BHP Olympic Dam Corporation Pty Ltd (BHP)

BHP OAK DAM

location_onSA Australia
location_on

SA Australia

business

BHP Olympic Dam Corporation Pty Ltd (BHP)

Project Primary Contact
person_outline
Eddie Ivar
Supply Consultant, ICN SA
phone_enabled
+61 409 583 961
Overview

Project Details

BHP Olympic Dam (BHP) is a fully-integrated mining and mineral processing operation, owned by the BHP Group through its wholly owned subsidiary BHP Olympic Dam Corporation Pty Ltd.

Oak Dam is a deep iron oxide copper-gold mineralised system located approximately 65 km south-east of Olympic Dam. BHP is currently completing exploration drilling from the surface to continue definition of the grade, geometry and continuity of the mineralisation. BHP is studying the option for early underground access which would support underground exploration drilling of the ore body.

The Oak Dam Underground Access Project (Project) scope is to construct a twin decline to access the mineral deposit ~700m below ground level. The Project will be executed over three stages: Bulk Earthworks including box cut construction; Non-Process Infrastructure (NPI) providing surface infrastructure and installation, and Decline Development Operations (Mining).

These three project stages represent the major Works Packages that will be released via the ICN Gateway.

Indicative Timeline

DPS commenced - December 2023
Earthworks / NPI commencement - FY25
Decline Development Operations (Mining) commencement - FY25
Project completion - FY29

Disclaimer

The proposed Project is subject to a number of approvals. Accordingly, the scope descriptions, timelines and values stated in this project description are indicative only and subject to change.


How to register an Expression of Interest

  • Prior to submitting an EOI for this work package, you will require an active ICN Gateway company profile. Information on how to register your company on ICN Gateway is available here - ICN Gateway User Guide.
  • To submit your EOI, click on the 'create EOI' link which can be found via the View Work Packages button below.
4
Total work packages
3
Open work packages
1
Other work package
4
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
Status
Open
Full scope EOI closes on
17 May 2024
Partial scope EOI closes on
17 May 2024

BHP Olympic Dam Corporation Pty Ltd (BHP) is seeking preliminary supplier information and expressions of interest for the provision of the following packages for the Oak Dam Underground Access (OKDUGA) Project:

- Bulk Earthworks incl. Box Cut Construction Services
- Non-Process Infrastructure (NPI)
- Site Access Road

There will potentially be an opportunity to combine the Bulk Earthworks, NPI and Access Roads packages if the contractor has the capabilities and capacity.

Please download the attached 'Scope Doc' for further details

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
17 May 2024

Design and supply of admin office buildings, including change rooms and ablution facilities

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Open
Full scope EOI closes on
20 May 2024

The scope of the Accommodation Expansion package includes:
- Design for an additional 160 rooms to be installed at the existing Exploration Hub at Oak Dam - design includes all earthworks, services (potable water, electrical, sewerage, communications) and raised/covered walkways between the modules.
- Design an expanded sewerage soakage area
- Design, fabricate and transport to site 40 x 4-room accommodation modules (14.4m*3.6m) and 2 Laundries (10.8m*3.3m). All internal fixtures and fit-out to be included. Transportation to include any permits and authorisations from relevant State Road Authorities.
- Construct, install and commission all modules and services in accordance with the design. Install of modules includes all unloading activities

The scope of the Accommodation Modules package includes:
- Supply of the following modules (including all internal fixtures and fit-out): 14.4m*3.6m 4-room accommodation modules (40 of); 10.8m*3.3m Laundries (2 of)
- Transportation to the Oak Dam site (including any permits and authorisation from relevant State Road authorities)

Download the attached 'Scope Doc' for further information.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Requested for Tender (RFT)
Full scope EOI closes on
23 Aug 2023

The Supplier will be responsible for completing all of the following works:
> Install temporary workshops and maintenance facilities on the surface
> Development of the twin decline and waste rock storage (excludes construction of the box cut)
> Establish underground services including:
- Primary ventilation fans
- Major de-watering pump stations
- Minor dewatering pump stations
- Power infrastructure
- Communication infrastructure
- Secondary ventilation
- Underground raise drilling
- Rescue chambers
> Supply and maintenance of mining equipment
> Construction and operation of concrete batch plant for supply of shotcrete

See the attached Scope Doc for further details.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.