STANDARD LISTINGS ▲ CONTRACT
|
STATUS
|
|
ANY OPPORTUNITIES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | Tanami Expansion - General Updates | 30 Mar 2020 | 31 Jul 2021 | | 
| | |
| .Express interest to be kept up to date with this project |
STATUS
|
|
CLOSED PACKAGES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | P4057 - Lighting | | | | 
| | |
| P4057 Lighting |
| | Additional Kitchen Diner Modules | | | | 
| | |
| Full scope has been awarded to:Additional Kitchen Diner Modules |
| | Architectural Master Planning | | | | 
| | |
| Full scope has been awarded to:MJA Studio | Suite 6 / 23 Railway Road Subiaco, WA 6008 Phone: (08) 9388 0333 Web: www.mjastudio.net
|
Architectural Master Planning |
| | Boreline Installation | | | | 
| | |
| Full scope has been awarded to:Boreline Installation |
| | Camp Refurbishments | | | | 
| | |
| Full scope has been awarded to:Camp Refurbishments |
| | HV Cable Supply | | | | 
| | |
| Full scope has been awarded to:MESWA | 10 Inverness St Malaga 6090 WA Phone: 1300 209 690 Email: admin@meswa.com.au Web: meswa.com.au
|
HV Cable Supply |
| | Landscape Architecture | | | | 
| | |
| Full scope has been awarded to:Landscape Architecture |
| | P4006 - Winder Rope Sheaves | | | | 
| | |
| Full scope has been awarded to:Kimberly Engineering Works Pty Ltd | 170 Phakamile Mabija Road Turner Road Industrial Area, Kimberley, Northern Cape, Republic of South Africa Phone: +0027 538 410 474 Email: jaime@kewfoundries.co.za Web: www.kewfoundries.co.za
|
P4006 Winder Rope Sheaves |
| | P4013 - Shaft Steel and Guides | | | | 
| | |
| Full scope has been awarded to:P4013 Shaft Steel and Guides |
| | P4014 - Fixed Rock Breaker | | | | 
| | |
| Full scope has been awarded to:P4014 - Fixed Rock Breaker |
| | P4016 - Apron Feeders | | | | 
| | |
| Full scope has been awarded to:P4016 Apron Feeders |
| | P4035 - Headframe Elevator | | | | 
| | |
| Full scope has been awarded to:P4035 Headframe Elevator |
| | P4038 - EOT Cranes | | | | 
| | |
| Full scope has been awarded to:EILBECK CRANES | 28 Jackson Street, Bassendean 6054 WA Phone: +61 (08) 9279 4800 Web: www.eilbeckcranes.com
|
P4038 EOT Cranes |
| | P4067 - Radial Stacker | | | |
| | |
| Full scope has been awarded to:The purpose of this package is for the supply and delivery of the Radial Stacker conveyor CV-204. |
| | P4071 - Vibrating Feeder and Feed Chute | | | | 
| | |
| Full scope has been awarded to:P4071 Vibrating Feeder & Feed Chute |
| | P4100 - Clamping and Lifting Device | | | | 
| | |
| Full scope has been awarded to:P4100 Clamping and Lifting Device |
| | P4007 - Rope Handling Equipment | 09 Jun 2020 | 30 Jun 2020 | | 
| | |
| The purpose of this package is to procure the design, supply and delivery of the rope handling equipment required for the TE2 rope installation/replacement. |
| | P4017 - Conveyors (Underground and Surface) | 09 Jun 2020 | 30 Jun 2020 | |
| | |
| The purpose of this package is for the supply of conveyors' structural steelwork and conveyor equipment for the surface and underground materials handling systems. |
| | P4028 - Compressors | 02 Sep 2020 | 12 Sep 2020 | | 
| | |
| P4028 Compressors |
| | P4036 - Underground Dirty Water Pumping System | 09 Jun 2020 | 30 Jun 2020 | |
| | |
| The purpose of this package is for the supply and delivery of two Positive displacement piston diaphragm pumps, charge pumps (if applicable), complete with cooling units, pulsation dampeners, pressure relief valves, drives, gearboxes and couplings. |
| | P4072 - Dust Suppression System | 09 Jun 2020 | 30 Jun 2020 | |
| | |
| The purpose of this package is for the supply of Dust Suppression Systems |
| | P4088 - Oil Separator | 02 Sep 2020 | 12 Sep 2020 | |
| | |
| The scope of work covers the
. Design of the oil separator system
. Supply, manufacturing, testing and delivery to site of equipment
. Supervision of installation and commissioning assistance, inspection and testing of the oil separator. |
| | P4505 - Ontrak Transporter | 02 Sep 2020 | 12 Sep 2020 | | 
| | |
| P4505 Ontrak Transporter |
| | P4509 - Mobile Rock Breaker | 02 Sep 2020 | 12 Sep 2020 | | 
| | |
| P4509 Mobile Rock Breaker |
STATUS
|
|
WORK PACKAGES ▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | S4141 - TE2 Process Plant Upgrade Construction (SMP) | 21 Jan 2021 | 12 Feb 2021 | |
| | |
| The Contractor's Scope of Work is for the procurement, construction, and commissioning support necessary to implement the planned upgrades at the Granites processing facility. Briefly, this work includes: |
| | S4123 - Electrical Consultant (Verification of Earthing) | 15 Jun 2020 | 25 Jun 2020 | |
| | |
| Carry out soil resistivity testing on site, use test data to complete detailed lightning and earthing study designs to Australian Standards based on layout drawings. |
| | C4006 - Pilot Hole and Raisebore | | | | 
| | |
| Full scope has been awarded to:RUC CEMENTATION MINING CONTRACTORS PTY LTD | Unit 3 138 Abernethy Road Belmont, WA Australia 6104 Phone: +61 8 9270 9666 Fax: +61 8 9270 9677 Email: rebeccas@ruc.com.au Web: www.ruc.com.au
|
C4006 - Pilot Hole and Raisebore |
| | C4007 - Bulk Earthworks | | | | 
| | |
| Full scope has been awarded to:C4007 - Bulk Earthworks |
| | C4013 - Modular Building Supply | | | | 
| | |
| Full scope has been awarded to:C4013 - Modular Building Supply |
| | C4016 - Camp Installation Works | | | | 
| | |
| Full scope has been awarded to:C4016 - Camp Installation Works |
| | C4040 - Haul Road Construction | | | | 
| | |
| Full scope has been awarded to:C4040 - Haul Road Construction |
| | C4058 - Camp Building Refurbishment | | | | 
| | |
| Full scope has been awarded to:HTS Constructions Pty Ltd | |
C4058 - Camp Building Refurbishment |
| | General Civil Installation | | | |
| | |
| Full scope has been awarded to:General Civil Installation |
| | P4015 - Gyratory Crusher | | | | 
| | |
| Full scope has been awarded to:P4015 - Gyratory Crusher |
| | P4018 - Headframe | | | | 
| | |
| Full scope has been awarded to:P4018 - Headframe |
| | P4030 - Drum Winder | | | | 
| | |
| Full scope has been awarded to:ABB Australia Pty Ltd | Level 3, 233 Adelaide Terrace PERTH, WA Australia 6000 Email: paul.barclay@au.abb.com Web: www.au.abb.com
|
P4030 - Drum Winder |
| | P4031 - Koepe Winder | | | | 
| | |
| Full scope has been awarded to:ABB Australia Pty Ltd | Level 3, 233 Adelaide Terrace PERTH, WA Australia 6000 Email: paul.barclay@au.abb.com Web: www.au.abb.com
|
P4031 - Koepe Winder |
| | P4096 - Waste Water Treatment Plant | | | | 
| | |
| Full scope has been awarded to:P4096 - Waste Water Treatment Plant |
| | P4104 - Water Bore Equipment | | | | 
| | |
| Full scope has been awarded to:P4104 - Water Bore Equipment |
| | S4122 - Safety in Design (ESM) | | | |
| | |
| Full scope has been awarded to:Engineering Systems Management | 613 / 147 Pirie St Adelaide, SA Australia 5000 Phone: +61 08 7222 6068 Email: info@esmconsulting.com.au Web: www.esmconsulting.com.au
|
The purpose of this package is to facilitate Safety in Design Workshops as required (note this work would be in Perth not on site). |
| | C4018 - Underground Works | 29 May 2020 | 30 Jun 2020 | |
| | |
| The scope of this package covers civil construction, structural, mechanical and piping
(SMP) and electrical (E&I) installation and commissioning for the underground ore
handling system
See attached scope of work for additional information |
| | C4033 - Construction of UG Bins and Silos - REVISED | 29 May 2020 | 21 Jul 2020 | |
| | |
| Please note that this package SOW was revised and re-opened on Monday 6/7/2020. |
| | C4034 - Design and Construct the Surface Refrigeration Plant | 17 Jun 2020 | 29 Jun 2020 | |
| | |
| Design and Construct the Surface Refrigeration Plant with associated cooling towers, surface bulk air cooler (BAC) located at the Production Shaft, BAC force fans as well as overland chilled water pump stations. The Turnkey (Design and Construct) package will include associated process, mechanical, civil, structural, electrical and C&I disciplines. The scope will generally include all detailed engineering design, equipment supply, critical spares, transport to site, construction, construction supervision and commissioning. |
| | C4059 - Miscellaneous Electrical Site Works | 17 Sep 2020 | 28 Sep 2020 | |
| | |
| Scope covers miscellaneous electrical site works. For additional information see scope of work. |
| | C4059 - Site Electrical and Instrumentation Installation Work | 15 Jun 2020 | 25 Jun 2020 | |
| | |
| Scope of this package covers works on site including supply and installation of electrical and communications work as required. Cable Trenching, lighting, DBs, HV cable, generators, fibre, communications equipment, conduit etc. Vendor would be required to mobilise own equipment to site for installation works. |
| | Landscaping Works - TE2 Village | 30 Jul 2020 | 13 Aug 2020 | |
| | |
| As part of the Tanami Expansion Project 2 (TE2), a new village will be developed at the mining operations area known as Dead Bullocks Soak, for now the village is referred to as the DBS Village. The village operates as a residence for personnel and visitors working at the DBS mining operations. The village is expected to have a staged lifespan of up to 20 years. The scope of works includes all soft-scaping and hardscaping for the DBS mine village (design by others). |
| | P4008 - Head and Tail Ropes | 30 Jul 2020 | 11 Aug 2020 | |
| | |
| The scope of work covers the design, supply, manufacturing, corrosion protection, assembly, inspection, testing, certification, shipping, and delivery to site, and final installation inspection on Site of the winder ropes for the Koepe production winder and double drum personnel-riding winder, and all ancillaries and spare ropes. |
| | P4009 - Rope Attachments | 29 Jul 2020 | 07 Aug 2020 | |
| | |
| The scope of work covers the design, supply, manufacturing, fabrication, heat treatment, corrosion protection, assembly, shipping, inspection, testing, certification, and delivery to Site of the rope attachments for the Koepe production winder and double drum personnel-riding winder. |
| | P4010 - Skips Bridles and Flasks | 20 Aug 2020 | 10 Sep 2020 | |
| | |
| The scope of work covers the design, certification, fabrication, heat treatment, inspection, testing, corrosion protection, assembly, packaging, and delivery to Site, of the skips, bridles, and flasks for the Koepe Production Winder |
| | P4011 - Cage and Counter Weight | 20 Aug 2020 | 10 Sep 2020 | |
| | |
| The scope of work covers the design, certification, fabrication, heat treatment, quality assurance, testing, corrosion protection, assembly, factory acceptance test, packaging, and delivery to Site, of the cage and counterweight for the Double Drum Personnel-riding Winder |
| | P4029 - Electrical HV Switchgear | 09 Jun 2020 | 19 Jun 2020 | |
| | |
| The Supplier shall be responsible for the design, supply, commissioning supervision and delivery of the Electrical HV Switchgear, including supply of all labour, equipment and consumables to facilitate the works. |
| | P4034 - Specialised Valves | 09 Jul 2020 | 20 Jul 2020 | |
| | |
| The scope of work covers the design, supply, manufacture, testing and inspection at the Supplier's works and delivery to site of all Specialised Valves and Underground Pressure Reducing Stations. |
| | P4039 - Diesel Storage Tanks and Dispensing Units | 29 May 2020 | 08 Jun 2020 | |
| | |
| The Supplier shall be responsible for the design, supply, commissioning supervision and
delivery of the whole works, including such work as may be required, but not specifically
described here; and will supply all labour, equipment and consumables to facilitate the
works. The scope of this package covers the design, supply, manufacturing, fabrication,
heat treatment, corrosion protection, assembly, shipping, delivery, inspection, testing and
certification of the Diesel Storage Tanks & Dispensing Units.
See attached scope of work for additional information |
| | P4040 - Underground Foam Fire Suppression | 10 Jun 2020 | 20 Jun 2020 | |
| | |
| The Supplier shall be responsible for the design, supply and commissioning of the equipment as outlined above for the Foam Fire Suppression System, including supply of all labour, equipment and consumables to facilitate the works. |
| | P4046 - Temporary Power Supply for Surface Construction | 15 Jun 2020 | 25 Jun 2020 | |
| | |
| The purpose of this package is for the hire or purchase of generators and fuel tanks to support the provision of temporary power requirements on site for associated surface infrastructure during the TE 2 development. |
| | P4050 - Motor Control Centres (MCCs) | 17 Jun 2020 | 06 Jul 2020 | |
| | |
| The Supplier shall be responsible for the design, supply, commissioning supervision and delivery of the equipment as outlined above for the Motor Control Centres, including supply of all labour, equipment and consumables to facilitate the works. |
| | P4051 - UG Transformers | 02 Jul 2020 | 14 Jul 2020 | |
| | |
| The Supplier shall be responsible for the design, supply and delivery of the whole works, including such work as may be required, but not specifically described here; and will supply all labour, equipment and consumables to facilitate the works. |
| | P4058 - Electrical Switchrooms | 15 Jul 2020 | 26 Jul 2020 | |
| | |
| The scope of work covers the supply of UG Transportable Electrical Switchrooms |
| | P4066 - Underground Refuge Chambers | 24 Sep 2020 | 09 Oct 2020 | |
| | |
| The scope of work covers the design, supply, supervision of installation and commissioning assistance of the underground refuge chambers. |
| | P4068 - Headframe and Shaft Arresting Devices | 07 Jul 2020 | 17 Jul 2020 | |
| | |
| The scope of work covers the design, supply, manufacturing, fabrication, heat treatment, corrosion protection, assembly, shipping, delivery to site, inspection, testing, certification, and final installation inspection on site of the arresting devices for the Koepe production winder and double drum personnel-riding winder. |
| | P4070 - Structural Steel | 17 Jul 2020 | 29 Jul 2020 | |
| | |
| The scope of work shall comprise the fabrication of the Plat, Flask Loading, Shaft Bottom and Cranes Structural Steel Works |
| | P4098 - Hydraulic Cylinders and Power Packs | 17 Jun 2020 | 25 Jun 2020 | |
| | |
| The Supplier shall be responsible for the design, supply, delivery, and installation and commissioning assistance of the Hydraulic Cylinders and Power Packs, including supply of all labour, equipment and consumables to facilitate the works. |
| | P4123 - High Voltage and Specialised Cables | 09 Jun 2020 | 18 Jun 2020 | |
| | |
| The scope of work includes all labour, materials and services for the design, supply, manufacture, testing and inspection at the supplier's works, delivery to site and off-loading by Newmont of all HV Power Cables |
| | P4131 - Supply and Fabrication of FRP Sub-Brace BAC Ventilation Cowl | 10 Jul 2020 | 20 Jul 2020 | |
| | |
| The purpose of this document is to provide a Scope of Work associated with the furnishing of all labour, materials and services for the supply, fabrication, shop floor trial assembly, and packaging of the Fibre Reinforced Polymer (FRP) Sub-Brace BAC Ventilation Cowling as specified in the contract documents, as part of the Tanami Production Shaft. |
| | P4501 - General Pumps | 29 May 2020 | 19 Jun 2020 | |
| | |
| P4501 General Pumps |
| | P4506 - Jack Catches | 17 Jul 2020 | 28 Jul 2020 | |
| | |
| The scope of this package covers the design, supply, manufacturing, fabrication, heat treatment, corrosion protection, assembly, inspection, testing and certification shipping, and delivery, of the jack catches, energy absorption buffers and support frames for the Koepe and Double Drum Winders headframe over the travel arresting system |
| | P4507 - Monorails and Winches | 29 May 2020 | 08 Jun 2020 | |
| | |
| P4507 Monorails & Winches |
| | P4508 - Waste Stacker Conveyor (CV205) | 22 Jun 2020 | 03 Jul 2020 | |
| | |
| The Supplier shall be responsible for the design, supply, delivery and commissioning assistance of the whole works as outlined above for the Waste Stacker Conveyor (CV205), including supply of all labour, equipment and consumables to facilitate the works. |
| | S4139 - Comms Engineering Assistance (Specialised) | 15 Jun 2020 | 25 Jun 2020 | |
| | |
| The purpose of this package is to design, configure and implement IT/OT networking equipment to Newmont standards using CISCO equipment. Extensive knowledge of networking and Newmont systems would be required. |
| | S4141 - Process Plant Engineering | 16 Jun 2020 | 24 Jun 2020 | |
| | |
| The Contractor shall be responsible engineering and design of the Facilities as specified including preparation of all drawings, specifications and other documents required for activities to be performed by Contractor, Subcontractors and Vendors to construct, commission and handover the Facilities. The Contractor shall ensure that engineering and design for all systems and subsystems meets the minimum production and performance requirements. |