Koodaideri Project

EPCM: Rio Tinto has appointed Worley Services Pty Ltd as the projects Engineering, Procurement, Construction Manager (EPCM). All major agreements will be with Rio Tinto directly.


Project Details  


The development of a new iron ore mine and associated rail infrastructure extending from the Koodaideri mine to Rio Tinto’s existing rail network. The project will include the following components;  


• A stockyard with associated stackers and reclaimer; 

• Train load-out facility; 

• A 220kV transmission line connecting to the Yandicoogina transmission line; 

• A 220/33kV switchyard; 

• Site control systems and communications, fire detection and security; 

• A bore field for water supply; 

• Non-process infrastructure (administration buildings, workshops, warehouse, explosive storage facility, vehicle wash and fuelling facilities); 

• A new airport; 

• Bridges;

•Access roads; 

• Accommodation village and temporary construction camps; 

• 170km of new railway including rail sidings and junctions; 

• Level crossings; 

• Rail maintenance track; radio base stations and fibre optic cabling; 

• Signalling, communications and asset protection system upgrades; and 

• Construction facilities such as laydown areas, haul roads, borrow pits, site offices and construction and potable water sources.   


It is a Rio Tinto requirement that standards utilised are either Australian or internationally recognised equivalents, unless otherwise justified due to specific technological, commercial, intellectual property or similar requirements. All requests for proposal (RFP), tender and contract document references will stipulate any standards requirements. In certain circumstances, materials specifications in RTPs may be met by using either Australian or internationally recognised standards. Otherwise it is the project’s intent that standards specified in RTPs do not seek to exclude Australian business from participating in Tier 1 supply opportunities.  


Delivery Schedule:  Subject to approval, construction of the Project will take approximately three years and provide employment for over 1,600 personnel (at peak). 


Project Documents 


Share this project on:

FB Twitter LinkedIn

Project at a glance


WA Australia (Onshore)
Construction of Project
RTA GOVE PTY LIMITED

Contact Details


Raymond Loh
Manager
+61 8 9365 7499

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status

Full Scope EOI

Closed: 
31 Aug 2018

Partial Scope EOI

Closed: 
31 Aug 2018
  Awarded

Full Scope EOI

Closed: 
20 Sep 2018

Partial Scope EOI

Closed: 
20 Sep 2018
  Awarded

Full Scope EOI

Closed: 
06 Oct 2018

Partial Scope EOI

Closed: 
06 Oct 2018
  Awarded

Full Scope EOI

Closed: 
06 Oct 2018

Partial Scope EOI

Closed: 
06 Oct 2018
  Awarded
AccordianPlus Chillers

Full Scope EOI

Closed: 
15 Oct 2018

Partial Scope EOI

Closed: 
15 Oct 2018
  Awarded
AccordianPlus Isolation Gates

Full Scope EOI

Closed: 
15 Oct 2018

Partial Scope EOI

Closed: 
15 Oct 2018
  Awarded
AccordianPlus Track Weigh Scales

Full Scope EOI

Closed: 
15 Oct 2018

Partial Scope EOI

Closed: 
15 Oct 2018
  Awarded
AccordianPlus Ballast Supply

Full Scope EOI

Closed: 
25 Oct 2018

Partial Scope EOI

Closed: 
25 Oct 2018
  Awarded
AccordianPlus Concrete Sleepers

Full Scope EOI

Closed: 
25 Oct 2018

Partial Scope EOI

Closed: 
25 Oct 2018
  Awarded
AccordianPlus Accommodation Camps

Full Scope EOI

Closed: 
26 Oct 2018

Partial Scope EOI

Closed: 
26 Oct 2018
  Awarded

Full Scope EOI

Closed: 
01 Nov 2018

Partial Scope EOI

Closed: 
01 Nov 2018
  Awarded
AccordianPlus 33kV Switchgear

Full Scope EOI

Closed: 
06 Nov 2018

Partial Scope EOI

Closed: 
06 Nov 2018
  Awarded
AccordianPlus Mine Prestrip

Full Scope EOI

Closed: 
16 Nov 2018

Partial Scope EOI

Closed: 
16 Nov 2018
  Awarded
AccordianPlus 6/6 kV Switchgear

Full Scope EOI

Closed: 
22 Nov 2018

Partial Scope EOI

Closed: 
22 Nov 2018
  Awarded
AccordianPlus Conveyor Drives

Full Scope EOI

Closed: 
22 Nov 2018

Partial Scope EOI

Closed: 
22 Nov 2018
  Awarded
AccordianPlus Conveyor Idlers

Full Scope EOI

Closed: 
22 Nov 2018

Partial Scope EOI

Closed: 
22 Nov 2018
  Awarded
AccordianPlus Conveyor Pulleys

Full Scope EOI

Closed: 
22 Nov 2018

Partial Scope EOI

Closed: 
22 Nov 2018
  Awarded

Full Scope EOI

Closed: 
22 Nov 2018

Partial Scope EOI

Closed: 
22 Nov 2018
  Awarded
AccordianPlus Mine - Shop Detailing

Full Scope EOI

Closed: 
22 Nov 2018

Partial Scope EOI

Closed: 
22 Nov 2018
  Awarded

Full Scope EOI

Closed: 
10 Dec 2018

Partial Scope EOI

Closed: 
10 Dec 2018
  Awarded

Full Scope EOI

Closed: 
19 Dec 2018

Partial Scope EOI

Closed: 
16 Dec 2018
  Awarded

Full Scope EOI

Closed: 
19 Dec 2018

Partial Scope EOI

Closed: 
19 Dec 2018
  Awarded

Full Scope EOI

Closed: 
19 Dec 2018

Partial Scope EOI

Closed: 
19 Dec 2018
  Awarded

Full Scope EOI

Closed: 
19 Dec 2018

Partial Scope EOI

Closed: 
19 Dec 2018
  Awarded

Full Scope EOI

Closed: 
19 Dec 2018

Partial Scope EOI

Closed: 
19 Dec 2018
  Awarded

Full Scope EOI

Closed: 
24 Dec 2018

Partial Scope EOI

Closed: 
24 Dec 2018
  Awarded
AccordianPlus Paramedic Services

Full Scope EOI

Closed: 
24 Dec 2018

Partial Scope EOI

Closed: 
24 Dec 2018
  Awarded

Full Scope EOI

Closed: 
24 Dec 2018

Partial Scope EOI

Closed: 
24 Dec 2018
  Awarded
AccordianPlus Telecom Integrator

Full Scope EOI

Closed: 
24 Dec 2018

Partial Scope EOI

Closed: 
24 Dec 2018
  Awarded

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded
AccordianPlus Dust Fogging System

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded
AccordianPlus Koodaideri Airport

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded
AccordianPlus Process Plant SMP

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded
AccordianPlus Switchrooms

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded
AccordianPlus Water Pumps

Full Scope EOI

Closed: 
07 Jan 2019

Partial Scope EOI

Closed: 
07 Jan 2019
  Awarded

Full Scope EOI

Closed: 
24 Jan 2019

Partial Scope EOI

Closed: 
24 Jan 2019
  Awarded

Full Scope EOI

Closed: 
05 Feb 2019

Partial Scope EOI

Closed: 
05 Feb 2019
  Awarded
AccordianPlus Dust Collectors

Full Scope EOI

Closed: 
08 Feb 2019

Partial Scope EOI

Closed: 
08 Feb 2019
  Awarded

Full Scope EOI

Closed: 
14 Feb 2019

Partial Scope EOI

Closed: 
14 Feb 2019
  Awarded
AccordianPlus Mine NPI Facilities

Full Scope EOI

Closed: 
18 Mar 2019

Partial Scope EOI

Closed: 
18 Mar 2019
  Awarded

Full Scope EOI

Closed: 
20 Mar 2019

Partial Scope EOI

Closed: 
20 Mar 2019
  Awarded

Full Scope EOI

Closed: 
25 Mar 2019

Partial Scope EOI

Closed: 
25 Mar 2019
  Awarded
AccordianPlus 33kV Overhead Lines

Full Scope EOI

Closed: 
02 Apr 2019

Partial Scope EOI

Closed: 
02 Apr 2019
  Awarded

Full Scope EOI

Closed: 
05 Apr 2019

Partial Scope EOI

Closed: 
05 Apr 2019
  Awarded
AccordianPlus Tramp Metal Magnet

Full Scope EOI

Closed: 
05 Apr 2019

Partial Scope EOI

Closed: 
05 Apr 2019
  Awarded

Full Scope EOI

Closed: 
22 Apr 2019

Partial Scope EOI

Closed: 
22 Apr 2019
  Awarded

Full Scope EOI

Closed: 
22 Apr 2019

Partial Scope EOI

Closed: 
22 Apr 2019
  Awarded

Full Scope EOI

Closed: 
26 Sep 2019

Partial Scope EOI

Closed: 
26 Sep 2019
  Awarded

Full Scope EOI

Closed: 
25 Oct 2019

Partial Scope EOI

Closed: 
25 Oct 2019
  Awarded

Full Scope EOI

Closed: 
25 Oct 2019

Partial Scope EOI

Closed: 
25 Oct 2019
  Awarded
AccordianPlus Network Equipment

Full Scope EOI

Closed: 
28 Feb 2020

Partial Scope EOI

Closed: 
28 Feb 2020
  Awarded
AccordianPlus Shuttle Fabrication

Full Scope EOI

Closed: 
05 Apr 2019

Partial Scope EOI

Closed: 
05 Apr 2019
  Closed

Full Scope EOI

Closed: 
24 Oct 2019

Partial Scope EOI

Closed: 
24 Oct 2019
  Closed

Full Scope EOI

Closed: 
24 Oct 2019

Partial Scope EOI

Closed: 
24 Oct 2019
  Closed

Full Scope EOI

Closed: 
28 Feb 2020

Partial Scope EOI

Closed: 
28 Feb 2020
  Closed

Full Scope EOI

Closed: 
06 Mar 2020

Partial Scope EOI

Closed: 
06 Mar 2020
  Closed
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
WA AUSTRALIA

The expansion of the existing West Angelas iron ore mine site to provide a replacement source of iron ore to sustain current capacity and enable the continued operation of the existing processing plant, stockyards and rail loop that link the mine to the Rio Tinto Pilbara network.

View Project
PROJECT
WA AUSTRALIA

The upgrade and expansion of the Mesa B/C/H iron ore deposits to sustain existing Robe Valley production.

View Project
PROJECT
WA AUSTRALIA

The Project involves the expansion and development of iron ore deposits to sustain the existing Greater Tom Price production. The Tom Price mine is located approximately 32 kilometres west of Tom Price.

View Project