John Holland Pty Ltd

M7-M12 INTEGRATION PROJECT

location_onNSW Australia
location_on

NSW Australia

business

John Holland Pty Ltd

Project Primary Contact
person_outline
Thuy Ho
Senior Consultant | Sydney and Sydney Surrounds
phone_enabled
+61 2 9927 3100
Overview

John Holland has been awarded the contract to deliver the M7-M12 Integration Project

The total cost of the M7-M12 Integration project is $1.7 billion and will provide a significant economic boost to the Western Sydney region.

The M7-M12 Integration Project will support the growth of Western Sydney by widening the M7 Motorway and delivering a seamless connection to the 16-kilometre M12 Motorway to provide direct access to the new Western Sydney International Airport.

The project will deliver:

- The widening of the M7 Motorway by constructing one additional northbound lane and one additional southbound lane in the median of the M7 to provide three lanes in each direction for 26-kilometres between the M5 Motorway and Richmond Road, excluding the Light Horse Interchange.
- The M7-M12 Interchange, being a connection between the M7 Motorway and the new M12 Motorway.
- Elizabeth Drive Connection that provides a connection to and from the new M12 Motorway and includes the widening of Elizabeth Drive and realigning Wallgrove and Cecil Roads.

Construction on the project commenced in August 2023 for the Elizabeth Drive Connection & M12 Interchange, and late 2023 for the widening component. With work taking approximately three years to complete, the M7-M12 Integration Project is anticipated to open mid-2026.

Delivery of the M7-M12 Integration project will:
- Support the growth of Western Sydney by meeting the demand for road travel
- Improve productivity by reducing journey time on a key freight route
- Reduce stop-start traffic that will improve the safe flow of traffic
- Reduce traffic in the local road network, enabling livable and safe urban communities
- Provide a seamless connection to the 16 kilometer east-west M12 Motorway, and direct access to the Western Sydney International Airport and Western Parkland City growth area
- Provide employment opportunities to the Western Sydney community
- Provide procurement opportunities for small to medium size businesses local to Western Sydney


How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI are listed in the 'Work Packages' tab above. Refer to the EOI User Guide below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance is available through the web links listed below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

8
Total work packages
8
Other work packages
8
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Closed
Full scope EOI closes on
10 Dec 2023

Permanent asphalting and spray seals for road work at Elizabeth Drive Connection/M12.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Dec 2023

Removal of old lines and make new road line marking at Elizabeth Drive Connection.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Dec 2023

Supply and install concrete barriers at Elizabeth Drive Connection/M12.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Dec 2023

Supply of construction steel waste bin of varies sizes mainly for general construction waste. Bins are to be delivered to various site and pickup when full on a periodic interval.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Dec 2023

Supply only of prefabricated for pile cages for the piling works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Dec 2023

Supply and installation of large drainage pits at M7.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Dec 2023

Supply and install bridge steel railing and screens at M12.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Dec 2023

Onsite security personnel required for gate mandate for multiple site day and night.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.