SUBSEA 7 AUSTRALIA CONTRACTING PTY LTD

BAROSSA PROJECT - TRANSPORTATION AND INSTALLATION OF SUBSEA UMBILICALS RISERS AND FLOWLINES (SURF)

location_onNT Australia
location_on

NT Australia

business

SUBSEA 7 AUSTRALIA CONTRACTING PTY LTD

Project Primary Contact
person_outline
Industry Capability Network (NT)
phone_enabled
+61 8 8922 9422
Project Secondary Contact
person_outline
Vishnu Nagadeven
Project SCM Specialist
phone_enabled
+61 8 9326 0601
Overview

About Subsea 7

Subsea 7 is a global leader in the delivery of offshore projects and services for the evolving energy industry. The company creates sustainable value by being the industry's partner and employer of choice to deliver the efficient offshore solutions the world needs. Project management, engineering and construction expertise are provided across the full field lifecycle. These services are delivered to clients in the Oil & Gas and Renewables sectors.


About the project

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos NA Barossa Pty Ltd (Santos) as Operator, Santos Offshore Pty Ltd and SK E&S Australia Pty Ltd.

As part of the Barossa Offshore Project, Santos has selected Subsea 7 as the contractor to provide the Transportation and Installation of Subsea Umbilicals Risers and Flowlines (SURF).

Subsea 7's scope of work includes the following:

  • Project management and engineering to complete the following works;
  • Procurement of 14" and 6" linepipe and bends for flowlines, Flowline End Terminations (FLETs) and tie-in spools;
  • Coating of 14" and 6" linepipe and bends for flowlines, FLETs and tie-in spools;
  • Design and procurement of concrete mattresses and scour mitigation systems;
  • Design, fabrication, transportation and installation of FLETs, Displacement Initiators (DIs) and Riser Tether Bases (RTBs);
  • Fabrication at onshore spool base, transportation and reel-lay installation of flowlines;
  • Fabrication, transportation and installation of export spools, tie-in spools and well jumpers;
  • Transportation and installation of all Client Provided Items (CPI) - manifolds, risers, umbilicals, flexible jumpers and flying leads;
  • Pre-commissioning of subsea system.


Procurement and subcontracting

Subsea 7 shall execute the project by sourcing the best commercial and technically delivered solution to satisfy the company's business needs without compromising safety, quality or the environment.

Subsea 7 is committed to supporting the Santos' Barossa Australian Industry Participation (AIP) Plan to ensure all suppliers are given a Full, Fair and Reasonable Opportunity to participate in the development of the Barossa Project. Subsea 7 will comply with all the requirements as stated in the Barossa AIP Plan and the Australian Jobs Act 2013 throughout the project.


Pre-Qualification Process

All Suppliers must undergo a pre-qualification process. Depending on the nature and complexity of supply, the pre-qualification process may involve an assessment of a Supplier's financial standing, technical capability, Quality, and Health, Safety & Environmental track record.

From mid-2021 onwards, all pre-qualifications will be conducted online via SAP Ariba. In addition, potential suppliers shall be provided with an invitation to complete a Supplier Pre-Qualification Questionnaire subsequent to initial screenings.


Please be advised that when submitting an EOI, all potential suppliers must provide a completed "Initial Screening Questionnaire" for EACH work package. This will assist Subsea 7 in identifying suitable potential suppliers more efficiently prior to proceeding with pre-qualification.


Subsea 7 Code of Conduct for suppliers

Subsea 7 is committed to operating honestly and with integrity, additionally complying with all applicable laws in all jurisdictions in which they operate. Subsea 7 requires all Suppliers to do the same. Expectations are outlined in the "Our Code of Conduct for Suppliers", which can be found within the Project Documents section.


Contact details:

Further details on the Project and associated opportunities can be found at: BarossaOffshore.icn.org.au

19
Total work packages
1
Open work package
18
Other work packages
19
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Miscellaneous
Status
Open
Full scope EOI closes on
31 Dec 2024

Express interest to be notified of any updates or opportunities that may arise.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Work Packages
Status
Cancelled
Full scope EOI closes on
26 Jul 2021
Partial scope EOI closes on
31 Mar 2022

This WP has been combined with BAR-008 and BAR-009 Pre and Post Metrology Spools

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Cancelled
Full scope EOI closes on
26 Jul 2021
Partial scope EOI closes on
31 Mar 2022

See attached scope of work and zip file for additional information This package has been cancelled and now been combined with BAR-007 FLET Fabrication.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Cancelled
Full scope EOI closes on
12 Jul 2021
Partial scope EOI closes on
30 Jun 2022

This WP was combined with BAR-020 Riser Tether Bases as a single package

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Cancelled
Full scope EOI closes on
12 Jul 2021
Partial scope EOI closes on
31 Dec 2022

This package has been cancelled.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
10 Feb 2022
Partial scope EOI closes on
28 Feb 2022

This work package has been awarded to the below company.

Awarded Company
Flow Subsea Ltd
Unit 384D, Jedburgh Court
Gateshead NE11 0BQ
United Kingdom

Contact: David Blenkinship
Email: David.Blenkinship@flowsubsea.co.uk
Phone: +44 7743 679 188

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
12 Jul 2021
Partial scope EOI closes on
31 Mar 2022

The award of this package has been split in two. Details of the award are as follows:

BAR-007A - FLETs and PLRs
Awarded to:
PTSC Offshore Services Joint Stock Company
65A, 30/4 Street, Thang Nat Ward
Vung Tau City, Vietnam

PIC: Phung Sy Bac, bacps@ptsc.com.vn

Date of award: 16 June 2022

BAR-007B - Mudmats
Awarded to:
PT Singatec Bintan
Lot 2, Bintan Industrial Lobam,
Bintan, Kepulauan Riau - 19154,Indonesia

PIC: Desmond Chew, desmond@singatec.com.sg

Date of award: 15 July 2022

Awarded Companies
PT Singatec Bintan
PT Singatec Bintan
PTSC Offshore Services JSC
PTSC Offshore Services JSC

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
02 May 2022
Partial scope EOI closes on
02 May 2022

This work package has been awarded to the below company.

Awarded Company
BigLift Shipping B.V.
Radarweg 361042
AA,Amsterdam,Netherlands

Contact: David Lynn (acting as agent)
Email: davidlynn@allwayship.com.au

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
15 Jun 2022
Partial scope EOI closes on
15 Jun 2022

This scope of work originally incorporated 3 separate packages: Pre-Metrology Spools Fabrication (BAR-008), Post-Metrology Spools Fabrication (BAR-009) and Well Jumper Prefabrication (BAR-011). BAR-008 and BAR-009 scopes require similar competencies and capabilities, and hence issued as a single enquiry. See attached scope of work and zip file for additional information. BAR-011 was issued as a separate package but subsequently cancelled and combined with this package - refer separate listing for details on this package. This combined package has now been awarded to a single contractor.

Awarded Company
PT Singatac Bintan
Address: Lot 2, Bintan Industrial Lobam,
Bintan, Kepulauan Riau - 19154,Indonesia
Contact: Desmond Chew
Email: desmond@singatac.com.sg

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
26 Jul 2021
Partial scope EOI closes on
30 Jun 2022

Details of the successful subcontractor are as follows:
PIC: Ethan O' Rourke,
Email: eorourke@enermech.com

Awarded Company
EnerMech Pty Limited
location_on
923 Cockburn Road HENDERSON WA 6166 Australia
phone_enabled
+61 8 6555 6560

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
12 Jul 2021
Partial scope EOI closes on
30 Jun 2022

See attached scope of work and zip files for additional information.

Awarded Company
PT Singatac Bintan
Lot 2, Bintan Industrial
Lobam
Bintan,Kepulauan Riau

Contact: Desmond Chew
Email: desmond@singatac.com.sg

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
12 Jul 2021
Partial scope EOI closes on
30 Sep 2022

The award of this package has been split in two. Successful companies can be seen below:

Awarded Companies
Seabed Scour Control Systems Ltd
location_on
Harfrey's Road Norfolk England NR31 0LS United Kingdom
phone_enabled
+44 1493 44 3380
Subsea Protection Systems (Far East) PTE LTD
Subsea Protection Systems (Far East) PTE LTD

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
29 Jan 2022

This work package has been awarded to the below company.

Awarded Company
Blue Logic AS
location_on
29 Luramyrveien Sandnes Rogaland 4313 Norway
phone_enabled
+47 95 27 1071

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
02 Sep 2022

Details of the successful subcontractor are as follows:

Awarded Company
BigRoll Shipping B.V.
Location: Fascinatio Boulevard 1242 Rotterdam, Capelle aan den Ijssel
Zuid-Holland, 2909 VA Netherlands
Contact: Gijsbert van Wijngaarden,
Phone: +31 10 2701450
Email: gijsbert.vanwijngaarden@roll-group.com

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
30 May 2023

This work package has been awarded to the below company.

Awarded Company
MMA OFFSHORE LIMITED
location_on
12-14 The Esplanade PERTH WA 6000 Australia
phone_enabled
+61 08 6242 2222

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Awarded
Full scope EOI closes on
23 Sep 2023

This package has been split and will be awarded to numerous companies to be announced progressively in line with the award time frame. Details of the successful companies and their scopes are provided below

Awarded Companies
INTEGR8 FUELS AUSTRALIA PTY LTD
location_on
The Esplanade Exchange Tower Perth WA 6000 Australia
phone_enabled
+61 04 3729 1654
DAN-BUNKERING (AUSTRALIA) PTY LTD
location_on
50 Clarence Street Level 6 Suite 604 Sydney NSW 2000 Australia
phone_enabled
+61 02 8270 7300

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Jul 2021
Partial scope EOI closes on
30 Mar 2022

See attached scope of work for additional information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
13 Jul 2023
Partial scope EOI closes on
13 Jul 2023

Please refer to attached scope document for further information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
05 Oct 2023

Please refer to the attached scope documentation for further information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.