The closing date for this project has been reached.
For your information, the following similar projects are still available on Gateway:
Barossa Gas Export Pipeline EPCI (Allseas)
As part of the Barossa development, Allseas will be responsible for installing the offshore rigid gas export pipeline and associated end structures (PLETs), as well as mattresses f..
Barossa Offshore
Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture, which comprises Santos Offshore Pty Ltd (Santos) as Operator and SK E&S Austr..
Bayu-Undan Carbon Capture and Storage
The Bayu-Undan Carbon Capture and Storage (CCS) Project targets the capture of up to 10 Mtpa of CO2 at a Darwin hub - initially from the Darwin LNG facility (DLNG), with potential ..
Darwin LNG Life Extension Project
The Darwin LNG plant (DLNG) is a single train liquefaction and storage facility located at Wickham Point on Darwin Harbour, Northern Territory, Australia. DLNG currently receives g..
Dorado Development
The Dorado oil field contains 140 mmbbls (2C, 100%) of oil. It is located in the Bedout basin, approximately 150km north of Port Hedland in Petroleum permit WA-437-P. The project w..
Narrabri Gas Project
The Narrabri Gas Project involves the production of natural gas through the progressive development of up to 850 wells connected into processing facilities south of Narrabri at Lee..
WA Upstream Operations
A proudly Australian Company, Santos is the biggest producer of domestic gas in Western Australia and has been operating in the west since its first oshore discovery, in the Carnar..