Gorgon Stage Two (GS2)



Contact Details


  Carla Peyton
  (08) 9365 7543
  (08) 9365 7543
CONTACT EMAIL

  Locations: WA Australia
  Project Status: Front End Engineering Design (FEED)
  Project Owner Chevron Australia Pty Ltd

Project Details


Opportunities listed below are for Chevron Australia Pty Ltd packages specifically for Gorgon Stage 2 (GS2). Australia-wide contracts utilised for GS2 will be listed on the Chevron Australia Operations page.

 

Project Description:

The Chevron Australia operated Gorgon Project is one of the world's largest natural gas projects and the largest single resource development in Australia's history. GS2 is an upgrade to the Gorgon Project's existing subsea petroleum facilities. Further wells and subsea infrastructure are to be added to the existing Gorgon and Jansz-Io Fields to maintain future gas supply for the Project.

The following is currently included in the scope of GS2:

  • Wells and subsea infrastructure through Gorgon main production pipeline (infill development of Gorgon Manifold 1 and development of Gorgon Manifold 4); and
  • Wells and subsea infrastructure through Jansz-Io main production pipeline (development of Jansz-Io Drill Centre 3 manifold).

The Gorgon Project is operated by Chevron Australia and is a joint venture of the Australian subsidiaries of Chevron (47.3 percent), ExxonMobil (25 percent), Shell (25 percent), Osaka Gas (1.25 percent), Tokyo Gas (1 percent) and JERA (0.417 percent).

 

Project Location:

The Gorgon and Jansz-Io gas fields located within the Greater Gorgon area, between 130 and 200 kilometres off the northwest coast of Western Australia.

 

In addition to the GS2 opportunities listed on this page, Chevron Australia is proceeding with contracting for the following packages which are listed Asset Development on the Chevron Australia Operations page.

       

       GS2 Offshore Installation:

        Asset Development for GS2 and Great Australian Bight (GAB):


Further information on Accessing Opportunities with Chevron Australia on GS2 can be found under Project Documents below.

SHOW LESS

Project Documents


Project Documents

  ▲ CONTRACT
Accessing Opportunities with Chevron Australia GS2
SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   WORK PACKAGES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Vessels Anchor Handling Tug Supply (AHTS) Vessels / Platform Supply Vessels (PSV) (U-17759)13 Dec 173 Jan 18 
Expressions of interest are being sought from contractors able to supply vessels in
support of the Gorgon Stage 2 (GS2) Project drilling campaign. For further information please refer to attached brief scope of works.
Cementing Float Equipment and Accessories21 Sep 1713 Oct 1730 Jan 18
See scope attached