Kwinana Waste-to-Energy Project



Contact Details


  Linus O'Brien
  (08) 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: Live
  Project Owner Macquarie Capital & Acciona Group JV

Project Details


ACCIONA’s Engineering, Procuring & Construction (EPC) contract will deliver the first of its kind in Australia, a $700 million project in the Kwinana Industrial Area which will process up to 400,000 tonnes a year of household waste. Using best practice technologies and processes, the facility will export an estimated 36MW of electricity back to the grid – enough to power around 50,000 homes.

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Feedwater Pumps23 Jan 1925 Apr 1925 Apr 19
Supply, testing and delivery of Feedwater Pumps.
Civil Works22 Jan 191 May 191 May 19
Civil works required as per Technical Specifications. This works may include concrete supply, steel reinforcement, formwork and climbing formwork.
Lift23 Jan 191 May 191 May 19
Supply, testing, delivery and Assembly of Lift(s).
Emergency Diesel Generator23 Jan 192 May 192 May 19
Supply and Testing of the Emergency Diesel Generator.
Electrical Works - Underground Earthing System15 Feb 198 May 198 May 19
Scope is for Supply, Installation and Commissioning of Underground Earthing systems.
Electrical Works - DC System15 Feb 1916 May 1916 May 19
Engineering, Supply, Installation and Commissioning of DCS Systems including:
*Engineering, supply, installation and commissioning of all active equipment (including network equipment as required for their systems) but not data cabling between comms cabinets and consolidation points (field patching panels);
*supply and install their own patch leads within comms cabinets between the comms racks and their active equipment;
*all active controls equipment on POE; and
*detailing the points lists and in spatially determining the location of field devices during design and not during construction.
On Site Tanks23 Jan 1917 May 1917 May 19
Supply of material, delivery, assembly and testing on site of:
- Demi water tank
- Raw water
The scope includes any machinery and equipment necessary for the correct development of the scope and its removal out of the site after the works.
HVAC System23 Jan 1924 May 1924 May 19
See Attached Scope of Work
Auxiliary Horizontal/Vertical Pumps22 Jan 195 Jun 194 Jun 19
Supply, testing and delivery of Auxiliary Horizontal / Vertical Pumps including:
. Makeup Pumps
. Demi Water Pumps
. Drain Pumps
. Service Water Pump
HVAC - Supply and Installation15 Feb 197 Jun 197 Jun 19
Engineering, supply, installation and commissioning of the main Facility domestic HVAC systems.
Please note, this excludes the Administration Building as this is included in the Architecture - Admin Building Refurbishment package.
Mechanical Works23 Jan 191 Jul 191 Jul 19
Mechanical Works for pipe assembly, including but not limited to fittings, valves and accessories for the entire power block.
Mechanical Works - Boiler Installation15 Feb 192 Jul 192 Jul 19
All erection and installation works including receipt and care of all Acciona supplied plant, equipment and materials and engineering, supply and installation of associated BOP and & pre-commissioning of the package works.
Mechanical Works - Boiler Pipework15 Feb 192 Jul 192 Jul 19
Supply and installation of boiler and pipework thermal insulation, lagging and associated cladding and sheathing.
Workshop Tanks23 Jan 1917 Jul 1917 Jul 19
Supply, delivery and testing ofWorkshop Tanks, including but not limited to:
- Closed Cooling Expansion Vessel
- Boiler Drain-Down Tank
- Steam Turbine External Drain Tank
- ReuseWater Elevated Tank
- Diesel Storage Tank
- Condenser Tank (If not included in ACC Supply)
Structural Works15 Feb 1919 Aug 1919 Aug 19
Supply, Fabrication and Erection of steel structure for the whole structure including, but not limited to, the bunker, reception hall, turbine room and electrical sectors including secondary steel framing for external wall and roof cladding, racks, steam turbine cladding and roof.
Minor Hoists and Jib Cranes15 Feb 1920 Aug 1920 Aug 19
Engineering, supply, installation and commissioning of the Minor Hoists and Jib Cranes.
Architecture - Main Building Works15 Feb 1910 Oct 1910 Oct 19
Subcontract for the remaining architectural works of the plant.
Mechanical Works - Environmental Systems15 Feb 196 Nov 196 Nov 19
All erection and installation works including engineering, supply and installation of all Environmental Systems including, but not limited to:
Ductwork and duct supports; and
Receipt, care, installation and commissioning of Acciona supplied plant and equipment:
Compressed Air Generation System
Filter systems
Air sampling system(s)
Stack Associated Mechanical Systems
Mechanical Works - Turbine Installation15 Feb 197 Nov 197 Nov 19
All erection and installation works including receipt and care of all Acciona supplied plant, equipment and materials and engineering, supply and installation of associated BOP and & pre-commissioning of the package works.
Substation -Trafo-GIS- Civil and Builders Works15 Feb 1913 Nov 1913 Nov 19
Construct only Subcontract for the Substation works.
Architecture - Admin Building Bridge and Lift15 Feb 1920 Nov 1920 Nov 19
Subcontract for the architectural works for the final Administration Building refurbishment, including (but not limited to); bridge interfaces, lift at the east end of the building and any final making good prior to completion and COD.
Civil - General15 Feb 1921 Nov 1921 Nov 19
Civil works related in Weigh Bridge, access control and CCTV works.
Kwinana Waste-to-Energy Project - Any Opportunities16 Nov 1816 Dec 19 
Express interest for any opportunities that may arise for this project.
Electrical Works - General15 Feb 193 Feb 203 Feb 20
Scope is for Supply, Installation and Commissioning of LV systems generally including, but not limited to: Lighting & Small Loads Materials, Lighting & Small Loads Panel board & LV/LV Transformers, Junction Boxes
Lightning Protection System, Low Voltage Cables, I&C Cables, UPS System, Telephony And Data System
Public Address System, Aerial Earthing System.
Mechanical Works - General15 Feb 193 Feb 203 Feb 20
Engineering, supply and installation of BOP and & pre-commissioning of mechanical works not included in MEC.1 to MEC.4. and receipt and care of all Acciona supplied plant, equipment and materials.
Mechanical Works - ACC Installation15 Feb 197 Feb 207 Feb 20
All erection and installation works including receipt and care of all Acciona supplied plant, equipment and materials and engineering, supply and installation of associated BOP and & pre-commissioning of the package works.
CCTV- Intruder Detection and Site Access Control15 Feb 1914 Apr 2014 Apr 20
Engineering, Supply, Installation and Commissioning not including temporary CCTV or Security.
Curbs and Site Walks Works15 Feb 1914 May 2014 May 20
Subcontract for the urbanisation of the site; comprising of the construction of curbing and paths.
Piling Works (018)28 Nov 1812 Dec 1812 Dec 18
Piling Works including, but not limited to, design, supply, manufacturing, execution, plan, all management, supervision, engineering, technical support, labor, materials, transport, plant and equipment for the Piling works.
*Please also refer to scope of work for further details pertaining to this package.
Earthworks17 Dec 187 Jan 197 Jan 19
Earth movements required for the Site arrangement previous to any civil and piling works. Including but not limited to excavation works in the bunker area, ponds area and gravel filling. Scope to also include loading & management of excavated material, hauling and disposal to a stockpile on site and to a dump site.
Fire Fighting Systems (FFS)17 Dec 187 Jan 197 Jan 19
Supply, testing, delivery and installation of the Fire Fighting System.
Refuse Crane System17 Dec 187 Jan 197 Jan 19
Supply, testing, delivery and Assembly of Refuse Crane System.
Deaerator and Feed Water Tanks29 Dec 1818 Jan 1918 Jan 19
Supply, delivery and testing of Deaerator & FeedWater Tanks.
Condensate Pumps2 Jan 1923 Jan 1923 Jan 19
Supply, testing and delivery of Condensate Pumps.
Stack Structure Works15 Feb 1927 Feb 1927 Feb 19
Design and Construct (D&C) of the flue-gas stack.
Mechanical Works - Fire Systems15 Feb 192 Mar 192 Mar 19
Engineering, supply, installation and commissioning of wet fire systems, including fire water tanks.
Oily Water Separators23 Jan 1915 Mar 1915 Mar 19
Supply, testing, delivery and assembly of the Oily Water Separators.
Aerobic Treatment Unit (ATU)22 Jan 1912 Apr 1912 Apr 19
Supply, testing, delivery and Assembly of the Aerobic Treatment Unit (ATU).
Chemical Dosing System22 Jan 1912 Apr 1912 Apr 19
Supply, testing, delivery and installation of the Chemical Dosing System.
Deodorization System23 Jan 1913 Apr 1913 Apr 19
Supply, testing, delivery and installation of the Deodorization System.
Natural Gas Regulation System23 Jan 1913 Apr 1913 Apr 19
Supply, testing, delivery and Installation of the Natural Gas Regulation System.
Water Treatment Plant23 Jan 1913 Apr 1913 Apr 19
Supply, testing, delivery and assembly of the Water Treatment Plant.
Civil - Main Building Foundations and Concrete Structures15 Feb 1916 Apr 1916 Apr 19
Including in ground engineering services, foundations (including detailed excavation and backfill) and concrete structures for Boiler, Bunker, Reception Hall, Electrical Building.
HAZOP Study23 Jan 1916 Apr 1916 Apr 19
Development and delivery of the HAZOP study for the project.