PERDAMAN CHEMICALS AND FERTILISERS PTY LTD

PERDAMAN PROJECT CERES

location_onWA Australia
location_on

WA Australia

business

PERDAMAN CHEMICALS AND FERTILISERS PTY LTD

Project Primary Contact
person_outline
Andie Pfaff
Supply Chain Consultant
phone_enabled
+61 8 9365 7442
Overview

The Saipem Clough Joint Venture, comprising Saipem S.p.A and Clough Projects AustraliaPtyLtd, has been selected as the EPC contractor for the development of Perdaman Industries' urea plant on the Burrup Peninsula approximately eight kilometres from Dampier and twenty kilometres northwest of Karratha on the north-west coastline of Western Australia (the Project).


The facility will consist of the urea fertiliser plant and related facilities with a capacity of 2 million tonnes of urea per annum. The facility includes a water treatment plant, a power plant (100MW), as well as urea storage, loading and unloading facilities. A closed conveyer will transport the urea 7 kilometres directly to the Pilbara Ports Authority for shipping to local and offshore markets, with 50 to 100 shiploads expected per year.


The Joint Venture's scope of work includes engineering, construction, pre-commissioning and commissioning of the ammonia and urea plant including EPC for all site civils, process plant, utilities, urea handling, storage and loadout, storage facilities and site buildings.


The Saipem Clough Joint Venture wish to engage early with businesses to maximise local and Indigenous participation. We are inviting expressions of interest from all businesses interested in participating in the Project.

131
Total Work Packages
131
Other Work Packages
131
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2023
Partial scope EOI closes on
12 Apr 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2023
Partial scope EOI closes on
28 Apr 2023

Please refer to SOW for additional details.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2023
Partial scope EOI closes on
28 Apr 2023

Please refer to SOW for additional details.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2023
Partial scope EOI closes on
28 Apr 2023

Please refer to SOW for additional details.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2023
Partial scope EOI closes on
28 Apr 2023

Please refer to SOW for additional details.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2023
Partial scope EOI closes on
28 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2023
Partial scope EOI closes on
28 Apr 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2023
Partial scope EOI closes on
28 Apr 2023

Please refer to SOW for additional details.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 May 2023
Partial scope EOI closes on
18 May 2023

Please refer to SOW document for further information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 May 2023
Partial scope EOI closes on
18 May 2023

Please refer to the SOW document for additional information pertaining to this Package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 May 2023
Partial scope EOI closes on
18 May 2023

Please refer to SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 May 2023
Partial scope EOI closes on
18 May 2023

Please refer to SOW document for further information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 May 2023
Partial scope EOI closes on
29 May 2023

Please refer to the SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 May 2023
Partial scope EOI closes on
29 May 2023

Please refer to the SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Jun 2023
Partial scope EOI closes on
12 Jun 2023

Please refer to the scope of work document for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Jun 2023
Partial scope EOI closes on
12 Jun 2023

Please refer to the scope of work document for further details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Jun 2023
Partial scope EOI closes on
12 Jun 2023

Please refer to the SOW document for additional information regarding this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Jun 2023
Partial scope EOI closes on
12 Jun 2023

Please refer to the SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Jun 2023
Partial scope EOI closes on
12 Jun 2023

Please refer to the scope of work document for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
19 Jun 2023
Partial scope EOI closes on
19 Jun 2023

Please refer to the SOW for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
19 Jun 2023
Partial scope EOI closes on
19 Jun 2023

Please refer to the SOW for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Jul 2023
Partial scope EOI closes on
06 Jul 2023

Please refer to scope of work document for additional information in relation to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Jul 2023
Partial scope EOI closes on
10 Jul 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Jul 2023
Partial scope EOI closes on
12 Jul 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
14 Jul 2023
Partial scope EOI closes on
14 Jul 2023

Please refer to SoW document for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jul 2023
Partial scope EOI closes on
18 Jul 2023

Please refer to SOW document for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 Jul 2023
Partial scope EOI closes on
27 Jul 2023

Please refer to the SOW for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2023
Partial scope EOI closes on
31 Jul 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Aug 2023
Partial scope EOI closes on
04 Aug 2023

Please refer to the SOW document for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Aug 2023
Partial scope EOI closes on
04 Aug 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Aug 2023
Partial scope EOI closes on
04 Aug 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Aug 2023
Partial scope EOI closes on
04 Aug 2023

Please refer to scope of work document for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
07 Aug 2023
Partial scope EOI closes on
07 Aug 2023

Please refer to scope of work document for additional details pertaining to this work.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
14 Aug 2023
Partial scope EOI closes on
14 Aug 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
14 Aug 2023
Partial scope EOI closes on
14 Aug 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Aug 2023
Partial scope EOI closes on
28 Aug 2023

Please refer to scope of work document for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
01 Sep 2023
Partial scope EOI closes on
01 Sep 2023

Please refer to scope of work document for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Sep 2023
Partial scope EOI closes on
04 Sep 2023

Please refer to the scope of work for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Sep 2023
Partial scope EOI closes on
04 Sep 2023

Please refer to the scope of work for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
07 Sep 2023
Partial scope EOI closes on
07 Sep 2023

Please refer to the scope of work for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
07 Sep 2023
Partial scope EOI closes on
07 Sep 2023

Please refer to the scope of works document for additional information relating to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
07 Sep 2023
Partial scope EOI closes on
07 Sep 2023

Please refer to the scope of work for additional details in relation to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
11 Sep 2023
Partial scope EOI closes on
11 Sep 2023

Please refer to the scope of work document for any additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
11 Sep 2023
Partial scope EOI closes on
11 Sep 2023

Please refer to the scope of work for additional information with regards to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
11 Sep 2023
Partial scope EOI closes on
11 Sep 2023

Please refer to scope of work for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Sep 2023
Partial scope EOI closes on
18 Sep 2023

Please refer to the Scope of Work document for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
25 Sep 2023
Partial scope EOI closes on
25 Sep 2023

Please refer to the scope of work for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
02 Oct 2023
Partial scope EOI closes on
02 Oct 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Oct 2023
Partial scope EOI closes on
06 Oct 2023

Please refer to scope of work for further details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Oct 2023
Partial scope EOI closes on
06 Oct 2023

Please refer to scope of works for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Oct 2023
Partial scope EOI closes on
12 Oct 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Oct 2023
Partial scope EOI closes on
12 Oct 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
19 Oct 2023
Partial scope EOI closes on
19 Oct 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Oct 2023
Partial scope EOI closes on
24 Oct 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Oct 2023
Partial scope EOI closes on
24 Oct 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Oct 2023
Partial scope EOI closes on
24 Oct 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
01 Nov 2023
Partial scope EOI closes on
01 Nov 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
01 Nov 2023
Partial scope EOI closes on
01 Nov 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
02 Nov 2023
Partial scope EOI closes on
02 Nov 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
09 Nov 2023
Partial scope EOI closes on
09 Nov 2023

Please refer to scope of work for additonal details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
14 Nov 2023
Partial scope EOI closes on
14 Nov 2023

Pressure Transmitters, Differential Pressure Transmitters, Temperature Elements and Thermowells, Temperature Transmitters and Local Indicators.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Nov 2023
Partial scope EOI closes on
17 Nov 2023

Please refer to the scope of works for further details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Nov 2023
Partial scope EOI closes on
17 Nov 2023

Please refer to the scope of work for further details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Nov 2023
Partial scope EOI closes on
17 Nov 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Nov 2023
Partial scope EOI closes on
17 Nov 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Nov 2023
Partial scope EOI closes on
17 Nov 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Nov 2023
Partial scope EOI closes on
28 Nov 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Nov 2023
Partial scope EOI closes on
30 Nov 2023

Please refer to the scope of work for additional details pertaining to this work package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Dec 2023
Partial scope EOI closes on
04 Dec 2023

Venturi Tubes, Flow Nozzles, Pitot Tubes, Orifice Plates and Restriction Orifice.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
20 Dec 2023
Partial scope EOI closes on
20 Dec 2023

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Dec 2023
Partial scope EOI closes on
28 Dec 2023

Please refer to the Scope of Work for further detail pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
09 Jan 2024
Partial scope EOI closes on
09 Jan 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
09 Jan 2024
Partial scope EOI closes on
09 Jan 2024

Please refer to the scope of work document for additional details pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Jan 2024
Partial scope EOI closes on
12 Jan 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
15 Jan 2024
Partial scope EOI closes on
15 Jan 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
15 Jan 2024
Partial scope EOI closes on
15 Jan 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
15 Jan 2024
Partial scope EOI closes on
15 Jan 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
25 Jan 2024
Partial scope EOI closes on
25 Jan 2024

Please refer to the scope of work document for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Feb 2024
Partial scope EOI closes on
26 Feb 2024

Please refer to the scope of work for further information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2024
Partial scope EOI closes on
12 Apr 2024

Please refer to the scope of work for additional information in relation to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Apr 2024
Partial scope EOI closes on
29 Apr 2024

Please refer to scope of work for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
07 May 2024
Partial scope EOI closes on
07 May 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 May 2024
Partial scope EOI closes on
21 May 2024

Please refer to scope of work for additional information.
*Please note that the SoW document may prove to be difficult to read, however click on Cntrl and + to enlarge it for a more readable version.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 May 2024
Partial scope EOI closes on
24 May 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 May 2024
Partial scope EOI closes on
24 May 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
20 Jun 2024
Partial scope EOI closes on
20 Jun 2024

Please refer to the scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
08 Jul 2024
Partial scope EOI closes on
08 Jul 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
08 Jul 2024
Partial scope EOI closes on
08 Jul 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
09 Aug 2024
Partial scope EOI closes on
09 Aug 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Aug 2024
Partial scope EOI closes on
30 Aug 2024

Please refer to the scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
13 Sep 2024
Partial scope EOI closes on
13 Sep 2024

Please refer to the scope of work for additional information pertaining to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Sep 2024
Partial scope EOI closes on
16 Sep 2024

Please refer to the scope of work for further information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Sep 2024
Partial scope EOI closes on
16 Sep 2024

Please refer to the scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
20 Sep 2024
Partial scope EOI closes on
20 Sep 2024

Please refer to the SoW document for additional details.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Oct 2024
Partial scope EOI closes on
30 Oct 2024

Please refer to the scope of work for additional information in relation to this package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Oct 2024
Partial scope EOI closes on
31 Oct 2024

Please refer to the scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
07 Nov 2024
Partial scope EOI closes on
07 Nov 2024

Please refer to the scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2024
Partial scope EOI closes on
22 Nov 2024

Please refer to the scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.