Eastern Freeway Burke to Tram Alliance CNOP JV

EASTERN FREEWAY UPGRADES - BURKE TO TRAM

location_onVIC Australia
location_on

VIC Australia

business

Eastern Freeway Burke to Tram Alliance CNOP JV

Project Primary Contact
person_outline
Andrew Bradley
phone_enabled
+61 447 446 091
Overview

The Eastern Freeway - Burke to Tram will be designed and delivered by the Eastern Freeway - Burke to Tram Alliance which includes Major Road Projects Victoria, Laing O'Rourke, Symal, Arcadis and WSP. The Scope of Works includes:

  • Upgrade to existing Eastern freeway over 6.5km,
  • Bulleen Interchange interfacing with the Central package, Bulleen sporting grounds and facilities
  • Doncaster Interchange, Doncaster Park & Ride
  • New dedicated Doncaster busway and Collector-Distributors,
  • Noise walls, retaining walls
  • Shared user paths along the length of the freeway (South Package)
  • Pedestrian bridges and underpasses; and
  • Utilities relocations and protection works.


Opportunities
The delivery activities will leverage the Supply chain and will provide opportunities to suppliers and subcontractors, including:

  • Civils
  • Structures (Structural steel, FRP, and Precast)
  • Piling
  • Drainage
  • Reinforcement supply and prefabrication
  • Construction materials (quarry, concrete)
  • Noise and retaining walls
  • Shared user paths along the length of the Freeway (South Package)
  • Pedestrian bridges and underpasses; and
  • Asphalting.


Timing

Critical procurement including long lead times start in July 2023 to end 2024, with the remaining procurement starting circa end 2023 to May 2025, for delivery starting circa end 2023 to April 2027.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to Eastern Freeway - Burke to Tram Alliance.
  • The Eastern Freeway - Burke to Tram Alliance will make direct contact with companies who submit an EOI and/or pass details onto its main contractor.
  • As ICN Victoria becomes engaged on individual Work Packages for the Eastern Freeway - Burke to Tram Project, specific EOIs may need to be submitted.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.


ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.


(1) ICN Gateway Setup Wizard
(2) ICN Gateway User Guide

72
Total work packages
1
Open work package
71
Other work packages
72
Total work packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
General
Status
Open
Full scope EOI closes on
30 Jun 2026

Express interest for any opportunities that may arise for this project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Civil Works
Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply and Install of Asphalt and Seal.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Backfill Material (General Granular).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Backfill Material (Sands/Filter material).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Backfill Material (Structural Type A/Select).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply and Install of Beaching / Rip Raps.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Clear & Grub opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Concrete - Mainline Barrier - Precast Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Concrete - Slipform barriers

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in DDA Compliance - Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Demolition (Bridges) opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Demolition (Jersey barriers, wire rope, Parapets) opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Demolition (Noise walls) opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Demolition (SUP bridges)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Install of Drainage.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Drainage Pipes.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Drainage Pits.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Earthworks (General) opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Earthworks (Pavement Removal) opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Earthworks (Subgrade Improvement) opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Fencing - Permanent (Supply and Install)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Fencing - Temporary (Supply and Install)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Granular Pavement.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Hard Landscaping - Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Hard Landscaping - Supply and Install Asphalt

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Kerb, Lintels and/or Bullnoses opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest for the Linemarking Permanent - Supply.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest for the Linemarking Temp - Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Major Piling
opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Minor Piling - Gantry Piles opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Install of Noise Walls (Including Ground Foundations).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Permanent Barriers - Wire Rope, Crash Cushions, Guardrail - Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Install of Piling Retaining Walls.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Precast Retaining Walls.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Property Treatment Works opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Protective Coatings (Anti-Graffiti)- Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Retaining Walls for Flood Wall opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Retaining walls (RSS Walls) - Install opportunity.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Soft Landscaping - Install & Maintain

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Soft Landscaping - Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Soil Nails Retaining Walls - Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Subsoil Drainage.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Install of Subsoil.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Install of Temporary Noise Walls.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express interest for the Supply of Temporary Noise Walls.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Structures
Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Bridges - Bearings Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Bridge Screens - Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Bridge Steel Railings - Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Bridge Strengthening

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Concrete (Supply)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in FRP - Bridges

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in FRP - Minor Structures

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in FRP - Pedestrian Underpass

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in FRP - Ramp Underpasses

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Gantry Supply & Install + Signage Structures

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Ground Improvement - CICs or Soil Wicks

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Structure - Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Supply- Barriers

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Supply - Beams (Planks / Super T's)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Supply - Bebo Arches

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Supply - Culverts

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Supply - Noise Walls

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Supply - Parapets

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Precast Supply- Pier (Column & Crosshead)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Reo (Supply)

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Signage Faces - Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Street Lighting

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Street Lighting - Electrical Supply & Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Structural Steel (Bridges) - Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Structural Steel - Fabricate and Supply

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Structural Steel - Install on Site

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
22 Mar 2023
Partial scope EOI closes on
22 Mar 2023

Express your interest in Traffic Signals - Supply and Install

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.