STATUS
|
|
MONADELPHOUS -SPME&I INFLOW ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Transport | 20 May 19 | 31 May 19 | 31 May 19 |
| |
| Transport from Perth to South Flank site and Local transport within Perth Metro area. |
| | Electrical Items - Equipment and Devices | 20 May 19 | 7 Jun 19 | 7 Jun 19 |
| |
| See attached scope for full details. |
| | Mechanical Items- Raw and Fire Water Tanks | 20 May 19 | 8 Jun 19 | 8 Jun 19 |
| |
| Installation and Supply of Raw and Fire Water Tanks |
| | Belt Splicing | 20 May 19 | 14 Jun 19 | 14 Jun 19 |
| |
| This scope of work covers the belt splicing for three conveyors for the South Flank Inflow Package (19300). Contractor will be required to supply belt splicing kits and all belt splicing equipment inclusive of belt reels, winches etc. There are two types and sizes of belts, first is 1500mm with a steel cord (91x splices) and the second is a fabric type at 2400mm wide (2x splices). |
| | Electrical Items - Cables | 20 May 19 | 14 Jun 19 | 14 Jun 19 |
| |
| See attached scope |
| | Electrical Items - Lighting | 20 May 19 | 14 Jun 19 | 14 Jun 19 |
| |
| See scope for full details |
| | Survey | 21 May 19 | 14 Jun 19 | 14 Jun 19 |
| |
| Contractor will be required to work seamlessly within Monadelphous's construction crews in several locations during the preassembly and installation processes. New structures include three conveyors (total 28km), multiple take up towers and ore crushing buildings |
| | Cable Ladder and Cover Supply | 4 Jul 19 | 12 Aug 19 | 12 Aug 19 |
| |
| See document for full details. |
STATUS
|
|
CLOUGH AUSTRALIA - NPI ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Heavy and Light Vehicle Wash Bay | 27 Aug 18 | 18 Sep 18 | 18 Sep 18 |
| |
| Design, supply and installation and commissioning support for a fully functional segregated Heavy Vehicle and Light Vehicle wash down facility |
| | Water Pumps and Standpipes | 27 Aug 18 | 18 Sep 18 | 18 Sep 18 |
| |
| Design, fabrication, FAT and commissioning support for raw water transfer pump skids and associated stand pipes |
| | Road Surfacing - supply and install | 27 Aug 18 | 31 Oct 18 | 31 Oct 18 |
| |
| Supply, installation and testing of asphalt road surfacing for the BHP South Flank NPI scope of works |
STATUS
|
|
CLOUGH AUSTRALIA- ORE HANDLING PLANT ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Crane Hire | 29 Mar 19 | 8 Apr 19 | 12 Apr 19 |
| |
| Please review the scope of works document for details of the package. |
| | Dust Suppression Fogging Spray System Assembly | 29 Mar 19 | 8 Apr 19 | 12 Apr 19 |
| |
| Please review the scope of works document for details of the package. |
| | Electrical Bulk Cable | 29 Mar 19 | 8 Apr 19 | 12 Apr 19 |
| |
| Please review the scope of works document for details of the package |
| | Lube and Hydraulic Piping including fitting | 29 Mar 19 | 8 Apr 19 | 12 Apr 19 |
| |
| Please review the scope of works document for details of the package. |
| | Automatic Grease System including piping | 4 Apr 19 | 29 Apr 19 | 29 Apr 19 |
| |
| Please review the scope of works document for details of the package. |
| | Electrical Bulk Joints | 4 Apr 19 | 29 Apr 19 | 29 Apr 19 |
| |
| Please review the scope of works document for details of the package. |
| | Fuel | 4 Apr 19 | 29 Apr 19 | 29 Apr 19 |
| |
| Please review the scope of works document for details of the package. |
| | Belt Splicing | 4 Apr 19 | 15 May 19 | 15 May 19 |
| |
| Please review the scope of works document for details of the package. |
| | Fibre Optic Termination and Testing | 17 Sep 19 | 27 Sep 19 | 27 Sep 19 |
| |
| See scope for full details |
| | High Voltage Termination | 17 Sep 19 | 27 Sep 19 | 27 Sep 19 |
| |
| See scope for full detail |
STATUS
|
|
CONTRACTS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Enabling Works (Miscellaneous) SP 1 and SP 2 | | | |
| |
| Full scope has been awarded to:Monadelphous Engineering Associates Pty Ltd | 59, Albany Highway Victoria Park WA 6100
For Subcontracting Opportunities Email: apply@monadel.com.au
For Work Opportunites www.monadelphous.com.au/careers/
|
Enabling Works (Miscellaneous) SP 1 and SP 2 scope document attached |
| | Project Construction Management Services | | | |
| |
| Full scope has been awarded to:Project Construction Management Services scope document attached. |
| | Transportable Buildings | | | |
| |
| Full scope has been awarded to:Mulla Mulla Village Expansion (MMVE) Transportable Buildings scope document attached. |
| | Village Construction and Facilities | | | |
| |
| Full scope has been awarded to:Decmil Australia | 20 Parkland Road Osborne Park WA 6017 Phone +618 9368 8877
Contact person Xander De Wet - Xander.DeWet@decmil.com.au
|
Mulla Mulla Village Expansion (MMVE) Village Construction and Facilities scope document attached. |
| | Village Earthworks | | | |
| |
| Full scope has been awarded to:Decmil Australia | Warwick Van Den Bussche, Engineering Manager 20 Parkland Road, Osborne Park WA 6017 T: +61 8 9208 8002 E: Warwick.vandenbussche@decmil.com.au
|
Mulla Mulla Village Expansion (MMVE) Village Earthworks scope document attached. |
| | Bulk Earthworks | | | |
| |
| Full scope has been awarded to:CPB Contractors | 202 Pier Street, Perth, WA, 6000 P: (08) 6436 6000 F: (08) 6436 6999 E: Paul.Biggs@cpbcon.com.au Web: www.cpbcon.com.au
|
NRW | 181 Great Eastern Highway, Belmont, Western Australia 6104 P: 08 9232 4200 E: james.cope@nrw.com.au Web: www.nrw.com.au
|
See scope document attached.
Bulk Earthworks (MAC) awarded to CPB Contractors.
Bulk Earthworks (South Flank) awarded to NRW. |
| | Module and Structural Steel Fabrication | | | |
| |
| Full scope has been awarded to:Tianjin BOMESC Offshore Engineering Company Co., Ltd | No.53 Bohai 27th Road ,Harbour Economic Area, Tianjin, China Phone: +86 22 25619922 Fax: +86 22 25619911 Web: www.bomesc.com
|
Module and Structural Steel Fabrication scope document attached. |
| | Structural Mechanical Piping Electrical and Installation | | | |
| |
| Full scope has been awarded to:Monadelphous Engineering Associates Pty Ltd | 59, Albany Highway Victoria Park WA 6100
For Subcontracting Opportunities Email: apply@monadel.com.au
For Work Opportunites www.monadelphous.com.au/careers/
|
See attached scope document |
| | Mining Area C Non-Process Infrastructure | | | |
| |
| Full scope has been awarded to:See Scope Attached |
| | South Flank Non-Process Infrastructure | | | |
| |
| Full scope has been awarded to:See Scope Attached |
| | Heavy Haulage Transport | | | |
| |
| Full scope has been awarded to:Contact | Steven Collins, Operations Manager Telephone: +61 8 9472 3515 Email: steven.collins@mammoet.com
|
Heavy Haulage Transport |
| | Rail - Signal and Communications | | | |
| |
| Full scope has been awarded to:John Holland | Level 5, 10 Telethon Avenue, PERTH, WA Australia 6000
Nguyen Khuu E: Nguyen.Khuu@JHG.com.au M: 0407 479 603
|
This package will be executed in the new Mining Area C (MAC) yard area and the main rail line area up to chainage 306.6km level crossing. Each component of the work will be split into the following chainage areas:
* new signalling and associated communications work within the mine loop area from the new yard entry location defined by MAC 1/2 signals at chainage 336.331km;
* new captive optic fibre work (FOC) between the yard entry location at chainage 336.331km and chainage 347.848km linking vital communications of all new signalling sites within the yard; and
* Signalling and asset protection systems power supply upgrade between chainage 332.0km hot box detector location and chainage 306.9km level crossing.
The Contractor shall provide design, supply, installation, testing and commissioning of all work associated with the three areas detailed. |
| | Site Surveying Services | | | |
| |
| Full scope has been awarded to:Land Surveys No Problems Just Solutions Pty Ltd | Attention: Luke Charlesworth
lcharlesworthAlandsurveys.net.au
|
This package is for the provision of field survey of natural and constructed topographical features of the South Flank site (including GIS, associated mapping support and compilation of composite services) for both existing and newly constructed works. |
| | Dust Suppression | | | |
| |
| Full scope has been awarded to:See Scope Attached |
| | 132/33kV HV Transmission and Distribution | | | |
| |
| Full scope has been awarded to:Contact | Downer EDI Engineering Power Pty Ltd Address: 9 Modal Crescent, Canning Vale WA 6155 Phone: +61 8 9318 9111 Email: Paul.Hopkins@downergroup.com
|
See attached scope document |
| | Freight Forwarding and Domestic Heavy Haulage | | | |
| |
| Full scope has been awarded to:Contact | Contact: Bevan Thomas 919 Abernethy Road, High Wycombe, WA 6057 Email: Bevan.Thomas@dbschenker.com Phone: 08 6310-2827
|
See attached scope document |
| | Inflow - Primary crushing facilities and Overland Conveyors | | | |
| |
| Full scope has been awarded to:See attached scope of work |
| | Ore Handling Plant | | | |
| |
| Full scope has been awarded to:Contact | Jim Simons Project Manager Email: BHPOHP.inquiry@clough.com.au
|
See attached scope of work |
| | Outflow - Train Loadout and Stockyard Conveyors | | | |
| |
| Full scope has been awarded to:Contact | Nilesh Sheth Phone - +61 8 6252 4692 Emaill - SouthFlankOutflowICN@Monadel.com.au
|
Structural, mechanical, piping and electrical works for expansion of the existing stock yard and construction of a new Train Load Out (TLO) complete with conveyors (12 off) and transfer stations (6 off), located within an existing rail loop. |
| | Smart Module Fabrication | | | |
| |
| Full scope has been awarded to:Contact | Contact Mr David Power P - 9437 6288 E - david.power@civmec.com.au
|
See attached scope document |
| | Fabrication of Central Facilities | 29 Mar 17 | | 28 Jun 17 |
| |
| Mulla Mulla Village Expansion (MMVE) Fabrication of Central Facilities scope document attached. |
| | Crushing Plant Tie In Conveyors | 10 Apr 17 | 26 Apr 17 | 30 Jun 17 |
| |
| Crushing Plant Tie In Conveyors scope document attached. |
| | Asset Integration Services | 13 Feb 18 | 13 Mar 18 | 13 Mar 18 |
| |
| See attached scope |
| | Shop Detailing Services | 8 Nov 17 | 5 Dec 17 | 31 Mar 18 |
| |
| See attached scope document |
| | Miscellaneous Civil Works | 31 Jan 18 | 28 Feb 18 | 28 Jul 18 |
| |
| See Attached Scope |
| | Yandi Temporary Power Station | 5 Sep 17 | 30 Sep 17 | 30 Sep 18 |
| |
| See attached scope document |
STATUS
|
|
CPB CONTRACTORS- BULK EARTHWORKS ( MAC) ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Electrical Installation | | | |
| |
| Full scope has been awarded to:See scope for full details |
| | Rail Welding | | | |
| |
| Full scope has been awarded to:Provide a flashbutt welder and welding team, or alternatively Aluminothermic weld kits and welding team. Contractor to remove and replace all non-conforming welds. Rails sections clipped and welded at neutral temperatures only. |
| | Scaffolding and Labour on Site | | | |
| |
| Full scope has been awarded to:Provide scaffolding systems, equipment and labour for safely working at heights or around open excavations. |
| | Steel Fixing Services | | | |
| |
| Full scope has been awarded to:Supply of Steel Fixing Services on Site |
| | Stockyard Rail Grouting | | | |
| |
| Full scope has been awarded to:Contact | Name: Andrew Drake Tel : +61 3 93310 5686 Email: andrew@dglcon.com.au
|
See Attached |
| | Supply and Delivery of Bollards | | | |
| |
| . In-ground bollards, customised design
. Quantity circa 392
. Delivery to CPB Warehouse Midvale
|
| | W-Beam Supply and Installation | | | |
| |
| Full scope has been awarded to:Direct Contact | Jamie Morton Ph: 0403 165 631 jamie@sbwa.com.au
|
Supply & Installation of W-Beam guardrail as part of the road furniture. |
STATUS
|
|
DECMIL-VILLAGE CONSTRUCTION & FACILITIES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Decmil - Supply and Installation of Asphalt | 30 Nov 17 | 15 Dec 17 | 15 Dec 17 |
| |
| The Asphalt package will consist of mobilising to site for the supply and installation of asphalt across the site including the car parks, roads and walking tracks including the supply of all plant, equipment and labour for the works. |
| | Decmil - Supply and Installation of Ceilings and partitions | 30 Nov 17 | 15 Dec 17 | 15 Dec 17 |
| |
| The Ceiling and Partitioning package will consist of the supply and installation of ceilings and partitions for various buildings across the site including the supply of all plant, equipment, materials and labour for the erection of the ceilings and partitions. |
| | Decmil - Supply and Installation of Landscaping | 30 Nov 17 | 15 Dec 17 | 15 Dec 17 |
| |
| The Landscaping package will consist of the supply and installation of plants, irrigation, garden furniture and exercise stations across the site including the Supply of all plant, equipment material and labour for the works. |
| | Decmil - Supply and Installation of Steelwork | 30 Nov 17 | 15 Dec 17 | 15 Dec 17 |
| |
| The Steelwork package will consist of the supply, fabrication and installation of steel work across the site including shop detailing, fabrication, surface treatment and delivery to site of steel works. The package includes the supply of all plant, equipment materials and labour for the erection of the steelwork |
STATUS
|
|
MAMMOET ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Accredited Pilot Vehicle Services | 23 Aug 19 | 6 Sep 19 | 6 Sep 19 |
| |
| Please refer to SOW for further details pertaining to this package. |
| | Traffic Management | 23 Aug 19 | 6 Sep 19 | 6 Sep 19 |
| |
| Please refer to SOW for further details pertaining to this package. |
| | Coffee Van Services | 20 Aug 19 | 16 Sep 19 | 16 Sep 19 |
| |
| Coffee Van to accompany night convoys transporting over size and over mass (OSOM) cargo for the BHP South Flank Project (South Flank). |
STATUS
|
|
MONADELPHOUS -SPME&I OUTFLOW ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Supply of Cables | 21 May 19 | 14 Jun 19 | 14 Jun 19 |
| |
| please refer to the scope of works document for details of the package |
| | Supply of Electrical Equipment and Control Devices | 23 May 19 | 20 Jun 19 | 20 Jun 19 |
| |
| Please refer to scope of works for further details pertaining to the package. |
| | Conveyor Belt Installation and Splicing | 23 May 19 | 24 Jun 19 | 24 Jun 19 |
| |
| Please refer to scope of works document for details of the package |
| | Hydraulic and Lubrication Systems | 18 Jun 19 | 15 Jul 19 | 15 Jul 19 |
| |
| Supply & installation of hydraulic and lubrication systems for fines & lump conveyors for Stockyard, overland and other long conveyors (9 x conveyors and 2x shuttle). |
| | Supply of Cable Ladder Cover | 9 Jul 19 | 19 Jul 19 | 19 Jul 19 |
| |
| This scope of work includes the supply of the cable ladder & cover required for electrical works for the South Flank Outflow Package. |
| | Transportation | 19 Jul 19 | 29 Jul 19 | 29 Jul 19 |
| |
| See Scope for full Details |
| | Surveying Services | 19 Jul 19 | 29 Jul 19 | 31 Jul 19 |
| |
| See scope for full details. |
| | Site Civil Works | 9 Aug 19 | 23 Aug 19 | 23 Aug 19 |
| |
| Please refer to scope of work for further details pertaining to this package. |
| | Site Demolition Works | 6 Nov 19 | 9 Dec 19 | 9 Dec 19 |
| |
| Please refer to SOW for further details pertaining to this package. |
STATUS
|
|
MONADELPHOUS- OVERLAND CONVEYOR MODULES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Concrete Sleepers | 8 May 19 | 18 May 19 | 18 May 19 |
| |
| Manufacturing of concrete sleeper blocks -Blocks with anchor bolts and swift lift embeds are between 2400mm/2630mm long and 600mm/1000mm wide to 240mm/355mm deep. |
| | Pre-cast Concrete Footings for Conveyor Module | 20 May 19 | 31 May 19 | 31 May 19 |
| |
| The scope of work includes the supply & manufacturing of pre-cast concrete footings for the stacking yard conveyors associated with South Flank Outflow Package (9641-C-83616). |
STATUS
|
|
NRW - BULK EARTHWORKS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | HDPE Pipework Fittings and Valves Supply | 17 Sep 18 | 5 Oct 18 | 5 Oct 18 |
| |
| HDPE PE100 for raw water, slurry and potable water lines for above and below ground including all fittings and valves. |
| | W Beam Guardrail Supply and Install | 17 Sep 18 | 5 Oct 18 | 5 Oct 18 |
| |
| Supply and installation of W Beam guardrail and ends. Approximately 9,500m of rail to be installed complete with approximately 180no end treatments. |
| | Electrical Cabling and Conduit Installation | 17 Sep 18 | 12 Oct 18 | 12 Oct 18 |
| |
| Supply and installation of approximately 28,000m of PVC HD conduits ranges 50mm-150mm. |
| | Bitumen Sealing and Asphalt Works | 17 Sep 18 | 19 Oct 18 | 19 Oct 18 |
| |
| Prime, one coat and two coat bitumen sealing works. Approximately 180,000m2 of sealing works required to be completed during a number of visits. 40mm dense asphalt approximately 12,000m2. |
| | HDPE Piping and Fittings Installation | 17 Sep 18 | 30 Oct 18 | 30 Oct 18 |
| |
| Above and underground HDPE pipe and fittings installation for water reticulation and storage to Primary Crushing (PC), Overland conveyors (OLC), Mobile Equipment Maintenance (MEM) Workshop locations. |
STATUS
|
|
PROCUREMENT ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Bulking In Hopper | | | |
| |
| Full scope has been awarded to:TRANSMIN Pty Ltd | Jesse Walters, Project Manager
33-37 Denninup Way Malaga WA, 6090 M: 0439 690 349 E: Jesse.Walters@transmin.com.au
|
Bulking In Hopper scope document attached. |
| | Mulla Mulla Village Expansion Chillers | | | |
| |
| Full scope has been awarded to:CARRIER AUSTRALIA PTY LTD | 152 Wellington Road CLAYTON, VIC Australia 3168 Phone: +61 3 8551 0327 Web: www.carrieraircon.com.au
|
Mulla Mulla Village Expansion Chillers scope document attached |
| | Mulla Mulla Village Expansion Lifts | | | |
| |
| Full scope has been awarded to:KONE ELEVATORS PTY LTD | 205 Euston Road ALEXANDRIA, NSW Australia 2015 Phone: +61 2 9577 7000 Fax: +61 2 9577 7100 Web: www.kone.com.au
|
Mulla Mulla Village Expansion Lifts scope document attached |
| | Mulla Mulla Village Expansion Waste Water Treatment Plant | | | |
| |
| Full scope has been awarded to:Mulla Mulla Village Expansion Waste Water Treatment Plant scope document attached. |
| | 132kV Power Cable | | | |
| |
| Full scope has been awarded to:CableGrid Australia Pty Ltd | 224 Stafford Road, Queensland
Contact - Michael Wicks Phone - 0487 007 123 Email - michael.wicks@cablegrid.com.au
|
See attached scope document |
| | 33kV Power Cable | | | |
| |
| Full scope has been awarded to:CableGrid Australia Pty Ltd | 224 Stafford Road, Queensland
Contact - Michael Wicks Phone - 0487 007 123 Email - michael.wicks@cablegrid.com.au
|
See attached scope document |
| | 415V MCCs Transformer Kiosks and Transportable Substations | | | |
| |
| Full scope has been awarded to:Kounis Metal Industries Pty Ltd | 84 Norma Road Booragoon WA 6154 Contact Brett Heslin
Phone 0418936095 Email brett.heslin@kounis.com.au
|
See attached scope document |
| | Distribution Transformers (Less than 10MVA) | | | |
| |
| Full scope has been awarded to:ABB Australia Pty Ltd | 1 Bapuame Roadd Moorebank NSW 2170
Contact - Sepideh Edrisi P - 0407 713 481 E - sepideh.edrisi@au.abb.com
|
See attached scope document |
| | Power Transformers (Greater than 10MVA) | | | |
| |
| Full scope has been awarded to:Wilson Transformers | 310 Springvale Road Glen Waverley Victoria
Contact - Sudesh Menuka Phone- 04019 346 132 Email - sudesh.menuka@wtc.com.au
|
See attached scope document. |
| | Dust Suppression System | | | |
| |
| Full scope has been awarded to:. | Contact - Vitold Ronda P - 007 3366 8588 E - vitold.ronda@enviro-mist.com.au
|
See Attached Scope of Work |
| | Conveyor Idlers - Overland | | | |
| |
| Full scope has been awarded to:Conveyor Product Solutions | 69 Dowd St Welshpool 6106 Contact - Matt Einhorn P- 0499 330 575 E - matt.einhorn@cpsconveyors.com.au
|
The Scope of Work requires engineered design and supply of all materials, fabrication, assembly, aligning, painting, shop testing, equipment labelling and pack for transport to Site of conveyor idler frame and roller assemblies. Please refer to attached brief scope of works for further information |
| | Conveyor Idlers - Plant | | | |
| |
| Full scope has been awarded to:Contact | Daniel Weekes P - 0438 860 484 E - dweekes@bbcp.com.au
|
The Scope of Work requires engineered design and supply of all materials, fabrication, assembly, aligning, painting, shop testing, equipment labelling and pack for transport to Site of conveyor idler frame and roller assemblies. Please refer to attached brief scope of works for further information |
| | Power Factor Correction | 19 Apr 18 | 10 May 18 | |
| |
| See Attached |
| | Dynamic Reactive Support (DRS) System | 5 Apr 17 | 28 Apr 17 | 30 Jun 17 |
| |
| Dynamic Reactive Support (DRS) System scope document attached. |
| | Mulla Mulla Village Expansion Cafe | 31 Mar 17 | 13 Apr 17 | 13 Jul 17 |
| |
| Mulla Mulla Village Expansion Cafe scope document attached |
| | Conveyor Shuttles and Feed Conveyors | 24 Apr 18 | 22 May 18 | 23 Jul 18 |
| |
| See Attachment |
| | Commissioning Services | 11 Jun 18 | 5 Jul 18 | 5 Aug 18 |
| |
| See Attached Scope of Work |
| | Fabrication and Modularisation Site(s) - Material Management Tracking and Technical Support Services | 16 Jul 18 | 13 Aug 18 | 13 Nov 18 |
| |
| See attached scope description |
| | Mulla Mulla Village Western Accommodation Expansion | 28 May 19 | 14 Jun 19 | 14 Jul 19 |
| |
| Includes transportation, installation and major refurbishment of 110 BHP supplied accommodation units (440 rooms) and laundries and connection to existing utilities at the Mulla Mulla Village. The work will also include Installation of services including water, sewer, power and communications connections and construction of roads and landscaping. |
STATUS
|
|
SCHENKER- FREIGHT FORWARDING &LOGISTICS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Domestic Transport | 4 Apr 19 | 23 Apr 19 | 23 Apr 19 |
| |
| See attached Scope |