Osborne Naval Shipbuilding Precinct (Future Subs Program) Infrastructure Development



Contact Details


  Jeff Camburn, ICN SA
  +61 8 8303 2054
 CONTACT EMAIL

  Eddie Ivar, ICN SA
  +61 8 8226 3011
 CONTACT EMAIL

  Locations: SA Australia
  Project Value: TBC
  Project Status: Design Phase
  Project Owner Laing O'Rourke Australia Construction Pty Ltd

Project Details


The Osborne Naval Shipbuilding Precinct (Future Submarine Program) (ONSP(FSP)) Infrastructure Development will provide the necessary build, test, and integration facilities (BTIFI) to design, produce and accept into service a fleet of future submarines (FSM). The project is part of the Commonwealth Government's Naval Shipbuilding Plan announced in May 2017 which sets out the strategic approach to building a long-term, sustainable naval shipbuilding and ship sustainment capability in Australia.


Laing O’Rourke has been awarded the Managing Contractor role for this large scale project and is now requesting Registrations of Interest (ROI) from trade subcontractors interested in participating in this exciting South Australian Project. Delivery Phase works are scheduled to commence in Q1 2019 and be completed in 2026.


The proposed scope of works includes the following:


New building works include:

•    Production Workshops

•    Platform Land Based Test Facility (PLBTF)

•    Combat System Physical Integration Facility (CSPIF)

•    Paint workshops

•    Raft workshop

•    Warehousing

•    Wharf support buildings

•    Shipyard maintenance and utility building

•    Canteen and amenities

•    FSP building

•    On-grade car park and pedestrian bridge over rail


Civil and marine infrastructure includes:

•    Piling, bulk earthworks, roads, aprons and hardstands

•    Wharf upgrades/extensions

•    Power, water, electrical, security and communications infrastructure.


Building refurbishment includes:

Refurbishment of existing buildings


PROJECT UPDATE

Following the development of the Phase 1 design, the Osborne North Development Project is continuing to progress well towards construction.  In August 2019 will be starting our site establishment activities and by the end of 2019 we will have commenced our first permanent works.

 

Within the next two months we will be issuing expressions of interest for the Phase 1 Delivery Packages, which will commence on site in Q1 2020.  Please continue to review the ICN portal for sight of these opportunities.

 

Procurement of the Phase 2 scope is also in our sights, and we are focusing upon the services that we require during the planning (design) phase for those works, including early supply chain engagement for key trade works where input into the design process is required.  We will provide more detail on Phase 2 requirements in a further Industry Briefing later this year.

 

We will hold a series of Supply Chain Safety Forums as we progress, to share the Laing O’Rourke safety ethos and behaviours, as well as some of our project objectives with potential supply chain partners on the project.  These Forums will target trades due to be procured and mobilised at that time.  The first will target earthworks, civils and structural trades, and will take place on 29 August 2019. More information will be issued through the ICN Portal in due course.   

 

We look forward to engaging with you on the Osborne North Future Submarine Project.  If you require any further information please continue to view the ICN portal or contact us on FSPID.Osborne@laingorourke.com.au


SHOW LESS

Project Documents


Industry Briefing 14 March 2019

  ▲ CONTRACT
FSP Industry Briefing 140319 Presentation 3
ICN Presentation
SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   01 PHASE 1 EXPRESSION OF INTEREST    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
WP-P1DP-0044 Sliding Roof21 Feb 202014 Apr 2020 
The project requires an engineering Subcontractor to carry out the detailed design, manufacture, install, test and commissioning of the mechanically operated roof including motors, rails and controls.
WP76 Formwork Reinforcement and Pour 
Expression of Interest for FRP requirement for Phase 1.
WP-P1D-0045 Precast Concrete Supply and Install 
Expression of Interest for Precast Concrete Supply and Install requirements for Phase 1 of the build.
WP-P1DP-0040 Structural Steel 

Full scope has been awarded to:

SA STRUCTURAL PTY LTD

40-54 Kaurna Avenue
Edinburgh, SA
Australia 5111
Phone: +61 08 8285 5111
Fax: +61 08 8285 5122
Email: sastructural@sastructural.com.au
Web: www.sastructural.com.au

Expression of Interest for Structural Steel requirements for Phase 1 of the build.
Phase 1 Civil and Infrastructure Package27 Nov 201913 Dec 2019 
Works include heavy duty pavements, service roads, permanent car parks, footpaths, installation of external services (various), and hard landscape including bollards, bike racks and similar.

Package Information Brief available by clicking the Full Scope EOI icon.
Phase 1 Overhead Cranes (Including crane rails) and Knuckle Boom Crane12 Dec 201917 Jan 2020 
The design, manufacture, supply, installation and commissioning of varied overhead and knuckle boom cranes.
Phase 1 Site Logistics Package27 Nov 201920 Dec 2019 
The scope of this package includes the delivery of onsite logistics services for Phase 1 of the Project.
The scope of services will include the provision of labour and supervision, small tools & plant, and materials to co-ordinate and manage access, materials movement, waste clearance, temporary site services.

Package Information Brief available by clicking the Full Scope EOI icon.
WP-P1D-0027 Passenger and Goods Lift21 Feb 202002 Apr 2020 
Design, manufacture, install, test and commissioning of up to 5no. passenger and goods lifts for Phase 1 of the Project.
WP-P1D-0047 Glazing Supply and Install21 Jan 202013 Mar 2020 
Glazing Supply and Install EOI
WP-P1D-0057 Mechanical Installations04 Feb 202006 Apr 2020 
EOI for the Osborne North Infrastructure project for Mechanical Installations
WP-P1D-0081 HV Switchgear04 Feb 202021 Feb 2020 
EOI for HV Switchgear for Phase 1 of the Osborne Infrastructure project.
WP-P1D-02 Logistics-Electrical Temporary Services18 Feb 202013 Mar 2020 
Subcontract for Temporary power supply for Construction Site and distribution of mains
power for trades.
WP-P1DP-0046 Roller Shutters Industrial Doors Supply and Installation21 Feb 202002 Apr 2020 
The manufacture, supply and installation of 20-25 roller shutter industrial doors of various sizes.
WP-P1DP-0056 Electrical21 Feb 202020 Mar 2020 
Electrical installation including communication systems, to 3no buildings within Phase 1 of the Project.
WP-P1DP-0060 Wet and Dry Fire21 Feb 202011 Mar 2020 
Wet and dry fire protection systems installation to 3 buildings within Phase 1 of the Project.
WP-P1DP-0097 Plumbing and Hydraulics20 Mar 202003 Apr 2020 
Supply and installation of all sanitary plumbing and drainage, metering, potable cold water, potable hot water, rainwater, and natural gas supply for building within Phase 1.
In completing the scope of works, the Contractor shall be responsible for but not limited to:
- All labour
- Design (where required)
- Material
- Transport
- Cranage
- Submissions to authorities prior to commencement of the works
- The supply and fixing of all necessary equipment and components for the complete installation
WP-P1DP-0106 Minor Civil Works20 Mar 202003 Apr 2020 
The scope of this package shall include minor civil works for non-permanent work for the project. (This may be in the form of a 'call off' agreement or a panel contract).
The works may include small to medium earth or material transfer and removal, trenching for drainage and services, service and grading of unsurfaced roads, temporary footpaths and access routes.
STATUS   01 PHASE 2 EXPRESSION OF INTEREST    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
WP-P2ISW-0010 Site Accommodation06 Apr 202021 Apr 2020 
Additional site accommodation to connect onto already installed buildings to facilitate an increase in site personnel.
Tender lists for Phase 2 will be produced from the assessment of responses to this EOI.
WP-P2ISW-0001 Civils and Earthworks11 Mar 202027 Mar 2020 
Phase 2 Civils & Earthworks - Initial Site Works (ISW) - The subcontract is for site clearance, construction of a piling mat, temporary and permanent paving, logistics lay-down areas, site roads and pathways, fencing and gates, and the construction of a Common Service Trench.
WP-P2ISW-0007 Formwork Reinforcement and Pour (FRP)11 Mar 202027 Mar 2020 
The subcontract is for FRP works included in the Phase 2 Initial Site Works scope.
STATUS   02 REGISTRATION OF INTEREST    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
01 Access Floors - ROI19 Nov 201830 Jun 2020 
Access Floors
02 Acoustic Insulation - ROI19 Nov 201830 Jun 2020 
Acoustic Insulation
03 Asbestos Removal - ROI19 Nov 201830 Jun 2020 
Asbestos Removal
04 Blinds - ROI19 Nov 201830 Jun 2020 
Blinds
05 Building Materials - ROI19 Nov 201830 Jun 2020 
Building Materials
06 Carpentry (Doors/Frames/Hardware) - ROI19 Nov 201830 Jun 2020 
Carpentry (Doors/Frames/Hardware)
07 Civil and Infrastructure Works - ROI19 Nov 201830 Jun 2020 
Civil & Infrastructure Works
08 Cleaning - ROI19 Nov 201830 Jun 2020 
Cleaning
09 Communications and Data - ROI19 Nov 201830 Jun 2020 
Communications and Data
10 Concrete Supply - ROI19 Nov 201830 Jun 2020 
Concrete Supply
11 Concrete Place - ROI19 Nov 201830 Jun 2020 
Concrete Place
12 Crane Hire - ROI19 Nov 201830 Jun 2020 
Crane Hire
13 Demolition - ROI19 Nov 201830 Jun 2020 
Demolition
14 Electrical (HV) - ROI19 Nov 201830 Jun 2020 
Electrical (HV)
15 Electrical Services (LV) - ROI19 Nov 201830 Jun 2020 
Electrical Services (LV)
16 Epoxy Floor Coatings - ROI19 Nov 201830 Jun 2020 
Epoxy Floor Coatings
17 External Facade Cladding - ROI19 Nov 201830 Jun 2020 
External Facade Cladding
18 Fencing - ROI19 Nov 201830 Jun 2020 
Fencing
19 Fire Doors - ROI19 Nov 201830 Jun 2020 
Fire Doors
20 Fire Services - ROI19 Nov 201830 Jun 2020 
Fire Services
21 Floor Coverings - ROI19 Nov 201830 Jun 2020 
Floor Coverings
22 Formwork - ROI19 Nov 201830 Jun 2020 
Formwork
23 Furniture Fittings and Equipment - ROI19 Nov 201830 Jun 2020 
Furniture, Fittings and Equipment
24 Gantry Cranes - ROI19 Nov 201830 Jun 2020 
Gantry Cranes
25 Hydraulic Services - ROI19 Nov 201830 Jun 2020 
Hydraulic Services
26 Joinery - ROI19 Nov 201830 Jun 2020 
Joinery
27 Kitchen Equipment - ROI19 Nov 201830 Jun 2020 
Kitchen Equipment
28 Labour Hire - ROI19 Nov 201830 Jun 2020 
Labour Hire
29 Landscaping (Hard) - ROI19 Nov 201830 Jun 2020 
Landscaping (Hard)
30 Landscaping (Soft) - ROI19 Nov 201830 Jun 2020 
Landscaping (Soft)
31 Lifts - ROI19 Nov 201830 Jun 2020 
Lifts
32 Linemarking - ROI19 Nov 201830 Jun 2020 
Linemarking
33 Louvres - ROI19 Nov 201830 Jun 2020 
Louvres
34 Masonry - ROI19 Nov 201830 Jun 2020 
Masonry
35 Masterkeying - ROI19 Nov 201830 Jun 2020 
Masterkeying
36 Mechanical Services - ROI19 Nov 201830 Jun 2020 
Mechanical Services
37 Metal Wall Cladding - ROI19 Nov 201830 Jun 2020 
Metal Wall Cladding
38 Metalwork - ROI19 Nov 201830 Jun 2020 
Metalwork
39 Operable Walls - ROI19 Nov 201830 Jun 2020 
Operable Walls
40 Painting - ROI19 Nov 201830 Jun 2020 
Painting
41 Paint Booth (Industrial) - ROI19 Nov 201830 Jun 2020 
Paint Booth (Industrial)
42 Panel Lift Doors (Industrial) - ROI19 Nov 201830 Jun 2020 
Panel Lift Doors (Industrial)
43 Partitions and Ceilings - ROI19 Nov 201830 Jun 2020 
Partitions and Ceilings
44 Piling - ROI19 Nov 201830 Jun 2020 
Piling
45 Plant hire - ROI19 Nov 201830 Jun 2020 
Plant Hire
46 Plastering - ROI19 Nov 201830 Jun 2020 
Plastering
47 Precast Concrete - ROI19 Nov 201830 Jun 2020 
Precast Concrete
48 Reinforcement (Fixing) - ROI19 Nov 201830 Jun 2020 
Reinforcement (Fixing)
49 Reinforcement (Supply) - ROI19 Nov 201830 Jun 2020 
Reinforcement (Supply)
50 Roads and Carparks - ROI19 Nov 201830 Jun 2020 
Roads & Carparks
51 Roller Doors and Shutters - ROI19 Nov 201830 Jun 2020 
Roller Doors and Shutters
52 Roofing (Including Roof Safety Systems) - ROI19 Nov 201830 Jun 2020 
Roofing (Including Roof Safety Systems)
53 Scaffolding - ROI19 Nov 201830 Jun 2020 
Scaffolding
54 Security Services (Guards) - ROI19 Nov 201830 Jun 2020 
Security Services (Guards)
55 Security Systems - ROI19 Nov 201830 Jun 2020 
Security Systems
56 Services Identification - ROI19 Nov 201830 Jun 2020 
Services Identification
57 Sheet Piling - ROI19 Nov 201830 Jun 2020 
Sheet Piling
58 Signage - ROI19 Nov 201830 Jun 2020 
Signage
59 Small Tools - ROI19 Nov 201830 Jun 2020 
Small Tools
60 Stainless Steel - ROI19 Nov 201830 Jun 2020 
Stainless Steel
61 Structural Steel - ROI19 Nov 201830 Jun 2020 
Structural Steel
62 Survey - ROI19 Nov 201830 Jun 2020 
Survey
63 Temporary Fencing - ROI19 Nov 201830 Jun 2020 
Temporary Fencing
64 Temporary Buildings - ROI19 Nov 201830 Jun 2020 
Temporary Buildings
65 Temporary Electrical / Data - ROI19 Nov 201830 Jun 2020 
Temporary Electrical / Data
66 Temporary Hydraulics - ROI19 Nov 201830 Jun 2020 
Temporary Hydraulics
67 Tiling - ROI19 Nov 201830 Jun 2020 
Tiling
68 Waste Management (bins) - ROI19 Nov 201830 Jun 2020 
Waste Management (bins)
69 Waterproofing - ROI19 Nov 201830 Jun 2020 
Waterproofing
70 Windows and Glazing - ROI19 Nov 201830 Jun 2020 
Windows & Glazing
71 Workstations - ROI19 Nov 201830 Jun 2020 
Workstations
72 Modular Buildings (Complete Package) - ROI19 Nov 201830 Jun 2020 
Modular Buildings (Complete Package)
73 Long Span Pedestrian Bridge (Complete Package) - ROI19 Nov 201830 Jun 2020 
Long Span Pedestrian Bridge (Complete Package)
74 Wharf and Marine Works (Complete Package) - ROI19 Nov 201830 Jun 2020 
Wharf & Marine Works (Complete Package)
75 Building Refurbishment (Complete Package) - ROI19 Nov 201830 Jun 2020 
Building Refurbishment (Complete Package)
STATUS   03 INITIAL SITE WORKS EOI    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
WP-P1PP-0013 Site Survey 

Full scope has been awarded to:

FYFE PTY LTD

124 South Terrace
Level 1
Adelaide, SA
Australia 5000
Phone: +61 8 8201 9600
Fax: +61 08 8201 9650
Email: timothy.reynolds@fyfe.com.au
Web: www.fyfe.com.au

Expression of Interest for early works Site Surveying services, including Site Survey, Site Boundary and Set out points.
WP-P1PP-0017 Earthworks and Civils 

Full scope has been awarded to:

SHAMROCK CIVIL ENGINEERING PTY. LTD.

195 Cobalt Street
CAROLE PARK, QLD
Australia 4300
Phone: +61 07 3727 1100
Fax: +61 07 3879 4100
Email: estimating@shamrockcivil.com.au
Web: www.shamrockcivil.com.au

Expression of Interest for early works Earthworks and Civil's including Demolition and Grubbing, Earthworks, Service Diversions,Structural Fill, Dust Suppression and Utility Diversions and Capping.
WP-P1PP-0019 Precast Pilling 

Full scope has been awarded to:

KELLER PTY LTD

Suite G01-02, Ground Floor
2-4 Lyonpark Road
MACQUARIE PARK, NSW
Australia 2113
Phone: +61 02 8866 1155
Email: info@keller.com.au
Web: www.keller.com.au

Expression of Interest for Precast Pilling, including Precast yard, Casting of Precast Piles, Pile Testing and Piling to CSPIF building.
WP-P1PP-0020 Site Security 

Full scope has been awarded to:

AMA CORPORATE SERVICES PTY LTD

76 Unley Road
Unley, SA
Australia 5061
Email: courtney@amasecurity.com.au
Web: http://www.amasecurity.com.au/

Expression of Interest for Site Security including EIFY Turnstile access system, Security Guards and Gate Personnel.
WP-P1PP-0023 Construction Fencing 

Full scope has been awarded to:

FIELDQUIP

2 Mons Ave
EDWARDSTOWN, SA
Australia 5039
Phone: (008) 8293 2299
Fax: (008) 8293 2260
Email: sales@fieldquip.net
Web: www.fieldquip.net

Expression of Interest for Construction Fencing including Perimeter fencing to Phase 1 site, Access Gates and Shade Cloth.
WP-P1PP-0024 Waste Management 

Full scope has been awarded to:

Suez Recycling & Recovery

133 Cormack Road, Wingfield
SA, Australia 5013
Ph: +61 8 8345 7800
Email: david.muncaster@suez.com
Web: www.sita.com.au

Expressions of Interest for Waste Management, including Skips, Removal of Construction Waste, Removal of Office Waste and Contaminated Waste.
WP-P1PP-0021 Cleaning18 Apr 201903 May 201903 May 2019
Expression of Interest for Cleaning services including Office cleaning and Crib and Ablutions cleaning.
STATUS   04 MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Osborne Naval Shipbuilding Precinct (Future Submarines Program) Infrastructure Development - Any Opportunities19 Nov 201830 Jun 2020 
Express interest for any opportunities that may arise for this project.