Level Crossing Removal Project - Southern Program Alliance



Contact Details


  Phil Davrain
  (04) 1775 5699
 CONTACT EMAIL

  Locations: VIC Australia
  Project Value: $588 million
  Project Status: Expressions of Interest
  Project Owner LENDLEASE ENGINEERING PTY LIMITED

Project Details


Project Details

The Victorian Government's circa $6.9 billion Level Crossing Removal project will see the removal of 50 of Melbourne's most dangerous and congested level crossings by 2022, with at least 20 of these removed by 2018. As part of the first stage of the Southern Program,  level crossing are to be removed at:

  • Station Street, Eel Race Road and Mascot Road, Carrum; and
  • Seaford Road, Seaford.


In addition, a new station will be constructed at Carrum, a new bridge to connect Station Street over the Patterson River, upgrades to Carrum Village, and the relocation of the Carrum train storage facility to a Kananook.


Awarded Package 

In December 2017, the Victorian Government announced the Lendlease, Acciona Coleman Rail and WSP consortium had been awarded the Alliance contract.


The works in Carrum and Seaford comprise four of the eight level crossing removals in the Southern Alliance Agreement. 


For more information on the level crossing removal programs, please visit http://levelcrossings.vic.gov.au/crossings


Packages of work will be published periodically on this page throughout the program with works associated with site establishment and 1st major packages listed below.


Project Pre-Qualification

Copies of the project's general requirements and reference material can be reviewed in the 'Project Documents' section below.  We encourage all suppliers and subcontractors to review these, prior to the specific scope documents. 


Tender Packages

As well as current open tender packages, the following packages are due to go to market on this ICN Gateway project page over the next 4-8 weeks:

  • directional drilling
  • pipe re-lining
  • reinforced steel supply
  • pits and conduits
  • expansion joints
  • piling
  • lighting
  • guardrail
  • asphalt
  • line marking
  • geofabric supply
  • general civil works 


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • Work Packages currently available to submit an EOI for are listed below.
  • To submit an EOI for the Work Packages listed, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • To submit an EOI, click on either the 'Full Scope' or 'Partial Scope' EOI checkbox of the relevant work package listed below.
  • Answer all the questions and click on the 'Submit' button.
  • All companies who submit an EOI will be included in information presented to Lendlease Engineering and Coleman Rail for this project.
  • It will then be the responsibility of Lendlease Engineering and Coleman Rail to make direct contact with you.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complimenting a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

 

ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance is available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Major Projects and Regional Opportunities.

(1) ICN Gateway Setup Wizard

(2) ICN Gateway User Guide

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   A. STAGE 1 PACKAGES CONTRACT    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
SPA-3022 - Graffiti Removalist 31 Aug 1812 Oct 1812 Oct 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-508 - Supply of Precast Super T Girders2 Feb 1818 Feb 1818 Feb 18
Download and complete the documents under the 'Docs' column.

Submit the required documentation by clicking on either the 'Full Scope' or 'Partial Scope' EOI checkbox.

All documentation must be submitted by 11.59pm, 18 Feb 2018.
SPA-509 - Concrete Supply2 Feb 1818 Feb 1818 Feb 18
Download and complete the documents under the 'Docs' column.

Submit the required documentation by clicking on either the 'Full Scope' or 'Partial Scope' EOI checkbox.

All documentation must be submitted by 11.59pm, 18 Feb 2018.
SPA-515 - Tree Removal and Grubbing2 Feb 1818 Feb 1818 Feb 18
Download and complete the documents under the 'Docs' column.

Submit the required documentation by clicking on either the 'Full Scope' or 'Partial Scope' EOI checkbox.

All documentation must be submitted by 11.59pm, 18 Feb 2018.
SPA-516 - Labour Hire2 Feb 1818 Feb 1818 Feb 18
Download and complete the documents under the 'Docs' column.

Submit the required documentation by clicking on either the 'Full Scope' or 'Partial Scope' EOI checkbox.

All documentation must be submitted by 11.59pm, 18 Feb 2018.
SPA-517 - Earthmoving Plant9 Feb 1825 Feb 1825 Feb 18
Download and complete the documents under the 'Docs' column.

Submit the required documentation by clicking on either the 'Full Scope' or 'Partial Scope' EOI checkbox.

All documentation must be submitted by 11.59pm, 25 Feb 2018.
SPA-519 - Spoil Cartage and Dispose9 Feb 1825 Feb 1825 Feb 18
Download and complete the documents under the 'Docs' column.

Submit the required documentation by clicking on either the 'Full Scope' or 'Partial Scope' EOI checkbox.

All documentation must be submitted by 11.59pm, 25 Feb 2018.
SPA-523 - Site Sheds and Amenities9 Feb 1825 Feb 1825 Feb 18
Download and complete the documents under the 'Docs' column.

Submit the required documentation by clicking on either the 'Full Scope' or 'Partial Scope' EOI checkbox.

All documentation must be submitted by 11.59pm, 25 Feb 2018.
SPA-006 - Supply of Expansion Joints23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-007 - Supply of Jump Screens / Railing23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-008 - Guardrail - Supply and Install23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-010 - Line Marking23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-011 - Lighting - Supply and Install23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-012 - Supply Service Grates and Covers23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-102 - Overhead Structure Piling23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-104 - Pile Break Back23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-105 - Pile Cap Construction23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-106 - Reinforced Earth Embankment Supply and Install23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-202 - Overhead Masts Steel Fabrication23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-204 - Sleeper Supply23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-205 - Rail Clips and Associated - Supply23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-208 - Overhead Wire23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-209 - Overhead Jewellry23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-210 - Overhead Install23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-211 - Signalling Install23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-212 - Signalling Test and Commission23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-503 - Barriers23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-510 - Reinforcing Steel Supply23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-530 - U Trough Installation - Crainage23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-531 - U Trough Stitch/Post Tensioning23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-543 - Pipe Relining 23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-550 - Precast Concrete Pits and Drainage and Kerb23 Feb 1823 Mar 1823 Mar 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-101 - Foundation Piling8 Mar 188 Apr 188 Apr 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-107 - Civil / Roadworks - Seaford Road8 Mar 188 Apr 188 Apr 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-203 - Rail Supply8 Mar 188 Apr 188 Apr 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-563 - Rail Plant8 Mar 188 Apr 188 Apr 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-564 - Crane Operations - Wet Hire8 Mar 188 Apr 188 Apr 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-577- Concrete Pumping17 Apr 181 May 181 May 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-552 - Asphalt Supply and Placement3 Apr 183 May 183 May 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-622 - Transport of OSOM Precast Concrete Elements16 May 1831 May 1831 May 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-571 - Prefabricated Buildings (SER and BER)7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-573 - Substructure Post Tensioning7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-579 - Structural Frames and Supports7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-580 - Landscaping7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-582 - Paving7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-583 - Road Sign Supply7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-584 - Street Light Poles7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-585 - Scaffolds7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-586 - Electrical Subcontractor7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-587 - High Voltage Subcontractor7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-589 - Shotcreting7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-590 - Demolition7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-591 - Fall Protection7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-617 - Structural Cladding7 May 1811 Jun 1811 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-634 - Supply and Delivery of Stainless Steel Pipes and Conduits and Brackets5 Jun 1819 Jun 1819 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-3002 - Design and Construct Temporary Rail Signalling - Carrum Slew13 Jun 1827 Jun 1827 Jun 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-628 - Kerb and Channel - Supply and Install8 Jun 186 Jul 186 Jul 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-3006 - Building Surveyor Services16 Jul 1830 Jul 1830 Jul 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-3007 - Registered Commercial Builder - Seaford Signalling Depot20 Jul 183 Aug 183 Aug 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-3008 - Directional Drilling and Boring30 Jul 1813 Aug 1813 Aug 18
Please answer all the pre-qualification questions provided in the EOI form.
SPA-3009 - Accommodation Booking Agent31 Jul 1814 Aug 1814 Aug 18
Please answer all the pre-qualification questions provided in the EOI form.