SEYMOUR WHYTE CONSTRUCTIONS PTY LTD

M1 PACIFIC MOTORWAY EXTENSION TO RAYMOND TERRACE - HEATHERBRAE BYPASS

location_onNSW Australia
location_on

NSW Australia

business

SEYMOUR WHYTE CONSTRUCTIONS PTY LTD

Project Primary Contact
person_outline
Dusko Bajic
Industry Manager
phone_enabled
+61 417 323 636
Overview

The Australian and NSW governments are funding the 15-kilometre M1 Pacific Motorway extension to Raymond Terrace. The extension will boost the regional economy and improve connectivity, road transport efficiency and safety for local and interstate motorists.

The M1 extention project will connect the existing M1 Pacific Motorway at Black Hill and the A1 Pacific Highway at Raymond Terrace. The project is located within the city of Newcastle and Port Stephens Concil local government areas and located in the Federal electorate of Paterson.

Once complete, the extension will remove up to 25,000 vehicles a day from key congestion and merge points along this corridor and will help keep freight, commuters and tourists moving.

The project includes 15-kilometres of dual carriageway and provides motorists access from the existing road network from four new interchanges at Black Hill, Tomago and Raymond Terrace. The project is being delivered as two separate packages of work - Northern Package (Heatherbrae Bypass) and Southern Package (between Black Hill and Tomago).

Seymour Whyte has been awarded the five-kilometre northern Heatherbrae Bypass section. The main construction of the Heatherbrae Bypass section is planned to start in October 2023 with the project expected to be open to the public 2028.

The work will be located near the Pacific Highway corridor from Tomago to Raymond Terrace and will include:
- site compound establishment including access roads
- property adjustments / public utility adjustments
- earthworks, drainage and pavement construction
- bridge works
- completion works including safety barriers, signposting, street lighting and landscaping.

Key features of the Heatherbrae Bypass section include:
- five-kilometres of dual-carriageway, with two lanes in each direction connecting the A1 Pacific Highway at Raymond Terrace to the extended M1 Pacific Motorway at Tomago
- a new interchange at Raymond Terrace with northbound on-ramps and southbound off-ramps to and from the Pacific Highway
- realignment of Masonite Road to provide a grade separated overpass
- a main carriageway bridge over Windeyers creek (approximately 170-metres long)
- two bridges over the main carriageway at Masonite Road and the Raymond Terrace interchange.

Organisations who express interest in the project will be contacted by Seymour Whyte if their services could be used and invited to participate in the tender process.

How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

17
Total work packages
17
Other work packages
17
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
01. Civil Work
Status
Closed
Full scope EOI closes on
24 Nov 2023

The demolition of existing structures for the construction of the M1 Extension to Raymond Terrace: Heatherbrae Bypass Project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

The supply, installation and modification of controlled access road fencing, boundary fencing and entry gates to secure the site and adjacent properties during and post construction of the road formation. Works must be in accordance with TfNSW D&C R201 and any other relevant specifications, Design drawings, Standard drawings and Australian Standards.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

The import of predominately General Fill. All transport is subject to a Seymour Whyte Plant Hire or Supply Agreement that includes National Heavy Vehicle Law Requirements and TfNSW Heavy Vehicle Requirements.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Intelligent Technology Systems - associated Civil Works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

The installation of waterborne and thermoplastic linemarking for access road intersections, Motorway and temporary works. Other inclusions are audio tactile linemarking on the main carriageways and ramp, retro reflective raised pavement markers (RRPMS) installations adjacent to all lane, edge and barrier lines and removal of existing line marking by water blasting or grinding (if you have this capability).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Equipment Plant hire (dry) for civil construction works including bulk earthworks, clearing, levelling, compaction, and landscaping.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Equipment Plant hire (wet) for civil construction works including bulk earthworks, clearing, levelling, compaction, and landscaping.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

02. Structures Work
Status
Closed
Full scope EOI closes on
24 Nov 2023

Formwork, reinforcing steel and concrete installation for bridges

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Supply of metal fabrication structure - bridge

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

The supply and installation of bored piles and associated temporary works (working platforms will be prepared by Seymour Whyte), installation of pile cages, management and supply, ordering and delivering of reinforcing steels, concrete and piling testing and the fabrication, supply, welding, installation and removal of temporary casing and of permanent casing where required.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Reinforcing steel - supply and install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

03. Pavement Work
Status
Closed
Full scope EOI closes on
24 Nov 2023

The supply, delivery and placement of asphalt, seals and bituminous products. Other scope includes profiling of key-ins, preparation of surfaces and temporary pavements. All works shall be carried out in accordance with the relevant TfNSW specifications, TfNSW Technical standards current Australian standards, the TfNSW Traffic Control at Worksites (TCAW) Document and relevant Technical Documents, NSW Health and Safety Legislation and in strict accordance with the contract documentation, specifications, Scope of Works and Technical Criteria and drawings.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

04. Finishing Work
Status
Closed
Full scope EOI closes on
24 Nov 2023

Supply and install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Supply and install Fauna Crossing

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Carry out landscaping work as per design (TBC)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Supply and Install signage

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Nov 2023

Supply and install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.