Safe System Road Infrastructure Program (SSRIP)



Contact Details


  Andrew Bradley
  (04) 4744 6091
 CONTACT EMAIL

  Locations: VIC Australia
  Project Status: Closed
  Project Owner VicRoads

Project Details


Safe System Road Infrastructure Program (SSRIP)


The Safe System Roads Infrastructure Program (SSRIP) program has a range of measures to improve road safety.

A number of Work Packages will be released to the market covering these measures.


Released to Market

  • Wire Rope and Guardrails - installation of Wire Rope and Guardrails
  • Project Zero - The Top 20 Program will take the 20 highest risk roads and implement safe system infrastructure on those roads; 9 of those being divided freeways/highways and 11 being undivided rural roads.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • Work Packages currently available to submit an EOI for are listed below.
  • To submit an initial EOI for the Work Package listed, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to potential bidders for this project.
  • Bidders for this project will be provided with your detailed company profile outlining capabilities to supply into the project. It will then be the responsibility of the bidder to make direct contact with the company.
  • As ICN Victoria becomes engaged on individual Work Packages of the 'Safe System Road Infrastructure Program (SSRIP), project specific EOIs may need to be submitted
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complimenting a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

 

ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance is available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email Notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Major Projects and Regional Opportunities.

(1) ICN Gateway Setup Wizard

(2) ICN Victoria 2015 Gateway User Guide

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Project Zero18 Sep 1731 Dec 1831 Dec 18
Main Contractors for this Work Package will be selected by VicRoads. However if you believe you have a product and/or service that is applicable please do an EOI against this Work Package.
The minimum level of local content set for this is 97% as well as Maximising the use of Local Steel products made from locally milled steel.
Safe System Road Infrastructure Program (SSRIP) - Any Opportunities7 Aug 1731 Dec 18 
Express interest for any opportunities that may arise for this project.
Wire Rope and Guardrail Installation - Products and Services18 Sep 1731 Dec 1831 Dec 18
Main Contractors for this Work Package will be selected by VicRoads. However if you believe you have a product and/or service that is applicable please do an EOI against this Work Package.
The minimum level of local content set for this is 97% as well as Maximising the use of Local Steel products made from locally milled steel.