ACEREZ

CENTRAL-WEST ORANA RENEWABLE ENERGY ZONE - (REZ)

location_onNSW Australia
location_on

NSW Australia

business

ACEREZ

Project Primary Contact
person_outline
David Norris
Regional Manager - Central West NSW
phone_enabled
+61 447 800 239
Overview

The Central-West Orana REZ will be serviced by new transmission network infrastructure, including high-capacity transmission lines and energy hubs, which will transfer power generated by solar and wind farms to electricity consumers. This infrastructure will be critical for the successful operation of the REZ. EnergyCo is leading the development of the REZ transmission network infrastructure in its capacity as the Infrastructure Planner for the REZs in NSW, and is responsible for developing and overseeing the planning and approval processes for the REZ network infrastructure.


EnergyCo has selected ACEREZ as the first ranked proponent as Network Operator for the Central-West Orana REZ. ACEREZ is sponsored by Acciona, Cobra and Endeavour Energy. For more information on the CWO REZ, please visit Central-West Orana Renewable Energy Zone.

https://www.energyco.nsw.gov.au/cwo-rez


As the network operator, ACEREZ will be responsible for designing, financing, building, operating and maintaining the network infrastructure for the clean energy zone. The infrastructure will include energy hubs and new high-capacity transmission lines.


Centred around the town of Dubbo, the Central-West Orana REZ was originally expected to deliver 3 GW of new solar, wind and storage capacity but that appears certain to be revised.

67
Total work packages
7
Open work packages
60
Other work packages
67
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Open
Full scope EOI closes on
10 May 2024

ACCIONA & Cobra Joint Venture invites established and emerging Indigenous artists with a connect to Wiradjuri, Wailwan and Kamilaroi to submit an expression of Interest (EOI) t design and develop an original and authentic digital design. The license and all rights for the artistic design will be owned by ACCIONA & Cobra Joint Venture, the company engaging the artist.

Please include the following information in your submission:

. Examples of previous artistic works
. A statement regarding your connection to Wiradjuri, Wailwan and Kamilaroi

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 May 2024

The Project involves the design, procurement and construction of a water treatment and disposal solution for the overall project. the contractor will be required tp provide a water treatment solution that will allow for water sourced from several locations, including local water bores and nearby rivers, to acceptable drinking water standards. the Contractor shall also be required to provide a washwater treatment and disposal solution that includes a disposal method for treated greywater (irrigation fields or otherwise). The main Project accommodation village will be a 1200 bed facility located at Merotherie. Second Accommodation Village with 300 beds will be situated at Neelay's lane. Contractor's water treatment and sewerage treatment facilities will be built at these locations.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 May 2024

We invite expressions of interest from qualified consultants to conduct a comprehensive analysis and reporting on the communication landscape for the Central West Orana Renewable Energy Zone (CWO REZ) in and around Merotherie, NSW . The selected consultant will be responsible for producing a detailed report providing insights and actionable recommendations for communication capabilities across key locations, alignment easements, and other requirements as defined in our project documentation, as well as the entire renewable energy zone. This report must address both current and future communication needs, ensuring long-term effectiveness. Additionally, the consultant must propose solutions that can navigate challenging terrains within the designated Project Boundary, supporting remote operations vital for project success. This project offers an opportunity to contribute to the development and implementation of advanced, efficient communication systems essential for operational success in a remote area

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 May 2024

The Supplier will be required to supply, delivery, install, commission, maintain and de-commission the Generators for use in the camp accommodation for Central-West Orana Project. The main Project accommodation village will be a 1200 bed facility located at Merotherie. Second accommodation village with 300 beds will be situated at Neeleys Lane.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
12 May 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Equipment to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
19 May 2024

Build website for ACEREZ Project.

TECHNICAL REQUIREMENTS
. Domain and hosting
. Maintenance/back end operations of the site
. Security and privacy
. Social media integration
. Ease of use on mobile devices and on desktops
. SEO- (search engine optimisation) friendly
. Customisation options
. Tracking tools
. Web browser compatibility
. Website speed
. Usability
. Functionality and navigation
WEBSITE GOALS
To provide up-to-date information about construction of the project
To comply with regulatory and planning approvals
To build brand awareness
To showcase the contractor's expertise in major infrastructure projects and the transition to renewable energy
To build community trust
To help build relationships with stakeholders
To provide an accessible, easy to navigate, engaging website
To provide a jobs portal to actively recruit workers for the project
To provide a guide to training and apprentice opportunities on the project
To provide a portal for local procurement

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
19 May 2024

The Consultant will assist with preparation of sustainability documentation for the Project, as directed by the Head Contractor's Environment and Sustainability Manager.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The supply and delivery of drainage materials, including, but not limited to: HDPE pipes and fittings; culverts.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The supply and delivery of construction related signage including site naming, wayfinding signage, construction signs.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The Scope of Works includes the identification, testing, safe handling, and removal of naturally occurring asbestos present across the project alignment in accordance with Project Technical Specifications and Legislation. The subcontractor shall provide, but not limited to, all management, supervision, transportation, plant, equipment, materials, and personnel necessary to complete the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The supply and delivery of precast cattle grids.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Mar 2024

Detailed survey and report into the current condition of the Building for the Central West Orana Renewable energy Zone project

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Detailed survey and report into the current condition of the Road for the Central West Orana Renewable energy Zone project

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
02 Apr 2024

Conducting land survey for the Central West Orana Renewable Energy Zone Project

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2024

Plant Hire and Equipment - Wet and Dry Hire

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 Mar 2024

The scope of work includes fencing on the site for the Central West Orana Project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
02 Apr 2024

The works in this package comprises of the supply and delivery of concrete to the Central-West Orana Project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Supplier will be required to supply and deliver concrete across the Central West Orana project site. This includes the construction and operation of two concrete batch plants at locations nominated by the Head Contractor. This includes, but is not limited to, the provision of all necessary vehicles, plant, equipment, materials, goods, items, tools, and services for personnel, safety and protective clothing, consumables to execute the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The Subcontractor will be required to supply, maintain, operate the mobile plant required for a crushing and screening operation required on the Central-West Orana Project. This package will primarily function on a schedule of rates, however the Subcontractor is not limited to the schedule of rates, as they must adhere to other aspects of the contract such as the projects EH&S procedures.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
01 Apr 2024

The works in this package comprises of the supply and delivery of Geotextile material to the Central-West Orana Project. This package will primarily function on a schedule of rates. The Supplier shall provide all management, supervision, transport, handling, and is responsible for the appropriate and safe unloading methods of material.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The Scope of Works comprises of performing drilling and blasting activities to areas where rock is present on the Project

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Mar 2024

The Works compromise of managing crane for the pre-construction condition on defined private properties which may be impacted by construction works of the project

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2024

TBA

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The Scope of Works includes the construction of concrete tower foundations including form installation, reinforcement installation and concrete pouring across the project alignment in accordance with Project Technical Specifications and Legislation. The subcontractor shall provide, but not limited to, all management, supervision, transportation, plant, equipment, materials, and personnel necessary to complete the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Design Manager Consultant

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 Mar 2024

Design cost and program coordinator

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Equipment to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

ACE REZ is seeking a quote to complete all biodiversity tasks related to the Project up to January 2025. Please note this scope covers the review of all biodiversity related tasks required for planning purposes. The pre-construction/ construction related tasks are to be covered in a subsequent tender package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Works comprises of The manufacture and supply of Various 160kn Glass disc insulator as per the specification and quantities

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Works comprises of the design, testing, manufacture, and supply of Various conductors and delivered to Sydney Port, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee warranty of the conductors. All Supplier's Activities must be undertaken in accordance with this Scope of Works and the Technical Specification provided.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

ACEREZ require an experienced graphic designer to assist with the development of collateral and marketing materials during the construction of the Central-West Orana Renewable Energy Zone transmission line infrastructure. Providers will need to be experienced in the development of collateral for large infrastructure projects for government clients. this includes understanding and experience in using government branding guidelines including logo placement and contractor lock-ups, placement of text and photographs and drawing of maps and icons. providers will need to be work to fast turn- around times and multiple reviews, changes and iterations.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Mar 2024

The subcontract comprises of the engagement of a Subcontractor to assist in the coordination and supply of appropriately qualified temporary labour personnel as required for project delivery. This includes, but is not limited to, the provision of all necessary vehicles, plant, equipment, materials, goods, items, tools, and services for personnel, safety and protective clothing, consumables to execute the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Apr 2024

The Scope of Works comprises of undertaking stabilisation works to in-situ ground including all labour, plant, equipment, and materials. The Subcontractor shall make allowance for the supply and install of stabilisation material to the affected areas as nominated by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The Scope of Works includes the supply and installation of complex water crossing across the project alignment in accordance with the Environmental Impact Statement and Project Technical Specifications. These works are including, but not limited to, the installation of large culverts, headwalls, and pipes, in substantial bodies of water. The subcontractor shall provide, but not limited to, all management, supervision, transportation, plant, equipment, materials, and personnel necessary to complete the works. The subcontractor shall be local to the area and have an understanding of the land and waterways.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Equipment to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

ACE REZ is seeking a quote to complete all Noise and Vibration tasks related to the Project, including any reporting, and equipment requirements for construction of the project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Works comprises of the design, testing, manufacture, and supply of Various conductors and delivered to Sydney Port, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee warranty of the conductors. All Supplier's Activities must be undertaken in accordance with this Scope of Works and the Technical Specification provided.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2024

The Base Scope of Works comprises of the design, testing, manufacture, and supply of Various conductors and delivered to Sydney Port, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee warranty of the conductors. All Supplier's Activities must be undertaken in accordance with this Scope of Works and the Technical Specification provided.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Works comprises of the design, testing, manufacture, and supply of Various conductors and delivered to Sydney Port, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee warranty of the conductors. All Supplier's Activities must be undertaken in accordance with this Scope of Works and the Technical Specification provided.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Mar 2024

Personal Protective Equipment (PPE) for Early Works, Uniform

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Subcontractor is required to supply, install, commission, and provide ongoing operation of one site laboratory for the testing of earthworks and granular material as required by the Head Contractor. This includes, the provision of all necessary vehicles, plant, equipment, materials, goods, items, tools, and services for personnel, safety and protective clothing, consumables to execute the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2024

The Scope of Works comprises of quarry material supply to the Central-West Orana Project. This package will function on a Schedule of Rates, however the Subcontractor is not limited to the schedule of rates, as they must adhere to other aspects of the contract such as the projects EH&S procedures.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
02 Apr 2024

The Works comprise of performing all Survey works required to facilitate construction of the Central West Orana Project. The Subcontractor shall include all site establishment, management, supervision, labour, materials, equipment, plant, tools, items, gear, transport, and the provision of all necessary vehicles necessary, safety and protective clothing, and consumables to execute the Works Under Contract.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
02 Apr 2024

ACE REZ is seeking a quote to complete all Road safety tasks related to the Project. Please note this scope covers the review of all road safety related tasks required for planning purposes. The pre-construction/ construction related tasks are to be covered in a subsequent tender package.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The Scope of Works includes the supply and installation of significant lengths of rural fencing and gates across the project alignment in accordance with the Environmental Impact Statement and Project Technical Specifications. The subcontractor shall provide, but not limited to, all management, supervision, transportation, plant, equipment, materials, and personnel necessary to complete the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The supply and delivery of rural materials including, but not limited to rural fencing, electric livestock fencing and rural fencing gates

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

Safety in design facilitator

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
27 Mar 2024

The Supplier will be required to supply schedule of reinforcement, supply steel reinforcement (as per the bending schedules) and delivery of the reinforcement to the Central-West Orana Project. This package will primarily function on a schedule of rates, however the Supplier is not limited to the schedule of rates, as they must adhere to other aspects of the contract such as the projects EH&S procedures.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The scope includes supply and delivery of equipment and conductor steelwork support structures transmission line lattice towers and monopoles. It includes, but is not limited Preparation of general arrangement and shop drawings and associated bill of materials (angles, plates and bolts) based on the indicative steel tower support structure outline drawings supplied by the Head Contractor)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
12 Apr 2024

The Base Scope of supply 22KV ring main units to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
02 Apr 2024

The design, manufacture, factory acceptance testing, delivery, installation, integration, commissioning, testing, validation and handover of the Prefabricated Buildings;

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Works comprises of the design, manufacturee, testings and supply of:22/33kV 3MVA Dyn11 Auxiliary Transformer, inclusive of a 22kV RMU per transformer, 22/0.4kV 500kVA Dyn11 Auxiliary Transformers, 33/0.4kV 500kVA Dyn11 Auxiliary Transformer, 33/0.4kV 500kVA ZNyn11 Earthing Transformer, All Auxiliary and Earthing Transformers shall be shipped to Port Botany in Sydney, New South Wales, Australia (CIF incoterms).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
05 Apr 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Busbars Equipment to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Equipment to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Mar 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Equipment to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The installation will be priced and request Manufacture's supervisors on site.
The Works comprises broadly of the design, supply, delivery, install, integration, commissioning, testing, validation and hand-over of Harmonic Filters in accordance with this Scope of Work and the Technical Specification.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
28 Apr 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Equipment to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the Equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
31 Mar 2024

The Works comprises broadly of the design, supply, delivery, install, integration, commissioning, testing, validation and hand-over of Cable fittings in accordance with this Scope of Work and the Technical Specification.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The Base Scope of Work comprises of the design, manufacturing, testing and supply of 500kV, 330kV and 33kV Protection Relays to a port in New South Wales, Australia (CIF incoterms). The Works must also include all necessary effort from the Supplier to guarantee Warranty of the equipment to be installed by the Head Contractor.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
06 Apr 2024

The Subcontractor will be required to provide Temporary Works Design and certification for any necessary works on site. This includes, but is not limited to, the provision of all necessary vehicles, plant, equipment, materials, goods, items, tools, and services for personnel, safety and protective clothing, consumables to execute the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
24 Mar 2024

The works in this package comprises of the supply, delivery, and installation of Temporary Fencing to the Central-West Orana Project. This package will primarily function on a schedule of rates. The Supplier shall provide all management, supervision, transport, handling, and is responsible for the appropriate and safe unloading methods of material.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
29 Mar 2024

The Subcontractor will be required to provide Temporary Works Design for traffic staging and certification for any necessary works on site. This includes, but is not limited to, the provision of all necessary vehicles, plant, equipment, materials, goods, items, tools, and services for personnel, safety and protective clothing, consumables to execute the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
26 Aug 2023

Expression of interest for the design, supply, installation, testing and commissioning of Synchronous Condensers for the Central West Orana Renewable Energy Zone Project

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

The Scope of Works includes the removal of vegetation and trees, mulching or offsite disposal and removal of treatment of stumps from within the project alignment in accordance with the Environmental Impact Statement and Project Technical Specifications. The subcontractor shall provide, but not limited to, all management, supervision, transportation, plant, equipment, materials, and personnel necessary to complete the works.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
21 Apr 2024

UDL Consultant the scope is to identify requirements to develop an Urban Design & Landscape Plan (UDLP) to address the Ministers Conditions of Approval (CoA), state conditions or other requirements imposed on the project as part of the planning approval process of the SSI/CSSI.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
10 Nov 2023

The Package will require an accredited cable locator, who can provide vacuum trucks, including supply of water and waste removal.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Apr 2024

Drilling and Establishment of water Bore Holes

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.