STANDARD LISTINGS ▲ CONTRACT
|
STATUS
|
|
SANTOS - DRILLING ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | ITT700 Provision of DD/MWD/LWD and Mudlogging Services for Barossa Development Drilling | 13 Jan 2021 | 13 Feb 2021 | 30 May 2021 |
| | |
| Provision of Directional Drilling & Measurement / Logging While Drilling (LWD), Offshore Mudlogging to drill, complete and flow 6 subsea production wells 300 kilometres north of Darwin, Northern Territory, within the Bonaparte Basin, located in the Timor Sea. |
| | ITT 716 Provision of XT Installation and Light-Well Intervention Services for Barossa Development | 21 Jan 2021 | 21 Feb 2021 | 30 May 2021 |
| | |
| Provision of services required to plan and execute XT Installation and Light-Well Intervention for the Barossa subsea wells, located 300 kilometres north of Darwin, Northern Territory, within the Bonaparte Basin in the Timor Sea. |
| | RFT 6108 Provision of Drilling Support Vessel Services for Barossa Development Drilling Campaign | 26 Feb 2021 | 26 Mar 2021 | 30 Sep 2021 |
| | |
| The scope of work requires the provision of technically compliant marine vessels to support the Barossa Development Drilling campaign, that will be undertaken using a Semi-Submersible Mobile Offshore Drilling Unit (MODU). |
| | RFI-ITT19-DRLBAR-MPD Provision of Managed Pressure Drilling (MPD) Equipment and Services(Cancelled) | 07 Aug 2019 | 30 Aug 2019 | 01 Jan 2020 |
| | |
| Provision of a Managed Pressure Drilling (MPD) package, including equipment and services, to deliver a closed-loop circulation system in which pore pressure, formation fracture pressure, and bottomhole pressure are balanced and managed at surface. The equipment and services will be operated from a moored Mobile
Offshore Drilling Unit/s (MODU) to complete and clean-up 6 subsea production wells 300 kilometres north of Darwin, Northern Territory, within the Bonaparte Basin, located in the Timor Sea.
Please see the scope of work for more Information. |
| | ITT15-DRLBAR-Int Svcs Provision of Integrated Services (Cancelled see attached documentation) | 20 Sep 2019 | 21 Oct 2019 | 01 Aug 2020 |
| | |
| This package has been cancelled and will be replaced with up to four (4) packages to be posted separately on ICN Gateway |
| | RFI ITT02 DRLBAR OCTG CRA Provision of CRA and OCTG | | | |
| | |
| Full scope has been awarded to:Marubeni-Itochu Tubulars Oceania Pty LTD | Level 9, 5 Mill Street, PERTH, WA Australia 6000 Contact Name: Paul Sosnowski Contact Phone: +61 8 9483 1705 Email: Paul@mito.net.au
|
The main objectives for this source of interest and information are to enable ConocoPhillips to identify suitable suppliers and gather the latest market information on CRA OCTGs that conform to the offshore well specifications identified in the scope of work. Tubulars will need to have a chemical composition with >15% chrome (final expected chrome content still to be determined) to withstand Barossa conditions for 25 years.
please refer to scope of work for further information |
| | RFI04 DRBAR DRL Conductor Provision of Large OD Casing 36 Conductor and 24 Structural Casing | | | |
| | |
| Full scope has been awarded to:Oil States Industries (Asia) Pte Ltd | 42H Penjuru Road Singapore 609158 Contact Name: Mick Gunnell Contact Phone: +61 8 9321 3777 Email: Sammick.gunnell@oilstates.com
|
The provision of large OD casing, to include 36 and 24 sizes, required for the well
construction of six (6) subsea production wells, 300 kilometres north of Darwin,
Northern Territory, within the Bonaparte Basin, located in the Timor Sea.
Please see the scope of work for more Information |
| | RFI03-DRBAR DRL Comp Bundle Provision of Downhole Completions Equipment and Rental Services | | | |
| | |
| Full scope has been awarded to:Awards - | This package has been split and will be awarded to numerous companies to be announced progressively in line with the award time frame. Details of the successful companies and their scopes are provided below :
Baker Hughes Australia Pty Ltd Contact Name: Steve Duncan 671 Karel Avenue, Perth, WA, 6164 Contact Phone: +61 8 9215 0641 Contact Email: Steve.Duncan2@bakerhughes.com
Scope: Provision of safety valve, permanent downhole gauge, production packer, swell packer and workshop services.
TCO AS Contact Name: Silje Valskaar Vestre Svanholmen 4, 4313 Sandnes, Norway Contact Phone: +47 53 50 16 71 Contact Email: Silje.vakskaar@tcogroup.com
Scope: Provision of chemical injection mandrel
Archer Well Company (Australia) Pty Ltd Contact Name: Vee Kee Ng 17 Truganina Road, Malaga, Western Australia Contact Phone: +61 8 681 601 200 Contact Email: vee.kee.ng@archerwell.com
Scope: Provision of suspension packers
|
The Barossa Drilling and Completion Program is premised to drill, complete and flow-back 6 subsea production wells 300 kms north of Darwin, Northern Territory,within the Bonaparte Basin, located in the Timor Sea. |
| | RFI33-DRBAR-DRL-QAQC Provision of Quality Assurance and Quality Control Services - Offshore Drilling | | | |
| | |
| Full scope has been awarded to:Fearnley Procter Australia Pty Ltd | Contact Name: Ben Grassham
Address: The Forces Centre 219-221, Level 29, St Georges Tce, Perth, Western Australia
Contact Phone: + 61 0477 113 135
Contact Email: ben.grassham@fp-g.com
|
Oil & Gas Technologies Pte Ltd | Contact Name: Ben Tan
Address: No. 3 Third Lok Yang Road, Jurong, Singapore
Contact Phone: +65 8418 4184
Contact Email: ben.tan@ogtec.net
|
PPI Australia Pty Ltd | Contact Name: Craig Davies
Address: Level 27, 44 St Georges Tce, Perth, Western Australia
Contact Phone: +61 432 792 666
Contact Email: craig.davies@cardno.com
|
In support of the Barossa Development Phase 1 Wells Campaign QA/QC services
will be required. |
| | RFI-ITT32-DRBAR-DRL-RIG.INSP Provision of Mobile Offshore Drilling Unit (MODU) Inspection Services | | | |
| | |
| Full scope has been awarded to:Aberdeen Drilling Consultants Ltd | Contact Name: Craig Duncan
Address: 32-34 Queens Road, Aberdeen, Scotland
Contact Phone: +44 (0) 1224 209123
Contact Email: cduncan@adc-engineering.com
|
Assurance Reliability Compliance Pte Ltd | Contact Name: Rob Egan
Address: 1 North Bridge Road, #03-23, High Street Centre, Singapore 179094
Contact Phone: +61 407 991 343
Contact Email: robegan@arc-assure.com
|
MODUResources (Australia) Pty Ltd | Contact Name: Eric Adlard
Address: Level 3, 12 St George's Terrace, Western Australia
Contact Phone: +08 9200 3430
Contact Email: eric.adlard@moduresources.com
|
In support of the Barossa Development Phase 1 Wells Campaign MODU inspection
services will be required. The work may include, but not be limited to conducting
Level 3 rig hardware assessment surveys for the following MODU categories,
systems and associated equipment, Please see the scope of work for more Information. |
| | RFI07 DRLBAR TBIRS Provision of Through BOP Intervention Riser System | 07 Mar 2019 | 05 Apr 2019 | 01 Jan 2020 |
| | |
| Provision of a Through-BOP Intervention Riser System (TBIRS) comprised of the
equipment and services necessary for subsea completion installation, well clean-up (well test flow back) and associated well intervention activities.
Please refer to the scope of work for additional information. |
| | RFI-ITT11-DRBAR-DRL-RIG.ENG Provision of Mobile Offshore Drilling Unit (Modu) Engineering Services | 24 Sep 2019 | 23 Oct 2019 | 01 Jan 2020 |
| | |
| In support of the Barossa Development Phase 1 Wells Campaign MODU Engineering
Services will be required.
Please refer to the scope of work for additional information. |
| | ITT08-DRLBAR-L-Hanger Provision of Liner Hanger Systems and Services | 29 May 2019 | 28 Jun 2019 | 01 Feb 2020 |
| | |
| Provision of Liner Hanger Systems and Services, Please see the scope of work for more Information. |
| | RFI01 DRBAR DRL MODU Provision of Mobile Offshore Drilling Unit s MODU | 10 Oct 2018 | 07 Nov 2018 | 01 Feb 2020 |
| | |
| Provision of Mobile Offshore Drilling Unit/s (MODU) to drill, complete and flow 6 subsea production wells 300 kilometres north of Darwin, Northern Territory, within the Bonaparte Basin, located in the Timor Sea. Please refer to attached brief scope for further information. |
| | ITT10-DRLBAR-DCF Provision of Drilling and Completion Fluids and Engineering Services | 29 May 2019 | 28 Jun 2019 | 01 Mar 2020 |
| | |
| Consists generally of the provision of necessary drilling fluids (bulks and packaged),
a storage, mixing and processing facility in Darwin for warehousing, blending
/treatment and processing of drilling fluids, base oil and brines, and the associated
offshore and onshore engineering services to support the drilling and completion of
6 subsea production wells 300 kilometres north-northwest of Darwin, Northern
Territory, within the Bonaparte Basin, located in the Timor Sea.
Please refer to the scope of work for additional information |
| | RFI09-DRBAR-DRL-Clean-Up Provision of Clean-Up Equipment and Services | 24 May 2019 | 21 Jun 2019 | 01 Mar 2020 |
| | |
| The Barossa Drilling and Completions program is premised to drill, complete and
flow-back 6 subsea production wells 300 kilometres north of Darwin, Northern
Territory, within the Bonaparte Basin, located in the Timor Sea.
Please see attached scope of work for more information. |
| | ITT12-DRLBAR-ROV Provision of Remotely Operated Vehicle (ROV) Rental/ Services | 05 Mar 2020 | 06 Apr 2020 | 31 Aug 2020 |
| | |
| The Barossa Drilling and Completion Program is premised to drill, complete and flow-back 6 subsea production wells 300 kms north of Darwin, Northern Territory, within the Bonaparte Basin, located in the Timor Sea.
See attached scope of work for additional information. |
| | ITT22-DRLBAR-Cooling Provision of Air Steam and Rig Deluge | 13 Mar 2020 | 10 Apr 2020 | 30 Sep 2020 |
| | |
| Provision of ancillary Flowback services, comprising steam supply / compressed
air supply / rig deluge services for the Barossa high rate flowbacks.
See attached scope of work for additional information. |
| | RFP680-Offshore Cementing Services | 10 Dec 2020 | 10 Jan 2021 | 31 Jan 2021 |
| | |
| Cementing Services to support the drill, complete and flow 6 subsea production wells 300 kilometres north of Darwin, Northern Territory, within the Bonaparte Basin, located in the Timor Sea.
Please refer to the scope of work for additional information |
| | RFP661-Cased Hole Wireline and Slickline Svcs | 20 Nov 2020 | 04 Dec 2020 | 31 Mar 2021 |
| | |
| Provision of Cased Hole Wireline and Slickline services to drill, complete and flow 6 subsea production wells 300 kilometres north of Darwin, Northern Territory, within the Bonaparte Basin, located in the Timor Sea.
See attached scope of work for further information |
| | ITT23-DRLBAR-CTLF Provision of Compensated Tension Lift Frame | 19 Feb 2020 | 19 Mar 2020 | |
| | |
| Provision of a Compensated Tension Lift Frame to provide backup compensation
in the event of a loss of compensation from the MODU active heave draw works
(AHD).
See scope of work for additional information |
| | RFI-ITT14-DRLBAR-CTR Provision of Casing and Tubing Running Services | 16 Oct 2019 | 15 Nov 2019 | |
| | |
| The Barossa Drilling and Completion Program is premised to drill, complete and flow-back 6 subsea production wells 300 kms north of Darwin, Northern Territory, within the Bonaparte Basin, located in the Timor Sea.
The scope of work is for the provision of Casing and Tubing Running Services please see attached scope of work for addational information. |
| | RFI-ITT18-DRLBAR-RMR Provision of Riserless Mud Recovery System and Rental Services | 11 Oct 2019 | 11 Nov 2019 | |
| | |
| The Barossa Drilling and Completion Program is premised to drill, complete and
flow-back 6 subsea production wells 300 kms north of Darwin, Northern Territory,
within the Bonaparte Basin, located in the Timor Sea.
Please refer to the scope of work for additional information. |
STATUS
|
|
SANTOS- PROJECT SERVICES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | 20180601-AUW-Independent Validation Body (IVB) Services | | | |
| | |
| Full scope has been awarded to:DNV GL Australia Pty Ltd | Level 2, 89 St Georges Terrace Perth WA 6000 Contact Name: Sam Chadwick Contact Phone: +61 (0) 439 254 880 Contact Email: Samuel.Chadwick@dnvgl.com
|
Please refer to attached brief scope of works for further information |
| | 20190201-AUW Manpower and Global Mobility Services | | | |
| | |
| Full scope has been awarded to:Air Consulting Australia Pty Ltd | Address: Level 2, 5 Mill Street, Perth Contact Name: Zoe Brookes Contact Phone No: 08 6318 1180 Contact Email: zoe.brookes@airswift.com
|
ConocoPhillips proposes to award a number of fabrication contracts in support of the Barossa Offshore Project, with work to be performed in international locations identified below. Company intends to begin mobilising personnel to these international locations in readiness for the detailed design and execute phase of the Project. |
| | 20190301-AUW Inspection Services | | | |
| | |
| Full scope has been awarded to:Applus Pty Ltd | Company Address: 94 Discovery Drive, Bibra Lake, WA, 6163, Australia Company Contact Name: Hassan Sajjad Contact Phone No: +618 9410 9344 Contact Email: Hassan.sajjad@applus.com
|
B.I.E. International (Aust) Pty Ltd | Company Address: Level 2, 30 Richardson Street, West Perth, W.A. 6005, Australia Company Contact Name: Darryn Rosenberg Company Contact Phone No: +618 9322 5876 Company Contact Email: Darryn.rosenberg@biegroup.com
|
Intertek Technical Services Pty Ltd | Company Address:Level 3, 235 St. Georges Terrace, Perth, W.A. 6000 Company Contact Name: Alistair Richardson Company Contact Phone No: +618 9263 0304 Contact Email: alistair.richardson@intertek.com
|
Killick Group LLC | Company Address:9720 Cypresswood Drive, Suite 470, Houston, TX 77070, USA Company Contact Name: Jack Lawler Company Contact Phone No:+1 713 409 8848 Company Contact Email: jlawlor@killickgroup.com
|
Provide global inspection services on behalf of ConocoPhillips to support contracting, manufacturing, fabrication, testing, delivery and installation work for the following scopes:
Floating, Production, Storage and Offloading (FPSO),
Subsea Production System (SPS),
Subsea Umbilical, Risers and Flowlines (SURF),
Gas Export Pipeline,
Fibre Optic Communication Package.
Please refer to the scope of work for additional information. |
| | RFI01-BAR-Helicopters | 01 Mar 2019 | 29 Mar 2019 | 01 Feb 2020 |
| | |
| Provision of Helicopter services for offshore personnel transfers, including provision of a dedicated Darwin operating base to support 24/7 Barossa Project construction and steady state operations post construction completion.
Please refer to the scope of work for more details. |
| | 20190802-AUW Medical Services | 10 Sep 2019 | 10 Oct 2019 | |
| | |
| Provision of Medical Services, including supply and delivery of an Intensive Care
Paramedical service to support the Company Helicopter Service provider.
This service will be based in Company's Helicopter Service provider facilities in
Darwin. Please refer to attached brief scope of works for further information. |
| | 20190803-AUW Marine Warranty Surveyor Services | 26 Sep 2019 | 10 Oct 2019 | |
| | |
| Please refer to attached brief scope for further information. |
| | 20191001-AUW EEHA Consultancy Support Services | 29 Oct 2019 | 19 Nov 2019 | |
| | |
| The scope of this work package is the provision of the Electrical Equipment for Hazardous Areas (EEHA) Consultancy Support Services.
Please refer to attached brief scope of works for further information. |
STATUS
|
|
SANTOS-SUBSEA AND EXPORT PIPELINE ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | 20180503a-AUW Transport and Installation of Export Pipeline. (Cancelled see attached documentation) | 14 May 2018 | 11 Jun 2018 | 25 Sep 2019 |
| | |
| The scope of this work package is the Transportation and Installation of the Barossa Gas Export Pipeline(GEP)- a 26", high pressure subsea pipeline approximately 260km long. Please refer attached brief scope for further information. |
| | 20180508-AUW Diverless Bend Stiffener Connections Supply. (Cancelled see attached documentation) | 24 Jul 2018 | 21 Aug 2018 | 25 Sep 2019 |
| | |
| The DBSC scope comprises supply of 18-off DBSCs for the Barossa project, consisting of 10-off initial installation phase and 8-off future phase. Please refer to attached brief scope for further information |
| | 20180510b-AUW Subsea Umbilical Riser and Flowline EPCI (Cancelled see attached documentation). | 14 May 2018 | 11 Jun 2018 | 25 Sep 2019 |
| | |
| Please refer attached brief scope for further information. |
| | 20180505-AUW Gas Export Riser Supply (cancelled as incorporated in package 20180504-AUW) | 14 May 2018 | 11 Jun 2018 | 01 Feb 2020 | 
| | |
| The scope of this contract was incorporated in package 20180504-AUW |
| | 20180503b-AUW EPCI of Export Pipeline | | | |
| | |
| Full scope has been awarded to:ALLSEAS MARINE CONTRACTORS AUSTRALIA PTY LTD | Level 8, 178 St George's Terrace, Perth W.A 6000 Mr. Adrian Parkins Work Package Manager Telephone: +61 8 6181 9500 Email: APk@allseas.com
|
The scope of this work package is the Engineering, Procurement, Construction and Installation (EPCI) of the Barossa Gas Export Pipeline (GEP)- a 26", high pressure subsea pipeline approximately 260km long.
Please refer to attached brief scope for further information. |
| | 20180504-AUW Production and Service Riser Supply | | | |
| | |
| Full scope has been awarded to:National Oilwell Varco Denmark I/S | Priorparken 480, 2605 Brondby, Denmark
Mr Mikkel Buhl Regional Sales Manager, Asia Pacific Telephone: +45 72 56 00 76: Mikkel.Buhl@nov.com
|
Please refer to attached brief scope for further information. |
| | 20180509-AUW Umbilical Supply | | | |
| | |
| Full scope has been awarded to:Aker Solutions AS | Oksenoyveien 8, 1366 Lysaker, Norway
Mr Fareez Yusoff Tender Manager Telephone: +47 22945411 fareez.yusoff@akersolutions.com
|
Please refer to attached brief scope for further information. |
| | 20180510a-AUW Subsea Umbilical Riser and Flowline (SURF) Transportation and Installation | | | |
| | |
| Full scope has been awarded to:Subsea 7 Australia Contracting Pty Ltd | Level 7, Australia Place 15-17 William Street, Perth, Western Australia 6000
Mr. Jeremy Cohen Supply Chain Manager Telephone: +61 8 93260691 Email: jeremy.cohen@subsea7.com
|
Please refer to attached brief scope for further information. |
STATUS
|
|
TFMC - SUBSEA PRODUCTION SYSTEM EPC ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Small / Medium Fabrications | | | |
| | |
| Full scope has been awarded to:This package has been split into 2 sub-packages | The sub-packages will be awarded to companies in line with the award time frame. Details of the successful companies and their scopes are provided below:'
Company Name: Remet S.A Company Contact Name: Mazur Grezegorz Company Address: UL. Kwiatkowskiego 1, 37-450, Stalowa Wola, Poland Company Contact Phone No.: +48 15 816 61 69 Company Contact Email address: info@remet.pl Scope: Provision of Lower Tree Frame with Bottom Funnel
Company Name: Wobi Stal SP. Company Contact Name: Pawl Stelmach Company Address: Przemyslowego, 37-450, Stalowa Wola, ul. Centralnego Okregu, Poland Company Contact Phone No.: +48 79 74 09 355 Company Contact Email address: pawel.stelmach@wobistal.pl Scope: Provision of Upper Tree Frame
|
. |
| | KC4-3 Hub and Receptacle Assembly | | | |
| | |
| Full scope has been awarded to:Aarbakke AS | Company Name: Aarbakke AS Company Contact Name: Eivind Siqveland Company Address: 1 Breimyra, Bryne 4344, Norway Company Contact Phone No.: +47 51 77 70 00 Company Contact Email address: eivind.siqveland@aarbakke.no Scope: KC4-3 Hub Small Bore
|
KC43 Hub and Receptacle assembly required as part of the Christmas Tree (XT)
assembly.
See attached scope of work for additional information. |