Kalbar - Fingerboards Mineral Sands Project



Contact Details


Colin Young
Industry Adviser
+61 438 753 428
 CONTACT EMAIL

  Locations: VIC Australia
  Project Status: Expressions of Interest
  Project Owner KALBAR OPERATIONS PTY LTD

Project Details


About the project proponent

Kalbar Operations Pty Ltd is an Australian company with expertise in mining and ore extraction.


In 2013 Kalbar acquired the Gippsland Mineral Sands Project from Rio Tinto which included the very large Glenaladale deposit.  Since then, through extensive drilling campaigns and advanced analysis methods, Kalbar geologists have discovered and defined a new high value ore body in the eastern part of the Glenaladale deposit which is now the focus of the Fingerboards Project.


About the project

Located about 250 kilometres east of Melbourne, the Glenaladale deposit is one of the largest mineral sands deposits in the world, with a JORC (Joint Ore Reserves Committee) resource of 2.7 billion tonnes of heavy mineral.


The Fingerboards Mineral Sands Project focuses on a high-grade area of the Glenaladale orebody in the eastern part of the deposit located about 20 kilometres north west of Bairnsdale.  Kalbar proposes to extract 170 million tonnes of ore to produce around 8 million tonnes of heavy mineral concentrate (HMC) over 15 years.  The project area is approximately 1,675 hectares and the total area to be mined is approximately 1,100 hectares.

                                                             

For more information, visit www.fingerboardsproject.com.au


Project schedule

Subject to approvals, Kalbar proposes to begin construction of the project in early 2022. Construction and commissioning/start up will take approximately 12 months.


The approvals process for the Fingerboards Project commenced in the second half of 2016 and includes an Environment Effects Statement (EES) under the Victorian Environment Effects Act 1978.  The EES was completed in 2020 and ministerial assessment is anticipated in 2021. 


Capital Works Overview

The Fingerboards Mineral Sands Project is a greenfield mining project which aims to develop new mining and ore processing facilities and related infrastructure (such as roads, rail, and water).


Latest Project Information & Updates

Please see documents attached under 'Project Documents' section of this page.


Potential opportunities

  • Earthworks/civil works – dams, roads and drainage, concrete, earthen bunds, rail, foundations and hardstand
  • Buildings, structures and mechanical – offices, maintenance workshops, fuel storage, structural steel, cladding, process plant and thickener
  • Electrical and instrumentation – 66 kV and 22 kV, substations, switch rooms, control systems and transmission lines
  • Pipework and pumps – pipelines, pump stations, internal mains, borefield and process water
  • Miscellaneous – consulting rehabilitation services, fencing, security, transport, accommodation, labour hire, catering, plant hire and cleaning


Expressions of Interest (EOI) process

Kalbar is committed to supporting local industry participation and encourages capable local suppliers and contractors to express interest in providing products and services to the Fingerboards Project.


Click here for more information on Kalbar’s Local Content Guidelines.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • Please note that work packages are not yet defined. The list above is a brief overview of expected construction activities and trades. 
  • If you are interested in working on this proposed project and have capability in any of the listed areas above, Kalbar invites you to express your interest on the 'Potential Opportunities' work package below.
  • Companies who submit an EOI on the 'Potential Opportunities' work package will receive information from ICN and Kalbar as the project evolves.
  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complimenting a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.


ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance is available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN network - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to ICN Information and Updates, Major Projects and Regional Opportunities.

(1) ICN Gateway Setup Wizard

(2) ICN Gateway User Guide

SHOW LESS

Project Documents


Miscellaneous

  ▲ CONTRACT
Media Release - EES exhibition announced 31 August
Media Release - Fingerboards Project secures investment

General

  ▲ CONTRACT
Kalbar Ltd - Media Release
SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Potential Opportunities30 Sep 201931 Dec 2021 
 
Express interest to receive project updates on potential opportunities.
Consulting Services25 Feb 202031 Mar 202031 Mar 2020
  
To assist in mitigating the risk of impact to flora and fauna, Kalbar is seeking proposals for the preparation of a Faunal Impact Mitigation and Landscape Augmentation Plan (parts of which may be incorporated into a master biodiversity management plan).

It is envisaged the primary focus of this plan will be:

- The development of strategies, guidelines and action protocols to mitigate negative faunal impacts of project activities
- The development of strategies, guidelines, action protocols and indicative costings to achieve the best use of cleared timber (and associated organic material), rocks, gravels and other materials in order to stabilise or modify landforms or land surfaces.