WEBUILD S.P.A.

SYDNEY METRO WESTERN SYDNEY AIRPORT - STATIONS, SYSTEMS, TRAINS, OPERATIONS AND MAINTENANCE

location_onNSW Australia
location_on

NSW Australia

business

WEBUILD S.P.A.

Project Primary Contact
person_outline
Thuy Ho
Senior Consultant | Sydney and Sydney Surrounds
phone_enabled
+61 2 9927 3100
Overview

The Parklife Metro consortium, comprising of Webuild S.p.A, Siemens and RATP Development, has been selected to deliver the Stations, Systems, Trains, Operations and Maintenance (SSTOM) contract for the joint Australian and NSW government project.


The SSTOM contract has the largest scope of any Sydney Metro contract awarded to date, and is the largest Public Private Partnership awarded in New South Wales


The contract includes 12 new metro trains, six new stations between St Marys and the new Aerotropolis, core rail systems and the stabling and maintenance facility to be built at Orchard Hills.


Parklife Metro will also operate and maintain the Sydney Metro - Western Sydney Airport line for 15 years after it becomes operational.


The Australian and NSW governments have the shared objective of having Sydney Metro - Western Sydney Airport operational when Western Sydney International is open for passenger services.


The awarding of the final contract coincides with another significant project milestone, with Sydney Metro - Western Sydney Airport becoming the first rail infrastructure project in Australian history to commit to being certified carbon-neutral from the start of construction through to operation.


All carbon emissions generated during construction and operation will be reduced and offset.


This project will help shape the future of the vibrant and growing Greater Western Sydney region and connect commuters and travellers with the new Western Sydney International Airport, providing major economic stimulus and supporting more than 14,000 jobs during construction.


Further information on the project is available at sydneymetro.info/westernsydneyairportline.


How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI are listed in the 'Work Packages' tab above. Refer to the EOI User Guide below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance is available through the web links listed below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

186
Total work packages
186
Other work packages
186
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Siemens Opportunities
Status
Closed
Full scope EOI closes on
26 Nov 2023

Design, supply and delivery of access platforms for the front and side access to the train in the rolling stock depot.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Design, supply and delivery of air compressors to be installed in the rolling stock depot.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Design, supply and delivery of an Automated Warehouse Storage System in the rolling stock depot.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Aug 2023

Overhead Catenary System (OCS) installation of OCS fittings and fixtures, testing and commissioning of the OCS; including dynamic pantograph testing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Aug 2023

Expressions of interest for complete installation of typical rail trackside equipment. Construction and installation activities associated with the provision of these systems.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2023

Installation of static frequency convertor transformer, reactors, cooling system etc, including cable termination and testing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract Works Including provision of material, equipment and manpower to perform on site works for stud wall installation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2023

Installation of traction power system (TPS) including power transformer, 132kV GIS and MV switchgear etc, including cable termination and testing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2023

Design, supply and installation of modular overhead cranes in the rolling stock depot.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2023

Design, supply and installation of an interlocking solution between various electrical systems and maintenance building equipment for staff safety.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2023

Supply of mock-up wooden metro seats to be installed in the model of the exhibition rolling stock.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Jul 2023

Design, supply and delivery of battery charged Rail Mounted Multipurpose Trolley.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Jun 2023

Train mock-up assembly, cabling and installation in Sydney. Experience of installation of heavy parts, carpenter/stand builder or similar is requested.

Technical understanding to assemble complex assemblies is necessary.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Aug 2023

Various optical fibre configurations suitable for rail applications.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Aug 2023

Supply of the power distribution cabinets for the project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Aug 2023

Multiple packages of copper cable suitable for rail applications. Outdoor signalling and power cables, typically in accordance with AS-7663.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Webuild Opportunities
Status
Closed
Full scope EOI closes on
23 Oct 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation and maintenance of air monitors.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for (All Sites) Guardrail supply and installation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for (All Sites) Signs and Wayfinding.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for (All Sites) Traffic Lights (TCS).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for (All Sites) Utilities Relocation - Power & Comms

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for (All Sites) Utilities Relocation - Water & Sewer

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for balustrades.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Steel fabrication of canopies, balustrades and handrails.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Includes slide bearings / pot bearings.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site Building Works (cladding and roof - Depot & External Facilities)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Civil works for the Stabling and Maintenance Facility in accordance with the design.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for Concrete and Asphalt Cutting and Sawing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Place and finish concrete.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for contamination management and removal.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Includes civil and structural works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works Earthworks & Drainage (AEC).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Earthworks & Drainage (LPN, APD).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Earthworks & Drainage (OHE, STM).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply of materials, installation commissioning and skilled labour for electrical services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for external finishing works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Permanent Fencing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site the Finishing Works Stations.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply of materials, installation commissioning and skilled labour for fire services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for floor finishes.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Hire of general plant and equipment project wide.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Hire of tower cranes.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply of materials, installation commissioning and skilled labour for hydraulic services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works Street Lighting installation

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for subsoil installation subcontractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for Waterproofing installation Viaduct.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site ISF demolition works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for joiner and FFE.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for kerb and channel - form.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Landscaping works (ABP, APD).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Landscaping works (LDN)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Landscaping works (OHE)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Landscaping works (STM)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works (Linewide) Mechanical Systems

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Supply and transport of Aggregates, Road Bases & Quarry Materials linewide.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for low voltage, lighting and comms (for Stabling and Maintenance Facility).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for Masonry Block/Bricks Works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply of materials, installation commissioning and skilled labour for mechanical services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for metal roofing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for miscellaneous metalwork.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation and maintenance of Noise and Vibration Monitors

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation and maintenance of nurse call stations.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for painting.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Pavement Works (ABP, APD, LDN).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Pavement Works (AEC).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Pavement Works - Linemarking.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Pavement Works (OHE).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Pavement Works (STM).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for Road Construction.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works Roofing (Depot, incl. Gutters, Down Pipes)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for blockwork at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Ceiling works at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Communications services at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for decommissioning of electrical services at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for electrical services at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for floor finishes at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works at Stabling and Maintenance Facility (SMF) MEP - Electrical cabling.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works at Stabling and Maintenance Facility (SMF) MEP - Electrical works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works at (SMF) MEP - Fire System.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works at (SMF) MEP - Hydraulic Service.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works at Stabling and Maintenance Facility (SMF) MEP - Mechanical HVAC works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for permanent furniture at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Waste Water (sewer) at SMF.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for spray seal and asphalt.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for Station Facade Structure.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
16 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site Station Fitouts Works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

The subcontractor is required to construct the piling elements for the stations - at St Marys, Airport Business Park and Airport Terminal -and to provide all certified design, shop drawings, materials, labour, plant, fuel and equipment.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply and installation of structural steel works at Stabling and Maintenance Facility (SMF) in accordance with the design.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Express your interest for this work package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation and maintenance of civil, drainage and stormwater works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply and install of fire rated coatings to structural members.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation and certification of full form, reo and pour package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply and install A-class hoardings, fences and gates to perimeter.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation and maintenance of vertical transportation of workers and materials.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply and installations of landing platforms.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply and installation of precast elements.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Supply and install prototypes for:

1. St Marys Station - full size prototype of ground level concourse
2. Airport Terminal Station - full size prototype of underground platform
3. Other prototypes including:
a) Bicycle parking enclosure including exterior enclosure, entry, racks
b) Resting point shelter
c) Custom seating
d) Flight information display

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation, certification of access and construction scaffold.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower for the supply and install of signage

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Supply, installation and commissioning of a solar mounted system for the metro stations.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply and installation of structural steel works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply, installation and maintenance of temporary handrails

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for supply and install of UPS & batteries.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for asphalt supply and place.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply fuel bulk project wide as and when required.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Includes tunnel GST, brackets and support arms.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Supply of low voltage distribution boards.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Supply of multi-service vehicles for transportation of goods inside the tunnel.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Supply of Rag Bolt Assemblies (Hold Down Bolts for Major Structures)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Reinforcement coupler supply.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply, cut and bent reinforcing steel and wire mesh; including scheduling of rebar and transport to site.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply of construction and waste bins, and remove rubbish from site.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply and maintenance for security cameras (including timelapse) and guards.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Survey/controls
Construction Setout
Dilapidation surveys
Authority compliance survey

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply and deliver trackworks materials - buffer stops.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply and deliver trackworks materials - derailers.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply and deliver trackworks materials - rails.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply and deliver trackworks materials - sleepers and fasterners.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Supply and deliver trackwork materials - turnouts and crossover.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Internal - Manage vehicle movements, including traffic controllers inside RCC's site.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract Works Including provision of material, equipment and manpower to perform on site works for Traffic Management Precinct Works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Tree Planting.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works Environmental Monitoring for Temporary Tunnel Ventilation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Supply of fans, VSDs, dampers, pneumatic, attenuators.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Supply and transport of Attenuators for Tunnel Ventilation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Supply and transport of Pneumatic Systems for Tunnel Ventilation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site the installation works for Tunnel Ventilation Systems.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site the supply and Installation works for Tunnel Ventilation Systems.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Nov 2023

Supply and transport of VSDs for Tunnel Ventilation.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works Utilities - Electricity (AEC)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Electricity (ALT)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Electricity (OHE)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Electricity (STM, ABP)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Gas

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Telecommunications (LDN).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Telecommunications (OHE).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Telecommunications (STM).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works Utilities - Water (AEC)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Nov 2023

Subcontract works including provision of material, equipment and manpower to perform on site works for Utilities - Water (STM, OHE)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Excludes fencing and drainage works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Aug 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Subcontract works including provision of material, equipment and manpower to perform on site works for walls and partitions.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
04 Jun 2023

Supply of materials, installation commissioning and skilled labour for water removal services

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
17 Apr 2023

Express interest for this opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.