KEPCO Bylong Coal Project



Contact Details


Jerone Bodiam - ICN
Regional Manager, Central West
+61 2 9927 3110
 CONTACT EMAIL

Industry Capability Network
+61 2 9927 3100
+61 2 8920 1856
 CONTACT EMAIL

  Locations: NSW Australia
  Project Status: Seeking approvals
  Project Owner KEPCO BYLONG AUSTRALIA PTY LTD

Project Details


KEPCO proposes to develop the Bylong Coal Project, located approximately 55 km north-east of Mudgee and 53 km from Denman in New South Wales, Australia. The purpose is to extract, wash and export coal. The Bylong Coal Project proposes to supply 6.5 million tonnes (ROM) of thermal coal per annum to the export market. The mine will cover an area of approximately 3,000 ha and will include two open-cut mining areas and an underground mining area.

The mine is likely to employ up to 665 people during construction and maintain a workforce of approximately 290 people during operations.

The life of mine is expected to be approximately 25 years, with open-cut operations commencing around year 4 and operation of an underground mine commencing afterwards at around year 7. Coal will be transported from the Project site to the Port of Newcastle via rail, which will require the construction of a dedicated rail loop connecting to the existing Sandy Hollow-Gulgong Line.

SHOW LESS

Work Packages


There are currently no open work packages for this project.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   EQUIPMENT - OPERATIONS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Coal Bins29 Sep 201530 Sep 201930 Sep 2019
Loading coal trains.
Load coal waste to trucks.
CPP feed surge bin
Coal Preparation - Dewatering29 Sep 201530 Sep 201930 Sep 2019
Centrifuges, Thickener and Belt Filter Press
Coal Prep Plant (CPP) Excluding Dewatering29 Sep 201530 Sep 201930 Sep 2019
Complete CPP Plant, Including CPP primary washing equipment (Mechanical, Electrical, Instrumentation, CPP Surge Bin)
Communications equipment20 Jun 201730 Sep 201930 Sep 2019
Communications equipment
Substations - Switchgear and Cabling (Underground)29 Sep 201530 Sep 201930 Sep 2019
Underground Power - up to 11kv - and Control systems
Substations Switchgear Cables29 Sep 201530 Sep 201930 Sep 2019
Supply of HV and LV power to site,including transmission towers and reticulation around site
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Above-ground Mine Infrastructure23 May 201730 Sep 201930 Sep 2019
e.g. concreting, road works, office accommodation, fencing, water reticulation
Civils - Bulk earthworks20 Jun 201730 Sep 201930 Sep 2019
Civils - Bulk earthworks
Civils - Dams20 Jun 201730 Sep 201930 Sep 2019
Civils - Dams
Civils - Roads20 Jun 201730 Sep 201930 Sep 2019
Civils - Bulk earthworks