FULTON HOGAN CONSTRUCTION PTY LTD

COCOS (KEELING) ISLANDS AIRFIELD UPGRADE PROJECT

location_onWA Australia
location_on

WA Australia

business

FULTON HOGAN CONSTRUCTION PTY LTD

Project Primary Contact
person_outline
Hengameh Kiani
phone_enabled
+61 8 9365 7543
Overview

Introduction

Fulton Hogan Construction Pty Ltd (IMC) is inviting companies to submit an Expression of Interest (EOI) for the Bulk Logistic Package associated with the Cocos (Keeling) Island (CKI) Airfield Upgrade Project. CKI are an external territory of Australia located in the Indian Ocean Territory (IOT), consisting of 27 coral islands that form two atolls, situated approximately 3000kms northwest of Perth, Western Australia (WA) and 900km from Christmas Island.

The IMC's intention is to have tender documents available and issued from 12 April 2024, and will be seeking to have all tenders received by close of tender being 7 June 2024.

Brief Scope of Services

The IMC has been engaged by the Department of Defence to undertake the R8129 - CKI Airfield Upgrade Project (Project). The Project involves upgrading the CKI Airfield by:
Runway 15 / 33 strengthening, widening and turning nodes.
Taxiway A, B, C and D strengthening and widening.
Apron strengthening and widening.
Improving Civil Aviation Safety Authority compliance.
Runway extension.


The Project also involves significant enabling Scope of Work (SOW) to support airfield construction activities, including the delivery of a dedicated Material Offloading Facility (MOF), temporary accommodation camp, extensive temporary construction facilities and associated services.
The Bulk Logistics package is a critical component for the successful delivery of the Project. The scope of works (SOW) includes transport of bulk aggregate material (circa 279,000 tonnes) from Ports in Perth and / or Geraldton Western Australia to CKI. The package includes the successful Subcontractor chartering the specific vessels required to meet the CKI lagoon draft depth, management of the port operations and coordination of loading / unloading of the aggregate materials.

1
Total work package
1
Other work package
1
Total work package
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Closed
Full scope EOI closes on
08 Mar 2024
Partial scope EOI closes on
08 Mar 2024

Please refer to the SOW for further details pertaining to the package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.