New Maitland Hospital



Contact Details


  Dusko Bajic
  (04) 1732 3636
 CONTACT EMAIL

  Locations: NSW Australia
  Project Value: $470 million
  Project Status: Under Construction - Early Works
  Project Owner MULTIPLEX CONSTRUCTIONS PTY LTD

Project Details



About Multiplex

Multiplex is currently appointed to provide design services and carry out early works on site to facilitate the construction of the facility.

Multiplex has been a leader in the construction industry for more than 55 years. In that time we have delivered some of the world’s most recognisable buildings and important infrastructure assets, and transformed communities along the way. 

We have a growing presence in Australia, India, the Middle East, Europe and Canada with almost 3,600 employees worldwide. Together we have earned some 630 awards and built a strong track record in the residential, health, retail, commercial, tourism, education, engineering and infrastructure sectors. 

We take a long-term approach to our business and work hard to create sustainable outcomes for our people, our clients and the communities we work in. Our people pride themselves on their vision and ability to find a better way of doing things. When others say it can’t be done we look for innovative solutions and new ways of working.

For more information visit the Multiplex website - www.multiplex.global.

 

The Project

Maitland Hospital is a district hospital, working with surrounding hospitals and community based services across the Hunter Valley to meet resident’s health needs.  Maitland Hospital is linked with Kurri Kurri and Cessnock Hospitals to optimise existing capacity across medical, surgical and maternity services.  As all Hunter New England Health (HNE Health) services work as a network, residents of Maitland and surrounds also access hospitals and health services in Newcastle. 

The New Maitland Hospital will provide the infrastructure required to adequately meet the anticipated growth in demand and enhance an integrated patient journey from acute, subacute and ambulatory care services. The key priorities for the delivery of services are:

  • Deliver effective and safe care
  • Make good use of available resources; and
  • Drive patient and carer experience.

The New Maitland Hospital will provide a range of health services to residents of the Hunter Valley region. Services at the New Maitland Hospital will complement the range of services already provided at other health care facilities in the area

As part of Multiplex's commitment to the Hunter economy and community, locally based contractors are encouraged to register their interest in upcoming opportunities for project work packages.

It is advised that the National Construction Code 2016 will apply to this project. Suppliers involved in the delivery of this project must be compliant with the conditions of the Code.

 

Local Industry Briefing

Multiplex, supported by various Hunter business associations are kindly inviting local SMEs to attend New Maitland Hospital Industry Briefing to be held:

Date:                     16 November 2018

Time:                     10am start - 12.30pm finish

Venue:                  Club Maitland City, 14 Arthur Street, Rutherford NSW 2320


To register Industry Briefing attendance please click here

Due to expected considerable interest, please do not register more than two attendees per a company.

 

More information about the project you can find here:

 

Expressions of Interest

Information regarding upcoming supply opportunities will be communicated on our ICN Gateway project page as it becomes available. Product, service and equipment suppliers who possess the capability, capacity and track record to perform the stated scope of work and are interested in supplying to the project are encouraged to submit an expression of interest (EOI) through the ICN Gateway.

 

How to register an Expression of Interest

  • Work Packages currently available to submit an EOI for are listed below.
  • To submit an initial EOI for the Work Scopes, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

            This is an initial, generic EOI submission only. 

 

 ICN Gateway Company Registration

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance is available through the web links listed below and attached guidance.
  • Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI- please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

 



SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   01. BUILDERS WORKS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Loading Platforms1 Nov 1831 Dec 18 
Supply loading platforms for hire to suit MPX requirements.
Plant and Equipment1 Nov 1831 Dec 18 
Dry hire of multiple plant including material handling equipment, access and the like.
Scaffolding 1 Nov 1831 Dec 18 
Erect all scaffolds and associated items in accordance with all applicable regulations completed with kickboards, handrails, ladders, mesh etc to the satisfaction of MPX and the Building Code.
STATUS   02. SERVICES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Electrical 1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply, installation, and certification of Electrical Services.
Fire (wet and dry) 1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply, installation, and certification of Wet and Dry Fire Services.
High voltage 1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply of labour, equipment and materials to complete HV works. Subcontractor must have ASP1 certification.
Hydraulics 1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply, installation, and certification of Hydraulic Services.
Mechanical 1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply, installation, and certification of Mechanical Services.
Medical Gases1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply, installation, and certification of Medical Gas Services.
Security and Audio Visual1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply, installation, and certification of Security and Audio Visual Services.
Vertical Transport1 Nov 1831 Dec 18 
Design & construct subcontract agreement, including the preparation and submission of samples, engineering and technical advice, design documentation, and the supply, installation, and certification of Vertical Transport Services.
STATUS   03. STRUCTURE    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Concrete supply and place 1 Nov 1831 Dec 18 
Supply and place concrete all in accordance with drawings, specifications and contract documents.
Formwork 1 Nov 1831 Dec 18 
Supply and install formwork including the erection, certification, dismantle, removal and the like in accordance with drawings, specifications and contract documents.
Post Tensioning1 Nov 1831 Dec 18 
Design and certify the Post Tensioning works for the structural concrete slabs, beams, ramps, dowel bars, tower crane penetrations and other structural requirements in accordance with drawings, specifications and contract documents.
Reinforcement install 1 Nov 1831 Dec 18 
Provide labour to fix reinforcement to footings, slab on ground, reinforced columns, cores, walls, stairs, post tensioned slabs, reinforced slabs, plinths and hobs in accordance with the drawings and specifications.
Reinforcement supply 1 Nov 1831 Dec 18 
Schedule reinforcement in accordance with the contract drawings, specifications, and the instructions given to the Subcontractor by Multiplex in regard to construction sequence and programming. The subcontractor shall provide all bars and mesh reinforcement duly cut, bent, bundled and correctly tagged when delivered to site.
Structural Steel1 Nov 1831 Dec 18 
Supply and install structural steel in accordance with the project drawings and specifications and all Standards and Building Codes relevant to the trade \\nWorks.\\n
STATUS   04. EXTERNAL WORKS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Cladding 1 Nov 1831 Dec 18 
Supply and install external cladding all in accordance with drawings, specifications and contract documents.
Glazing and curtain wall1 Nov 1831 Dec 18 
Supply and install glazing and curtain walls all in accordance with drawings, specifications and contract documents.
Landscaping1 Nov 1831 Dec 18 
Supply and install all landscaping materials and works in accordance with drawings, specifications and contract documents.
Louvres1 Nov 1831 Dec 18 
Supply and install external louvres all in accordance with drawings, specifications and contract documents.
Masonry 1 Nov 1831 Dec 18 
Supply and install brick and blockwork all in accordance with drawings, specifications and contract documents.
Roofing1 Nov 1831 Dec 18 
Supply and install roofing all in accordance with drawings, specifications and contract documents.
STATUS   05. FITOUTS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Auto Doors1 Nov 1831 Dec 18 
Supply and install Auto Doors in accordance with drawings, specifications and contract documents.
Clean Room1 Nov 1831 Dec 18 
Supply and install all necessary materials and equipment required to complete fitout of hospital clean rooms in accordance with drawings, Health specifications and contract documents.
Commercial Kitchen Fitout1 Nov 1831 Dec 18 
Supply and install all necessary materials and equipment to complete fitout of commercial kitchens in accordance with drawings, specifications and contract documents.
Doors Door Frames and Hardware1 Nov 1831 Dec 18 
Supply and install Door Frames in accordance with drawings, specifications and contract documents.
Joinery1 Nov 1831 Dec 18 
Supply and install joinery in accordance with drawings, specifications and contract documents.
Master Keying1 Nov 1831 Dec 18 
Supply and install master keying including door cylinders and keys and the like in accordance with drawings, specifications and contract documents.
Medical Fitout1 Nov 1831 Dec 18 
Supply and install all medical equipment to medical imaging theatres, operating rooms and the like in accordance with drawings, specifications and contract documents.
Operable Wall1 Nov 1831 Dec 18 
Supply and install operable walls in accordance with drawings, specifications and contract documents.
Partition and ceilings 1 Nov 1831 Dec 18 
Supply and install all partition walls, ceilings, column claddings, etc all in accordance with drawings, specifications and contract documents.
Radiation Wall and Shielding1 Nov 1831 Dec 18 
Supply and install radiation wall and shielding in accordance with drawings, specifications and contract documents.
Toilet Partitions1 Nov 1831 Dec 18 
Supply and install toilet partitions in accordance with drawings, specifications and contract documents.
Under Slab Insulation1 Nov 1831 Dec 18 
Supply and install under slab insulation in accordance with drawings, specifications and contract documents.
Window Coverings1 Nov 1831 Dec 18 
Supply and install internal window coverings in accordance with drawings, specifications and contract documents.
STATUS   06. FINISHES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Carpet and Resilient Flooring 1 Nov 1823 Dec 18 
Supply and install carpet and resilient flooring finishes all in accordance with drawings, specifications and contract documents.
Cement Render1 Nov 1831 Dec 18 
Supply and install external cement render in accordance with drawings, specifications and contract documents.
Painting1 Nov 1831 Dec 18 
Supply and install all painting types in accordance with drawings, specifications and contract documents.
Tiling 1 Nov 1831 Dec 18 
Supply and install tiling works all in accordance with drawings, specifications and contract documents.
Waterproofing1 Nov 1831 Dec 18 
Supply and install all waterproofing, epoxy and sealers and the like in accordance with drawings, specifications and contract documents.
STATUS   07. ADDITIONAL TRADES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Carpark fit out 1 Nov 1831 Dec 18 
Supply and install sealer, linemarking, bump rails and speed humps and the like in accordance with drawings, specifications and contract documents.
Carpentry1 Nov 1831 Dec 18 
Supply and install carpentry works in accordance with drawings, specifications and contract documents.
FFE supply and install 1 Nov 1831 Dec 18 
Supply and install FF&E in accordance with drawings, specifications and contract documents.
Garbage Compactors1 Nov 1831 Dec 18 
Supply and install all garbage compactors in accordance with drawings, specifications and contract documents.
Glazed Balustrades1 Nov 1831 Dec 18 
Supply and install glazed balustrades in accordance with drawings, specifications and contract documents.
Metalwork- General (galvanized and misc items) 1 Nov 1831 Dec 18 
Supply and install galvanized metalwork in accordance with drawings, specifications and contract documents.
Metalwork- Stainless Steel1 Nov 1831 Dec 18 
Supply and install all stainless steel skirtings, bump rails and the like in accordance with drawings, specifications and contract documents.
Roller shutters1 Nov 1831 Dec 18 
Supply and install roller shutters in accordance with drawings, specifications and contract documents.
Signage and wayfinding 1 Nov 1831 Dec 18 
Supply and install of external and internal signage and graphics and all associated works including external facade signage, wayfinding signage and statutory signage and the like.