STATUS
|
|
1) CARRAPATEENA - OPERATIONS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | OZ Minerals - Supply of Products and Services | 1 Apr 19 | 31 Dec 19 | | 
| | |
| OZ Minerals' Carrapateena project is currently in peak construction phase and is on schedule to be operational (ie first concentrate production) in 2019 Quarter 4.
If you would like to register your business for delivery of products and services when the mine is operational, please respond to the questions listed under the 'Full Scope EOI' icon and then click 'Submit' to upload your completed EOI. |
| | Battery Electric 4x4 Light Vehicle CEX-CON-015 | 25 Sep 19 | 10 Oct 19 | |
| |
| OZ Minerals issues this Expressions of Interest (EOI) to seek market interest from suitably qualified and experienced suppliers of electric light vehicles to participate in a Tender Process to be conducted by OZ Minerals in due course. Proponents seeking to participate in the tender process shall express its interest by submitting a capability statement and additional supporting information in response to this EOI.
For more information, please refer to the attachment under 'DOCS' titled:
OZ MINERALS' CARRAPATEENA PROJECT
Expressions of Interest
Battery Electric 4x4 Light Vehicle for Underground Mining |
| | OZ Minerals - Carrapateena - Conveyor Belt Splicing | 1 Oct 19 | 15 Oct 19 | |
| |
| OZ Minerals is seeking expressions of interest from specialised service providers who will be required to liaise with OZ Minerals' Engineering Planners to ensure timely repairs, replacements and splicing of all the fabric and steel cord conveyor belting on site, when and if required.
For more information on this work package, please refer to the document attached at the DOC icon. |
| | OZ Minerals - Carrapateena - Laboratory Sample Courier Service | 12 Jun 19 | 28 Jun 19 | |
| |
| Please refer to the attached document titled 'Laboratory sample courier service EOI - Carrapateena' for information on this work package.
To submit an expression of interest, please click the 'FULL SCOPE EOI' icon and respond to the qualification question. |
| | OZ Minerals - Carrapateena - Rubber Lining | 1 Oct 19 | 15 Oct 19 | |
| |
| OZ Minerals is seeking expressions of interest from service providers who will be required to liaise with OZ Minerals' Engineering Planners to ensure timely repairs and overhauls of various pieces of critical equipment are completed, when and if required.
For more information on this work package, please refer to the documents listed below, which are attached under the PDF icon:
1) Rubber Lining Work Package
2) CA-000-MEC-SPE-1005 Specification Elastomeric Lining
3) OZ Minerals Carrapateena Pty Ltd - Carrapateena Project - Lining with Rubber Engineering Specification |
| | Remote fuel pod resupply for Carrapateena | 16 Oct 19 | 26 Oct 19 | | 
| |
| OZ Minerals is seeking Expressions of Interest from companies who are able to deliver against the following criteria:
- Diesel supply to outlying areas around the Carrapateena site
- Areas not always accessible by non off-road capable vehicle
- Delivery only from main on site bulk fuel facilities, ie no requirement for fuel supply
- Required to deliver at full capacity cumulatively 174,000 litres every 2 weeks to 17 sites.
To submit an expression of interest, please click the 'FULL SCOPE EOI' icon and respond to the prequalification question. |
STATUS
|
|
2) CARRAPATEENA - CONSTRUCTION ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Concentrate Logistics - Carrapateena Mine Site | 15 Jan 19 | 1 Feb 19 | |
| |
| Expression of Interest
This scope of Services sets out the duties of the contractor for:
. Transport of product from the loading point by road along the Site Access Road and then public highways A87 and A1 to the delivery point in Adelaide;
. Loading and sampling of concentrate into the OZ Minerals provided shipping containers;
. Other Site and logistics services as set out in this schedule.
The main elements of the scope are:
. Pick up and load product at the loading point from the bulk stockpile into OZ Minerals supplied containers. Each container will require sampling, weighing on the loading operation. The equipment to load the containers is to be supplied by the contractor;
. Deliver the containers by road to the delivery point;
. Unload containers at the delivery point;
. Collection of empty, back-loaded containers at the delivery point and return them to the loading point by road to be reloaded with product;
. Management of container logistics with Carrapateena Operations;
. Stockpile movements of product from the filter discharge bunker to the concentrate storage pad if required, as directed by OZ Minerals.
The road haulage is a 365 day per year operation. The shipping containers are shared between OZ Minerals Carrapateena and OZ Minerals Prominent Hill, of which there are currently 1,400 units. The maximum load weight of the container for road freight on a public road is 25WMT, which must be strictly adhered to by the contractor. The process is required to deliver a consistent supply of product to the delivery point consistent with the Carrapateena Mine production plan. There is limited storage for product at the mine site for both bulk concentrate powder and storage of containers. To assist the contractor, the processing department will provide production planning guidance on a consistent basis as well as clear specifications of the storage and facilities provided for at the mine site.
|
| | Cranage - Carrapateena Mine Site | 24 Aug 18 | 10 Sep 18 | |
| |
| OZ Minerals is seeking expressions of interest for minor site crange works at the Carrapteena Mine Site, including relocation of office facilities and containers, off-loading of transport.
Majority of works to be undertaken by 20T Franna, however, capability to undertake up to 100t lifts required.
|
| | Dry Hire Surface Moving Equipment - Carrapateena Mine site | 15 Jan 19 | 1 Feb 19 | |
| |
| This scope is for the supply and maintenance of surface mobile equipment serving the operations department of the Carrapateena project. This equipment is to be used in the minerals processing plant to ensure safe and efficient continued operation, however may be used in areas outside of this on occasion based on operational needs.
The equipment specified below is outlined for a sizing guidance only, and other equipment manufacturers may be substituted as a part of the proposal. However, the functionality of the machinery must meet the desired specification, unless otherwise agreed.
. Komatsu WA250 Front End Loader (FEL) or equivalent.
. Komatsu SK820-5 Skidsteer loader or equivalent.
. Excavator (40t) CAT336L or equivalent.
The scope of supply is dry hire as the equipment will be operated by OZ Minerals staff at the minerals processing facility (MPP). Minor maintenance (lube / grease addition, checks) can be completed by OZ Minerals staff. All major repairs and maintenance should be complete as a part of the scope of supply.
The scope includes maintenance required to ensure ongoing reliability of the equipment and any fair 'wear and tear' incurred in the course of equipment use. Major damage repairs should be charged to OZ Minerals at a market competitive rate.
If a small maintenance facility is required on site, this may be proposed by the vendor as a component of the scope of supply. The approval of a facility is at the discretion of OZ Minerals and the cost should be borne by the vendor, rolled into the scope of the supply.
|
| | Integrated Project Logistics | 7 Jun 17 | 19 Jun 17 | |
| |
| OZ Minerals is seeking expressions of interest from organisations with demonstrated experience providing an integrated logistics solution for mining operations during the construction stage. Respondents must be able to demonstrate how they have added value to projects through the development and implementation of their solution.
Please download the attachment containing Scope of Works, Schedule 1 Past Project Performance and OZ Minerals Carrapateena pre-qualification documents. |
| | Minor Site Earthworks and Civils Support - Carrapateena Mine Site | 24 Aug 18 | 10 Sep 18 | |
| |
| OZ Minerals is seeking expressions of interest for minor site earthworks & civils support at the Carrapateena mine site, including clear & grub works, earthworks, establishing work lay down areas.
|
| | OZ Minerals - Carrapateena Project - General | 24 May 17 | 29 Jul 19 | |
| |
| Submitting an EOI to this work package includes your business in the mailing list for general updates about the Carrapateena project. |
| | RFI Supply of Labour Hire Services Employment and Training Programs | 22 Nov 17 | 8 Dec 17 | |
| |
| OZ Minerals is seeking to partner with a local provider, supporting the Carrapateena Project to maximise employment from the Upper Spencer Gulf, Far North and regional South Australia. |
| | Site Installation of Fencing - Carrapateena Mine Site | 24 Aug 18 | 10 Sep 18 | |
| |
| OZ Minerals is seeking expressions of interest for supply and installation of fencing at the Carrapateena mine site. |
| | Steel Fabrications - Carrapateena Mine Site | 24 Aug 18 | 10 Sep 18 | |
| |
| OZ Minerals is seeking expressions of interest for off-site minor steel fabrication works, as required, at the Carrapateena mine site, including raisebore hole covers, settling pond evaporation spray bars, emergency response training facilities, etc
|
| | Surface Crushing - Carrapateena Mine Site | 15 Jan 19 | 1 Feb 19 | |
| |
| Commencing in July 2019, ore will be mined from the underground sub level cave and trucked to surface where it will be stockpiled prior to concentrator commissioning. Trucking to surface will continue until April 2020 when the underground materials handling system and crusher will be commissioned. Concentrator commissioning will commence in Q4 CY2019 and operate in a campaign mode until ore supplies are sufficient to justify continued operation.
This scope of work covers the surface crushing and material movement activities to support the period between first ore mined and commissioning of the underground materials handling system.
Further information is available in the attachment titled "Scope Of Services - Surface Crushing - Carrapateena Mine Site".
|
| | Transport Interstate - Carrapateena Mine Site | 4 Sep 18 | 25 Sep 18 | |
| |
| OZ Minerals is seeking expressions of interest for road haulage of goods from Interstate to the Carrapateena site.
|
| | Transport within South Australia - Carrapateena Mine Site | 4 Sep 18 | 25 Sep 18 | |
| |
| OZ Minerals is seeking expressions of interest for road haulage of goods from the Upper Spencer Gulf and Adelaide areas to the Carrapateena site. |
| | Water Tankage - Carrapateena Mine Site | 24 Aug 18 | 10 Sep 18 | |
| |
| OZ Minerals is seeking expressions of interest for supply and operation of water tankers during decline development at the Carrapateena mine site.
|
| | Western Access Road - Carrapateena Mine Site | 26 Aug 19 | 19 Sep 19 | |
| |
| OZ Minerals is scheduled to undertake a Greenfields construction of a 55km Western Access Road to support the Carrapateena Operation.
The scope of work includes:
- Bulk earthworks;
- Granular pavement construction;
- Detailed drainage and earthworks, including scour protection;
- Insitu concrete construction of floodway drainage structures;
- Mechanical protection of existing in-ground third party assets;
- Establishment of a DPTI standard intersection at the Stuart Highway; and
- Supply and establishment of infrastructure to support construction activities.
With detailed design well-advanced, it is anticipated that initial market enquiries will be called October 2019, with construction scheduled to commence in January 2020.
To express interest in this work package, please complete the attached OZ Minerals Pre-Qualification Questionnaire and submit at the icon located under the section titled 'Full Scope EOI'. |
| | Closed Tender - Drilling Services - Water Exploration & Wellfields | 19 Jun 17 | 29 Jun 17 | | 
| |
| The purpose of the RFT is to obtain a pricing proposal for the provision of Drilling services water exploration and wellfields. |
| | Closed Tender - Provision of Diesel Fuel Services | 3 Oct 17 | 13 Oct 17 | |
| |
| Carrapateena Project has issued a tender for the provision of diesel fuel services and temporary tanks on site. The tender will close on 9th October 2017. Tenderers were selected from the Expressions of Interest submitted via the OZ Minerals ICN Gateway Portal. The successful tenderer will be published once the contract has been executed. |
| | Closed Tender - Provision of Waste Management Services | 3 Oct 17 | 20 Oct 17 | |
| |
| This scope of work covers the provision of plant, equipment and personnel to provide Waste Management Services (Services) to OZ Minerals Carrapateena project site for the duration of the project. The tender closes 20th October 2017. Tenderers were selected from the Expressions of Interest submitted via the OZ Minerals ICN Gateway Portal. The successful tenderer will be published once the contract has been executed. |
| | Closed Tender - Underground Mining Services | 16 Oct 17 | 31 Oct 17 | |
| |
| This scope of work covers the provision of underground development and mining services to OZ Minerals Carrapateena. The tender closes 20th October 2017. |
STATUS
|
|
CARRAPATEENA MINE CONNECTION-ELECTRANET ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Closed Tender - Hill to Hill Connection Project | | | |
| |
| Full scope has been awarded to:UGL Pty Limited | Matthew Gorman Project Manager, Utilities & Resources T: +61 (7) 4971 6721 Email: matthew.gorman@ugllimited.com
Level 6, 199 Grey Street SOUTH BRISBANE QLD 4101
|
ElectraNet has issued a select tender for the Design and Construct of approximately 135km of single circuit 275 kV transmission line, 130 km of 132 kV transmission line and two switching stations. |
| | ElectraNet - Carrapateena Mine Connection - Closed RFT | | | |
| |
| Full scope has been awarded to:Ventia Utility Services Pty Ltd | Chris Connell Business Development Manager T: +61 (3) 9861 8190 E: chris.connell@ventia.com.au
25-37 Huntingdale Road BURWOOD VIC 3125
|
Closed RFT |
STATUS
|
|
CORPORATE ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Closed EOI - Sustainable Energy Partnership | 22 Sep 16 | 2 Oct 16 | 2 Oct 16 |
| |
| Restricted EOI process |
STATUS
|
|
GENERAL OPERATIONS ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | OZ Minerals - Ongoing Operations - General updates | 23 Nov 15 | 23 Nov 19 | | 
| |
| Submit an EOI to be included in a mailing list for general updates, for example general industry briefings. |
STATUS
|
|
PROMINENT HILL ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Provision of Fire Protection Maintenance Services | | | |
| |
| Full scope has been awarded to:Paul Wright Contracting | www.fireextinguisherguy.com.au
|
OZ Minerals requires a Contractor to provide reliable maintenance and breakdown repairs services for the fire detection and protections systems and equipment located at our Prominent Hill mine site.
This Scope of Work includes servicing of fire detection and protection systems and equipment installed in the site accommodation village, and in all operational areas of Prominent Hill mine site under OZ Minerals' directional control. |
| | Provision of Occupational Hygiene Services at OZ Minerals Prominent Hill Mine Site | 10 Oct 17 | 25 Oct 17 | |
| |
| OZ Minerals Prominent Hill Operation is inviting contractors to participate in this Expression of Interest (EOI) with the potential outcome being to engage the services of a Contractor with suitably qualified and experienced personnel to provide Occupational Hygiene Services to its mine site. |
| | Request for Proposal - Provision of Road Maintenance Services at OZ Minerals Prominent Hill site | 13 Dec 17 | 9 Jan 18 | |
| |
| OZ Minerals Prominent Hill Operation is inviting contractors to participate in this Request for Proposal as part of its commitment to unlock value through trusted relationships, mining and metallurgical processing excellence, our social performance and innovative thinking.
OZ Minerals Prominent Hill Operation is seeking to engage a qualified and experienced contractor to maintain OZ Minerals unsealed road network to an acceptable standard that reflects traffic requirements of volume and speed.
In parallel, road maintenance activities serve a function to Site and surrounding properties to reduce dust levels for safety and environmental benefits.
See attached zip folder containing further information and instructions on submitting your proposal.
Please refer to the two questions and answer summaries which contain the latest questions and answers provided in regards to this process.
Please ensure that you also download the Road Design and Construction Management Plan which is relevant to this process, and the associated attachment which contains information indicative of the raw water quality at Prominent Hill.
|
| | Request for Proposal - Provision of Water Treatment Chemicals and Associated Services | 12 Apr 18 | 10 May 18 | |
| |
| OZ Minerals Prominent Hill Operation is inviting potential contractors to participate in this Request for Proposal (RFP) for the Provision of Water Treatment Chemicals and Associated Services to OZ Minerals Prominent Hill mine site.
This RFP opportunity is part of OZ Minerals' commitment to unlock value through trusted relationships, mining and metallurgical processing excellence, our social performance and innovative thinking.
OZ Minerals Prominent Hill Operation has an ongoing requirement for the provision of water treatment chemicals and associated services to support its facilities on site. Quality, safety and reliability, are key requirements for the goods and services required. OZ Minerals is looking to collaborate with a contractor who will deliver significant value to the business in terms of both efficiencies and cost savings in regards to the goods and services required.
. |
| | Request for Tender - Provision of Services for the Maintenance of Refrigeration and Air Conditioning | 11 Apr 18 | 2 May 18 | |
| |
| OZ Minerals Prominent Hill Operation is inviting potential contractors to participate in this Request for Tender (RFT) for the provision of services for the maintenance of refrigeration and air conditioning systems at OZ Minerals Prominent Hill Operation.
This RFT opportunity is part of OZ Minerals' commitment to unlock value through trusted relationships, mining and metallurgical processing excellence, our social performance and innovative thinking.
OZ Minerals Prominent Hill Operation has an ongoing requirement for maintenance services to support the refrigeration and air conditioning systems operating on site. Maintaining these systems to a high quality standard so that they operate effectively and efficiently are key requirements for the services required. OZ Minerals is looking to collaborate with a contractor who will deliver significant value to the business in terms of both efficiencies and cost savings in regards to the services required.
|
| | Relocation of ERT and Medical Centre + Refurb/Fit-Out of New Building on site at Prominent Hill | 13 Feb 17 | 27 Feb 17 | 27 Feb 17 |
| |
| OZ Minerals Prominent Hill Operation is inviting contractors to participate in this Expression of Interest (EOI) with the potential outcome being to engage a suitably qualified and experienced contractor to undertake works on site to relocate the Emergency Response Team (ERT) and the Medical Centre (which includes laboratories for the environment and hygiene teams located on site), and refurbish/fit-out an established building on site to house those groups contained in the existing building. |
| | Inspection Services for Pressure Vessels located on site at Prominent Hill | 22 Feb 17 | 8 Mar 17 | 8 Mar 17 |
| |
| OZ Minerals Prominent Hill Operation is inviting contractors to participate in this Expression of Interest as part of its commitment to unlock value through trusted relationships, mining and metallurgical processing excellence, our social performance and innovative thinking.
OZ Minerals Prominent Hill Operation is seeking to engage an expertly qualified and experienced contractor to inspect/review and provide improvement recommendations on the current operating condition/state, maintenance and operation of all pressure vessels at OZ Minerals Prominent Hill operation.
Please see attached list of all operational pressure vessels on site at Prominent Hill. |
| | Confined Space Monitoring at Prominent Hill | 8 May 17 | 22 May 17 | 22 May 17 |
| |
| OZ Minerals requires the ongoing provision of monitoring confined spaces and gas testing services by qualified, suitably experienced and skilled personnel at OZ Minerals Prominent Hill mine site.
This scope of work covers the provision of monitoring services for confined spaces and gas testing of these spaces at the OZ Minerals Prominent Hill Processing Plant, as and when required.
Additional Services may be supplied to other site departments under these contractual terms and conditions, however, provision of any monitoring of confined spaces and/or gas testing shall be the subject of a supplementary scope of work on each occasion.
Services shall include both: ongoing day to day operational monitoring of confined spaces and gas testing, and increased monitoring of confined spaces and gas testing during the processing plant shutdowns.
|
| | Restricted Request for Tender - Stage 4 Tailings Storage Uplift | 21 Nov 16 | 15 Dec 16 | |
| |
| Please see attached. |