed by the seller).
Estimated pump power: approximately 650 kW (1.500 m3/h, 12 bar)
Independent power supply: medium or high voltage power supply from diesel engine driven generator.
Submerged installation of motor and pump in a dedicated caisson (far below the topside).
Scarborough Project - Pedestal Crane Package22 Mar 201917 Apr 201917 Apr 2019
  
Package scope:
. 2x Pedestal Offshore Cranes (Full Electric or Electric/Hydraulic)
. Type = Lattice Boom Crane
. Hoists = Main + Whip
. Optional = Fly Jib
. Installation Type = Floating Production Unit - FPU (semi-submersible)
. Crane Installation Height = 56m from SL
. Crane Capacity:
o On-board lift = 100 SWL @ 8000 / 20t SWL @ 60m lifts.
o Off-board lifts = 80 SWL @ 8000 / 20t SWL @ 60m lifts.
. Total Significant Wave height:
o During summer period (Oct. to Mar) = Max: 5.83m / Mean 2.23m / Std. Dev 0.63
o During winter period (Apr. to Sep) = Max: 6.58m / Mean 2.57m / Std. Dev 0.72
. Fall Configurations:1,2,3,4
. Note:
o Platform will be operating in low manning or unmanned.
o Cranes will be able to handshake each other for maintenance.

Seller to provide the pump, submerged electric motor, power cabling, diesel engine generator, auxiliaries as one package (inspection & testing, assembly, documentation, design & engineering etc. also to be executed by the seller).
Estimated pump power: approximately 650 kW (1.500 m3/h , 12 bar)
Independent power supply: medium or high voltage power supply from diesel engine driven generator. Submerged installation of motor and pump in a dedicated caisson (far below the topside).

*Please refer to scope of work for further details relation to specifications and standards.
Emergency and Essential Generators Diesel Engines Package14 May 201911 Jun 201911 Jun 2019
  
Please refer to the scope of works for details of the package
Centrifugal Pumps16 Dec 201910 Jan 202010 Jan 2020
  
Please review the scope of works document for more details of the package.
RO Water Maker16 Dec 201910 Jan 202010 Jan 2020
  
Please review the scope of works document for more details on the package.
Fast Rescue Boats and Winches22 Jan 202003 Feb 202003 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
Spring Strut and Snubbers22 Jan 202003 Feb 202003 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
Flare03 Feb 202013 Feb 202013 Feb 2020
  
Please see SOW for further details on this package
HV Switchgear03 Feb 202013 Feb 202013 Feb 2020
  
Please refer to the scope of works document for details of the package
Inlet Pig Receiver03 Feb 202013 Feb 202013 Feb 2020
  
Please refer to the scope of woks document for details of the package
LV Switchboards03 Feb 202013 Feb 202013 Feb 2020
  
Please refer to the scope of works document for details of the package
Pressure Vessels03 Feb 202013 Feb 202013 Feb 2020
  
Please refer to the scope of works document for details of the package
Shell and Tube Heat Exchangers03 Feb 202013 Feb 202013 Feb 2020
  
Please refer to the scope of works document for details of the package
Transformers03 Feb 202013 Feb 202013 Feb 2020
  
Please refer to the scope of works document for details of the package
Miscellaneous Safety Equipment17 Feb 202027 Feb 202027 Feb 2020
  
Please refer to SOW for further details pertaining to this package.
Air Handling Unit Plus Fan18 Feb 202028 Feb 202028 Feb 2020
  
Please see scope for full details
Cooling Unit18 Feb 202028 Feb 202028 Feb 2020
  
See scope for full details
Fire Fighting Equipment20 Feb 202001 Mar 202001 Mar 2020
  
Please refer to SOW for more information pertaining to this package.
Nitrogen Generator Package20 Feb 202001 Mar 202001 Mar 2020
  
Please refer to SOW for further details pertaining to this work.
Waste Drums24 Feb 202005 Mar 202005 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
Well Clean Up Package Skid24 Feb 202005 Mar 202005 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
Multitube Hair Pin Heat Exchanger24 Feb 202006 Mar 202006 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
API 6D Ball Valves27 Feb 202009 Mar 202009 Mar 2020
  
*SOFT AND METAL SEATED Valves - Please refer to SOW for further details pertaining to this package.
Free Fall Life Boats25 Feb 202009 Mar 202009 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
Modular Ball Valves27 Feb 202009 Mar 202009 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
Spades Spacers 24 inches03 Mar 202013 Mar 202013 Mar 2020
  
Please refer to SOW for further details pertaining to this package.
Control Valves07 Apr 202020 Apr 202020 Apr 2020
  
Please refer to SOW for further details pertaining to this package.
ON and OFF Valves Butterfly Pneumatically Actuated07 Apr 202020 Apr 202020 Apr 2020
  
Please refer to SOW for further details pertaining to this package.
Sewage Treatment Unit21 Apr 202001 May 202001 May 2020
  
Please refer to SOW for further details pertaining to this package.
Air Cooled Chiller Plant23 Apr 202004 May 202004 May 2020
  
Please refer to SOW for further details pertaining to this package.
Jacketed Spiral Strand Wire20 Apr 202004 May 202004 May 2020
  
Please see SOW for further details pertaining to this package.
Mooring Chain20 Apr 202004 May 202004 May 2020
  
Please refer to SOW for further details pertaining to package.
STATUS   SUBSEA INTEGRATION ALLIANCE    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Flexible Risers and Jumpers Supply12 Nov 201922 Nov 201922 Nov 2019
  
Please refer to the scope of works document for details of the package