Eliwana Project



Contact Details


  Linus O'Brien
  (08) 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: Project Execution Phase
  Project Owner FMG SOLOMON PTY LTD

Project Details


Project Overview:

 

FMG Solomon, a subsidiary of Fortescue Metals Group, will develop the Eliwana Project, following board approval in May 2018.

 

The Eliwana Project is for the development of a new mine and associated infrastructure at Fortescue’s Eliwana Site, which is approximately 90km west of the town of Tom Price in Western Australia’s Pilbara region.  The Eliwana Project will extend Fortescue’s existing iron ore mine sites of Cloudbreak, Christmas Creek and Solomon, and sustain production from existing deposits (particularly Kings and Firetail deposits).  Production is forecast to commence in December 2020. 

 

Fortescue is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the Industry Capability Network of Western Australian (ICNWA) Gateway.   

 

Scope Overview:

 

The Eliwana Project will require the establishment of:

  • a new ore processing facility with capacity up to 30 million tonnes per annum;
  • non-process infrastructure such as camps, telecommunications networks, electricity, water, sewage and wastewater facilities; and 
  • 143 km of new rail infrastructure which will connect with Fortescue’s existing Hamersley line to Port Hedland.

 

Subject to further investigations, the Eliwana Project may also include an airstrip/airport at the Eliwana Site, a passing loop on Fortescue’s existing Solomon rail spur and/or additional rolling stock. 

 

Indicative Timeline:

Preliminary enabling works commencing September 2018.

Earthworks scheduled for February 2019.

Main Mine and process facility construction works scheduled for December 2019.

 

Local and Indigenous participation:           

In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for Eliwana Project tendering opportunities.

SHOW LESS

Associated Opportunities


SHOW MORE

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Mine Communications Network17 May 1921 Jun 1921 Jun 19
Please review the scope of works document for details of the package.
NPI Facilities24 May 1921 Jun 1921 Jun 19
Please refer to the scope of works document for information on the package
Mine Fleet - Supporting Equipment27 May 1925 Jun 1925 Jun 19
Please refer to scope of works document for details of the package
WASTE WATER TREATMENT PLANT Eliwana Village 

Full scope has been awarded to:

WASTE WATER SERVICES PTY LTD

28 Juna Drive
MALAGA, WA
Australia 6090
Phone: +61 8 9241 9100
Fax: +61 8 9248 6117
Email: jerry@wastewaterservices.com.au
Web: www.wastewaterservices.com.au

General Enquiries & Work Related Enquiries please contact:-
Neil Wende on:-
Phone: (61) 8 9241 9100
Email: sales@wwsperth.com.au
GYRATORY CRUSHER supply 

Full scope has been awarded to:

Contact

Contact Person: Ken Burson
Email: ken.burson@metso.com
Telephone: 61 8 9420 5878
Mobile: 61 0419 920 034

METSO MINERALS (AUSTRALIA) LIMITED

Level 2, 1110 Hay Street
WEST PERTH, WA
Australia 6005
Phone: +61 8 9420 5524
Fax: +61 8 9320 2500
Email: rakesh.ganjoo@metso.com
Web: www.metso.com

See Scope attached for full details
Supply of Sampling Equipment 

Full scope has been awarded to:

consep

Awarded to: Consep Pty Limited
Contact for Sub-contracting opportunities:
Name: Chris Nowak
Position: Project Engineer
Phone Number: (02) 9756 5299
Email Address: cnowak@consep.com.au

Contact for Employment opportunities:
Name: Alex Vo
Position: Mechanical Engineer
Phone Number: (08) 9477 6777
Email Address: avo@consep.com.au

Supply of stockpiling and out loading sampling equipment including linear
primary crosscut samplers, sample feeders, linear secondary crosscut
samplers, rotary sample collectors, conveyors, chutes, hoppers and diverter
gates.
Cone Crushers 

Full scope has been awarded to:

Sub Contracting Opportunities

Contact Person: Ken Burson
Email: ken.burson@metso.com
Telephone: 61 8 9420 5878
Mobile: 61 0419 920 034

METSO MINERALS (AUSTRALIA) LIMITED

Level 2, 1110 Hay Street
WEST PERTH, WA
Australia 6005
Phone: +61 8 9420 5524
Fax: +61 8 9320 2500
Email: rakesh.ganjoo@metso.com
Web: www.metso.com

See scope for full details
HYBRID FEEDERS supply 

Full scope has been awarded to:

Transmin Australia Pty Ltd

Contact person name: David Cleghorn, Head of Project Management
Contact person phone number: +61 0 429 795 237
Contact person email address: david.cleghorn@transmin.com.au

Supply is for two
(2) Hybrid Feeders for primary crushing discharge,
Secondary Sizers 

Full scope has been awarded to:

Magdeburger Foerderanlagen und Baumaschinen trading as FAM GmbH

Contact person name: Peter Laird, FAM Business Development (Australasia)
Contact person phone number : +61 0 437 359 321
Contact person email address: peter.laird@FAM-Australia.com.au

Supply of Sizers
Vibrating Feeders 

Full scope has been awarded to:

Employment Opportunities

Name: Tony Welch
Phone Number: 08 9259 8314
Email Address: tony.welch@joest.com.au
Address: 70 - 72 Sheffield Road, Welshpool WA 6106

Joest Australia Pty Ltd

Contact person name: Steve Clifford, General Manager - Engineering
Contact person phone number : +61 0 438 291 181
Contact person email address: steve.clifford@joest.com.au

Subcontracting Opportunities

Name: Stephen Clifford
Phone Number: 08 9259 8308
Email Address: steve.clifford@joest.com.au

Supply of Vibrating Feeders and Vibrating Screens
Combined Stacker Reclaimer 

Full scope has been awarded to:

DALIAN HUARUI HEAVY INDUSTRY (AUSTRALIA)

1 Marshall Street
Mosman Park, WA
Australia 6012
Email: licb@dhidcw.com
Web: http://www.dhhi.com.cn/

For Employment Opportunities

Harald Grosshammer
Montan Engineering Pty Ltd
Mobile: +61 408 903 520
E-mail: harald.grosshammer@montaneng.com

For Sub-contracting opportunities

Name: Ms Pan Lingzhuo
Position: Project Manager
Phone Number: +86 411 86852394
Email Address: panlz@dhidcw.com
Address: 1 MARSHALL STREET , MOSMAN PARK WA 6012

See scope for full details
POTABLE WATER TREATMENT PLANT 

Full scope has been awarded to:

WASTE WATER SERVICES PTY LTD

28 Juna Drive
MALAGA, WA
Australia 6090
Phone: +61 8 9241 9100
Fax: +61 8 9248 6117
Email: jerry@wastewaterservices.com.au
Web: www.wastewaterservices.com.au

General Enquiries & Work Related Enquiries please contact:-
Neil Wende on:-
Phone: (61) 8 9241 9100
Email: sales@wwsperth.com.au
ELIWANA BULK EARTHWORKS AND ROADS21 Aug 1831 Aug 1831 Aug 18
Earthworks and Roads and Drainage
Rail Camp 50 and 9524 Aug 1814 Sep 1814 Sep 18
Design and Construction of two (2) rail camps. Rail Camp 50 with 300 rooms and Rail Camp 95 with 500 rooms. The scope of works includes the supply, installation, hire and demobilisation of:
. all amenities, infrastructure and central services; and
. installation only of FMG supplied accommodation units.
BRIDGE CONTRACTOR24 Aug 1817 Sep 1817 Sep 18
Bridge contractor to construct two bridges, 64M and 228M.
Bridge Grider Supply24 Aug 1817 Sep 1817 Sep 18
Shop detailing, steel supply, fabrication, surface treatment, transport, delivery and unloading at the site of 16 No Modular Bridge Girders.
Apron Feeder23 Aug 1821 Sep 1821 Sep 18
Design, fabrication, assembly, surface treatment, testing and delivery of one
(1) Apron Feeder.
Belt Feeders23 Aug 1821 Sep 1821 Sep 18
Supply for three (3) belt feeders.
Double Deck Vibrating Screens23 Aug 1821 Sep 1821 Sep 18
Supply for two (2) double deck scalping vibrating screens and three (3) double deck product screens.
POWER GENERATION Eliwana Village23 Aug 1821 Sep 1821 Sep 18
Design and Construction of a 3Megawatt Power Station for the\
Eliwana Village,
Train Loadout System28 Aug 1822 Sep 1822 Sep 18
Supply and delivery of one (1) TLO inclusive of a single clam shell, weigh bridge and control room.
Reinforced Concrete Box Culverts4 Sep 1830 Sep 1830 Sep 18
Supply of all materials and manufacture of the reinforced concrete box culverts RCBCs are 3600mm wide by 1200mm high by 1200mm long - 100 Units Precast concrete link slabs to suit the above RCBCs and have a 3600mm wide by 1200mm high by 1200mm long opening - 90 Units
Dust Collection System10 Sep 184 Oct 184 Oct 18
The Dust Collection system will consist of a centrally located filtration unit with ducting to the top of three (3) storage bins, to the feed end of three (3) cone crushers and three collection point below the cone crushers
RAILWAY BALLAST SUPPLY AND DELIVERY21 Aug 1810 Sep 1810 Oct 18
Supply and deliver 425,000 tonnes of 63 mm Class H railway ballast
Construction Communications18 Sep 1819 Oct 1819 Oct 18
Microwave backhaul design and supply, TETRA coverage, Sepura TETRA terminal supply and other works
RAIL COMMUNICATIONS18 Sep 1819 Oct 1819 Oct 18
DESIGN, SPPLY/MANUFACTURE, DELIVER, INSTALL AND COMMISSION RAIL COMMUNICATION SYSTEMS
Eliwana Early Mining Fleet Maintenance and NPI28 Sep 1826 Oct 1826 Oct 18
Refer to Scope of Works document for full package detail.
Conveyor Drives17 Oct 1827 Oct 1827 Oct 18
Design, fabrication, assembly, surface treatment, testing and delivery of seventeen (17) Conveyor Drives ranging in size from 132 kW to 710kW, with ten (10) at 400V, and seven (7) at 690V.
EARTHWORKS ELIWANA RAIL - 20 to 143km18 Sep 1831 Oct 1831 Oct 18
RAILWAY EARTHWORKS, ROADWORKS AND
DRAINAGE WORKS 20-143KM
Tramp Metal Magnets26 Oct 185 Nov 185 Nov 18
Supply of Five (5) Tramp Metal Magnets
LOW VOLTAGE SWITCHROOMS16 Oct 188 Nov 188 Nov 18
Supply of 7 x 415V and 690V switchrooms
HIGH VOLTAGE SWITCHROOMS16 Oct 189 Nov 189 Nov 18
Supply of 2 x 33kV switchrooms
Grade Control Reverse Circulation Drilling 23 Oct 1820 Nov 1820 Nov 18
please refer to scope of works for the description of the package.
Primary Crushing and Ore Processing Facility30 Oct 1822 Nov 1822 Nov 18
Construction of the 30Mtpa Ore processing Facility consisting of: . primary crushing facility; . secondary crushing and screening building; . tertiary crushing building; and . plant conveyors.
Diesel Power Generation6 Nov 1823 Nov 1823 Nov 18
Please refer to the scope of works document for package details
Stockyard and Overland Conveyor Construction18 Oct 1823 Nov 1823 Nov 18
Please refer to the Scope of Works for a detailed description of the package
Train Loadout Facility and Train Loadout Conveyor Construction18 Oct 1823 Nov 1823 Nov 18
Construction of Train Load Bin and Conveyor
LOW VOLTAGE VARIABLE SPEED DRIVES 31 Oct 1826 Nov 1826 Nov 18
Please refer to Scope of Works document for details on the package
Transformers24 Aug 187 Jan 197 Jan 19
Scope of this package covers the supply of Transformers for the entire project.\\\
Which includes:\\\
8 x 33kV to 415V Transformers (1-2.5MVA); and\\\
5 x 33kV to 690V Transformers (1-3MVA)
Bulk Earthworks for Processing Plant and Non-Process Infrastructure23 Oct 181 Feb 191 Feb 19
Please refer to scope of works doc. for more detail
Power Distribution 33kV17 Jan 1914 Feb 1914 Feb 19
please refer to scope of works document for details of the package
Concrete Batch Plant4 Feb 1928 Feb 1928 Feb 19
Please refer to teh scope of works document for details of the package
Welding Yard Upgrade Eliwana Rail15 Mar 1929 Mar 1929 Mar 19
Please refer to scope of works document for details of the scope of works
Construction of ANFO and Explosives Facilities13 Mar 1919 Apr 1919 Apr 19
Please refer to the scope of works document for details of the package
Design and Construction of Laboratory Building1 Mar 1919 Apr 1919 Apr 19
Please refer to the scope of works document for details of the package
Installation of Automated Robotic Laboratory Equipment1 Mar 1919 Apr 1919 Apr 19
Please refer to the scope of works document for details of the package
Trackworks4 Apr 191 May 191 May 19
Please review the scope of works document for details of the package.
Field Installation of Wayside Signalling Asset Protection and Level Crossing Systems5 Apr 193 May 193 May 19
Please review the scope of works document for details of the package.
Fibre Optic Cable4 Apr 198 May 198 May 19
Please review the scope of works document for details of the package.
Ore Car Supply15 Apr 1910 May 1910 May 19
Please refer to the scope of works document for details of the package
Mine Fleet10 May 1910 Jun 1910 Jun 19
Please review the scope of works document for details of the package.