Perdaman Chemicals and Fertilisers



Contact Details


Linus O'Brien
+61 8 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: EPC Development
  Project Owner PERDAMAN CHEMICALS AND FERTILISERS PTY LTD

Project Details


Perdaman Chemicals and Fertilisers are focused on the development of the world’s largest stream urea plant with a production capacity of 2 MTPA.  The plant is located within the Burrup Strategic Industrial Area, Burrup Peninsula, approximately 10km from Dampier and 20km north-west of Karratha on the north west coastline of Western Australia. The development will utilise local natural gas for fertiliser production, using innovative and low-emissions technologies and will be Australia’s first Urea Export Project generating Export Revenue of US$ 800 Million/year.  The facility will consist of a Syngas Production Block, Fertiliser Production Block and Offsite Facilities and Utilities.

SHOW LESS

Work Packages


There are currently no open work packages for this project.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
ASU and N2 Washdown Units16 Feb 201926 Feb 201926 Feb 2019
Please refer to the scope of woks document for details of the package
33 kV Switchroom and Switchgear16 Feb 201927 Feb 201927 Feb 2019
33 kV Primary Distribution Switchgear, in transportable switchroom.
6.6 kV 400 V Switchgear and Switchroom16 Feb 201927 Feb 201927 Feb 2019
Supply of 6.6 kV, 400 V Switchgear & Switchroom
Emergency Diesel Generators16 Feb 201928 Feb 201928 Feb 2019
Containerised 6.6 kV Emergency Diesel Generators, includes synchronisation and load sharing controls.
MV VSDs and LV VSDs16 Feb 201928 Feb 201928 Feb 2019
6.6 KV and 400 V Variable Speed Drives
Gas Power Station16 Feb 201901 Mar 201901 Mar 2019
Combined cycle gas power station, inclusive of HRSG and all auxiliary equipment, local electrical switchroom and control room for a complete power station design and supply.
Power Transformers16 Feb 201901 Mar 201901 Mar 2019
Distribution transformers 33/11 kV, 33/6.6 kV, 6.6/400 V
Electrical Power and Control Cables20 Feb 201905 Mar 201905 Mar 2019
Supply of Electrical Power and Control Cables, Instrumentation and Communication Cables with Glands and Termination kits.
Materials Handling Package21 Feb 201905 Mar 201905 Mar 2019
Design, procurement and supply of materials handling equipment capable of transporting urea from the plant to the port facility, approximately 3 km, at approx. 2,200 tph, and loading onto a Panamax bulk carrier.
Ammonia Pumps01 Mar 201914 Mar 201914 Mar 2019
Four HP Ammonia Pumps
Four HP Carbamate Pumps
Cooling Towers01 Mar 201914 Mar 201914 Mar 2019
The cooling tower package will include modular cell induced draft flow GRP cooling towers for design water flow rate of 51,561m3/h to provide cooling for seawater from 45C to 35C. A maximum of 3100 m3/h of sea water will be available.
Pressure Vessels MP- LP01 Mar 201918 Mar 201918 Mar 2019
Protective coating and insulation are included in vendor scope.
See scope for full details
Shell and Tube Heat Exchangers (HP)01 Mar 201919 Mar 201919 Mar 2019
Exchangers to be designed in accordance with TEMA Class R.
Protective coating and insulation are included in vendor scope.
See scope for full details.
Shell and Tube Heat Exchangers -MP-LP01 Mar 201919 Mar 201919 Mar 2019
Exchangers to be designed in accordance with TEMA Class R.
Protective coating and insulation are included in vendor scope.
Shell and Tube Heat Exchangers - Special01 Mar 201919 Mar 201919 Mar 2019
Exchangers to be designed in accordance with TEMA Class R.
Protective coating and insulation are included in vendor scope.
Centrifugal Compressor01 Mar 201920 Mar 201920 Mar 2019
See scope for full details.
Plate Heat Exchangers01 Mar 201920 Mar 201920 Mar 2019
Please see scope for details. Protective coating included in vendor scope.
Ammonia Converter01 Mar 201921 Mar 201921 Mar 2019
The Ammonia Converter is a specialized equipment based on proprietary information owned by Haldor Topsoe who is the Licensor of the ammonia technology for this Project. Please see the attached scope for further details.
Hydrogen Converter01 Mar 201921 Mar 201921 Mar 2019
The Hydrogen Converter is a pressure vessel in the carbon dioxide compression system of the urea plant. The urea technology is from Stamicarbon b.v. for this Project. This equipment comprises of a pressure shell with catalyst holding arrangements inside.
Non Process Buildings - Gate House x 2 and 1 x Laboratory Buildings27 Mar 201909 Apr 201909 Apr 2019
The Urea plant will require non-process infrastructure including the Gate Houses (approx. 10 x3.5m) and a laboratory (approx. 20 x 20m) inclusive of toilet, kitchen and office facilities.

The scope of work will include the following main activities:
*Please refer to the scope of work for further details.
Non Process Buildings re Chemical Storage Warehouse and Maintenance Buildings27 Mar 201909 Apr 201909 Apr 2019
The Urea plant will require non-process infrastructure including:
. the Chemical Storage with appropriate ventilation (approx. 40 x 40m storage building with a 20 x 40m open storage yard) inclusive of toilets, kitchen and office facilities.
. Warehouse (44 x 41.5m Warehouse building with 25 x 41.5m open storage area) inclusive of toilets, lunchroom and storage rooms.
. Maintenance building (51.6 x 52.5m) complete with toilets, lunchroom, offices and storerooms. Work includes the supply and installation of a 10 ton overhead travelling crane.

The scope of work will include the following main activities:
Please refer to the scope of work for further details.
Ammonia and Field Fabricated Storage Tanks28 Mar 201910 Apr 201910 Apr 2019
This package will include:
*Please refer to scope of work for further details.
Centrifugal Pumps (API and ANSI)28 Mar 201910 Apr 201910 Apr 2019
P5411 package includes centrifugal horizontal, vertical CAN type and submersible pumps in Urea and Ammonia application, potable water, waste water and oily water systems, firefighting pumps, boiler feed water application and cooling water and sea water services. The pumps will be designed and fabricated per API, ANSI and manufacturer's standard. *Please refer to scope of work for further details.
CS Seam and Seamless CS Pipe28 Mar 201910 Apr 201910 Apr 2019
Scope of this package comprises of all Carbon Steel Pipe, required for the Process and Utility Services.
All piping shall be fabricated in compliance with the indicated ASTM and API standards for furnishing, permissible fabrication variations and minimum testing requirements.

The scope covers fabrication of;
*Please refer to scope of work for further details.
Urea Storage Buildings28 Mar 201911 Apr 201911 Apr 2019
The Urea plant will require the following storage building for urea:
- Urea storage building in process plant
- Urea storage building near Dampier Port

The scope of work will include the following main activities:
Please refer to scope of work for further details.
Control Valves29 Mar 201912 Apr 201912 Apr 2019
Supply of all control valves in this plant. The supplier is expected to provide all labour, engineering services, supervision, equipment, material, consumables and other incidentals necessary to design, fabricate, paint, assemble, inspect, and test control valves.
Integrated Control and Safety System29 Mar 201912 Apr 201912 Apr 2019
This package defines the Technical Requirements for the supply of a Distributed Control System (DCS) and an Emergency Shutdown System (ESD) incorporated in a single System Architecture to constitute an Integrated Control and Safety System (ICSS). Each system shall retain its own functionality communicating with each other and with third party package equipment via a dual redundant Fault Tolerant Ethernet (FTE) network and transmitting all the process control and safety data to the Servers, Operator Workstations (OWS) and Engineering Workstations (EWS) to be installed in Central Control Room (CCR). Please refer to scope of work for further details.
HP Pipe and Fittings (Safurex)17 Apr 201929 Apr 201929 Apr 2019
Please review the scope of works document for details on the package.
Safety and Relief Valve17 Apr 201929 Apr 201929 Apr 2019
Please review the scope of works document for details of the package.
Grounding System17 Apr 201930 Apr 201930 Apr 2019
Please review the scope of works document for details of the package.
Supply of Switchrooms including switchgear and VFDs - 6.6kV and 400V17 Apr 201930 Apr 201930 Apr 2019
Please review the scope of works document for details of the package.
Cable Tray and Fittings JBs Start-stop buttons17 Apr 201901 May 201901 May 2019
Please review scope of works document for details of the package.
Cathodic Protection System17 Apr 201902 May 201902 May 2019
Please review the scope of works document for details of the package.
Fire Alarm System17 Apr 201902 May 201902 May 2019
Please review the scope of works document for details of the package.
Lighting System17 Apr 201901 May 201902 May 2019
Please review the scope of works document for details of the package.
Gas Detector17 Apr 201903 May 201903 May 2019
Please review the scope of works document for details of the package.
Tube and Fittings Pre-insulated Tubes17 Apr 201903 May 201903 May 2019
Please review the scope of works document for details of the package.
Flow Meters17 Apr 201906 May 201906 May 2019
Please review the scope of works document for details of the package.
Major Instruments - DP Pressure Transmitters Temperature Transmitters17 Apr 201906 May 201906 May 2019
Please review scope of works document for details of the package.
Flow Nozzles plus orifice plates and flanges17 Apr 201907 May 201907 May 2019
Please review the scope of works document for details of the package.
Gauges and Level Instruments17 Apr 201907 May 201907 May 2019
Please review the scope of works document for details of the package.
Instrumentation - Prefabricated Analysers House and Field Mounted Analyzer System17 Apr 201908 May 201908 May 2019
Please review the scope of works document for details of the package.
Bolts - Nuts and Gaskets18 Apr 201909 May 201909 May 2019
Please review the scope of works document for details of the package.
GRP/FRP Piping18 Apr 201909 May 201909 May 2019
Please review the scope of works document for details of the package.
Pipe Supports - Engineered18 Apr 201910 May 201910 May 2019
Please review the scope of works document for details of the package.
Shop Fabricated Tanks18 Apr 201910 May 201910 May 2019
Please review the scope of works document for details of the package.
Column Internals18 Apr 201913 May 201913 May 2019
Please review the scope of works document for details of the package.
Deaerator18 Apr 201913 May 201913 May 2019
Please review the scope of works document for details of the package.
CPI Oil Separator18 Apr 201914 May 201914 May 2019
Please review the scope of works document for details of the package.
Crusher18 Apr 201914 May 201914 May 2019
Please review the scope of works document for details of the package.
Emergency Plant and Instrument Air30 Apr 201915 May 201915 May 2019
See scope for full details
Exotic/SS Pipe and Fittings18 Apr 201915 May 201915 May 2019
Please review the scope of works document for details of the package.
Fired Heaters30 Apr 201915 May 201915 May 2019
See scope for full details
Manual Valves18 Apr 201915 May 201915 May 2019
Please review the scope of works document for details of the package.
Product Cooler System30 Apr 201915 May 201915 May 2019
See scope for full details
Fluid Bed Cooler24 Apr 201916 May 201916 May 2019
Please review the scope of works document for details of the package.
Supply of Agitators24 Apr 201916 May 201916 May 2019
Please review the scope of works document for details of the package.
Supply of Air Heater24 Apr 201917 May 201917 May 2019
Please review the scope of works document for details of the package.
Supply of Hair Pin Exchangers24 Apr 201917 May 201917 May 2019
Please review the scope of works document for details of the package.
Ammonia BOG Refrigerant Unit24 Apr 201920 May 201920 May 2019
please review the scope of works document for details of the package.
Diesel Engine Generator24 Apr 201920 May 201920 May 2019
Please review the scope of works document for details of the package.
Fans and Blowers24 Apr 201920 May 201920 May 2019
Please review the scope of works document for details of the package.
Product Diverter24 Apr 201921 May 201921 May 2019
Please review the scope of works document for details of the package.
Bucket Elevator24 Apr 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
Security Systems (ACS)24 Apr 201922 May 201922 May 2019
Please review the scope of works document for details of the package.
OSP and Structured Cabling24 Apr 201923 May 201923 May 2019
Please review the scope of works document for details of the package.
RF (Radio)24 Apr 201923 May 201923 May 2019
Please review the scope of works document for details of the package.
CCTV System24 Apr 201924 May 201924 May 2019
Please review the scope of works document for details of the package.
Data Networks24 Apr 201924 May 201924 May 2019
Please review the scope of works document for details of the package.
Camp Management17 May 201929 May 201929 May 2019
Please review the scope of works document for details of the package.
Customs Brokerage17 May 201929 May 201929 May 2019
Please review the scope of works document for more details of the package.
International Freight17 May 201929 May 201929 May 2019
Please review the scope of works document for details of the package.
Insulation and Cladding21 May 201931 May 201931 May 2019
Please refer to scope of works document for details of the package
Heavy Lift and Rigging23 May 201902 Jun 201902 Jun 2019
Please review the scope of works document for details of the package.
Heavy Transportation (SPMT)23 May 201902 Jun 201902 Jun 2019
Please review the scope of works document for details of the package.
Scaffolding23 May 201902 Jun 201902 Jun 2019
Please review the scope of works document for details of the package.
Earthworks23 May 201903 Jun 201903 Jun 2019
Please refer to the scope of works for details of the package
Construction Camp23 May 201904 Jun 201904 Jun 2019
Please review the scope of works document for details of the package.
Construction water23 May 201904 Jun 201904 Jun 2019
Please review the scope of works document for details of the package.
Fuel storage and Distriubiton23 May 201904 Jun 201904 Jun 2019
Please review the scope of works document for details of the package.
Standard Cranes - Dry Hire23 May 201904 Jun 201904 Jun 2019
Please review the scope of works document for details of the package.
Temporary Facilities - Service and Maintenance23 May 201904 Jun 201904 Jun 2019
Please review the scope of works document for details of the package.
Temporary facilities - Supply and Installation23 May 201904 Jun 201904 Jun 2019
Please review the scope of works document for details of the package.
Waste Management23 May 201904 Jun 201904 Jun 2019
Please review the scope of works document for details of the package.
Catalyst13 Jun 201923 Jun 201923 Jun 2019
Please review the scope of works document for details of the package.
Ejector and Injector13 Jun 201923 Jun 201923 Jun 2019
Please review the scope of works document for details of the package.
Filters13 Jun 201923 Jun 201923 Jun 2019
Please review the scope of works document for details for the package.
Continuous Emission Monitoring System (CEMS)29 May 201924 Jun 201924 Jun 2019
Please refer to scope of work for further details pertaining to this work package.
Electrical Heat Tracing System14 Jun 201924 Jun 201924 Jun 2019
Please review the scope of works document for details of the package.
Fire Fighting Equipment14 Jun 201924 Jun 201924 Jun 2019
Please review the scope of works document for details of the package.
Machine Monitoring System (MMS)29 May 201924 Jun 201924 Jun 2019
Please refer to scope of work for further details pertaining to this package.
Piperack Modules14 Jun 201924 Jun 201924 Jun 2019
Please view scope of works for further details pertaining to this work.
Flare Stack30 May 201925 Jun 201925 Jun 2019
Please refer to scope of works for further details pertaining to this package.
General Civil Works15 Jun 201925 Jun 201925 Jun 2019
Please refer to the scope of works for details on the package
Non Destructive and Post Weld Heat Treatment Testing09 Jul 201923 Jul 201923 Jul 2019
Please refer to scope of work for further details pertaining to this package.
Sanitary Sewage Treatment Plant09 Jul 201923 Jul 201923 Jul 2019
Please refer to scope of work for further details pertaining to this package.
Traffic Management09 Jul 201923 Jul 201923 Jul 2019
Please refer to scope of work for further details pertaining to this work.
Passenger Lift for Urea Granulation Building19 Jul 201902 Aug 201902 Aug 2019
Please refer to scope of work for further details pertaining to this work.
Desalination Plant16 Feb 201926 Feb 2019 
Please refer to scope of works document for details of the package