SA Australia
AMP POWER AUSTRALIA PTY LTD
About Amp Power Australia Pty Ltd (Amp)
Amp is a global energy transition platform.
We develop, own and operate clean energy assets throughout our core markets around the world, alongside Amp X, our disruptive grid-edge technology platform utilising proprietary artificial intelligence expertise. The company is headquartered in Toronto with global operations throughout Australia, India, Japan, Spain, Czech Republic, UK and North America.
Founded in 2009, Amp is a high-growth disruptor at scale, backed by major investments from institutional capital partners including most recently the Carlyle Group, which invested US$374 million into the company in late 2020.
For more information, please visit amp.energy.
About Robertstown Solar
Robertstown Solar is a 500MWac photovoltaic project to be developed on approximately 1800 hectares of agricultural land in the districts of Bright and Geranium Plains, South Australia. The site is situated approximately 5 kilometers north-east of Robertstown and 115 kilometers north-east of Adelaide. The Project is within the Local Government Area of the Regional Council of Goyder.
Robertstown Solar is a large-scale utility power plant that creates energy from the sunlight via photovoltaic (PV) cells mounted on a single axis sun tracking system. Tracking solar panel systems follow the sun's movement throughout the day for maximum energy production. The Direct Current (DC) electricity that is created by sun through the cells is fed through cables to a series of inverters where the Direct Current is converted to Alternating Current (AC) and increased in voltage. The inverters are connected through underground cables to a switching yard. In the switching yard the voltage of the electricity is again increased to reduce the electrical transmission losses. From the switching yard the electricity generated is then fed by underground cables to the Robertstown Substation for connection to the South Australian electrical grid.
A 250MW Battery Energy Storage System ("BESS") will be constructed as part of the Project to extend the hours during which the Solar Farm will supply electricity to the South Australian Grid. In addition, the BESS will contribute to power system security in the State.
Additional infrastructure which will be built as part of the Project includes internal access tracks, offices, workshop sheds, fences and drainage.
During the operational phase, regular inspections, panel cleaning, vegetation management, componentry servicing and infrastructure maintenance are required.
Solar farms typically have a minor physical disturbance footprint. As such, investigations into co-agriculture opportunities are underway to ascertain opportunities within Robertstown Solar for other forms of traditional agriculture such as sheep grazing and apiculture to co-exist with the solar operations.
Robertstown Solar is seeking local entrepreneurs and businesses who are eager to join the drive to grow the supply of renewable energy in South Australia. There are opportunities for small and large enterprises both during the construction of the Project and post commissioning. We invite all those who are interested to submit their expression of interest through the ICN Gateway.
Arial view of the Robertstown PV and BESS Project Site (please click image to enlarge view)
Scope of work:
- Single accommodation, long stay - bed and breakfast
- Single accommodation, short stay - dinner, bed and breakfast
- Back packer accommodation
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Breakfast at or near site
- Lunch at or near site
- Supply of beverages and snacks which could be sold at a tuckshop on site
- Occasional site barbecues
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Site clearing and grubbing
- Tree removal and mulching
- Site preparation - cut and fill works
- Road construction
- Drainage construction
- Piling
- Horizontal boring
- Casting of foundations
- Removal and disposal of spoil
- Hydro seeding / Hydro mulching
- Landscaping and rehabilitation
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Cable trenching
- Cable pulling
- Cable termination
- Cable jointing
- Electrical equipment installation e.g. combiner boxes, inverter stations, substation equipment
- Solar panel harness installation
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
Variety of fabrication, welding and mechanical services, on and off-site.
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
Environmental planning, monitoring and reporting
- Monitoring of fauna
- Monitoring of flora
- Monitoring of dust
- Monitoring of drainage
- Snake catching
- Pest Control
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Supply of gates and fencing material
- Installation of gates and fencing
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Requirements:
- Supply of diesel off site
- Delivery of diesel to site
- Supply, on site, of self-bunded, double walled fuel storage tanks
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Subterranean investigations and service location
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
Personal Protective Equipment
- Safety boots
- High vis clothing and bibs
- Hardhats
- Safety glasses
- Gloves
Safety Equipment
- First aid kits
- Fire extinguishers
- Spill kits
- Water bottles
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Supervision
+ Civil
+ Structural
+ Electrical
- Administration (procurement, accounting support, human resource management, office support)
- Plant and machinery operators
- Concrete hands
- Fitters
- Electrical trade assistants
- Licenced electricians
- General labourers
- Fork lift and telehandler operators
- Quality Inspectors
- Storemen
- Cleaners
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Quarry material
- Aggregate
- Concrete
- Sundry electrical material
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Installation of Single Axis Tracker System
- Installation of modules
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Supply and installation of office networks
- Supply and installation of internet services
- Supply of cellular network boosters
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
Supply of furniture and fittings
- Desks
- Chairs
- Credenzas
- Book cases
- Cupboards
- Printers
- Photostat machines
- Ice machines
- Microwaves, kettles etc
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Stationery
- Coffee, tea etc
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Soil resistivity testing
- Soil thermal resistivity testing
- Compaction testing
- Concrete testing
- Earthing testing
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
Supply of Plant & Equipment - wet & dry services
- Graders
- Rollers
- Water tankers
- Land planes
- Piling rigs
- Vac trucks
- Forklifts
- Telehandlers
- All terrain quad vehicles
- Tractors
- Trailers
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of Work:
- Attendance monitoring services
- Breathalyser testing
- Temperature checking
- Security patrols
- Support during emergencies
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Supply of office cabins
- Supply of crib rooms
- Supply of site conference rooms
- Supply of site toilets
- Plumbing of site facilities
- Electrical reticulation of site facilities
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
Surveying services pre, during and post construction
- Land surveying
- Road surveying
- Pile installation
- Cable route surveying and marking
- As built surveys
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Development of on-site traffic management plans
- Traffic management both at the access to site and on the site
- Delivery management
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of Work:
- Removal of liquid waste
- Supply of waste bins including recycling and landfill bins
- Removal of landfill waste
- Removal and recycling of solid waste (wood, paper, plastic etc)
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of work:
- Potable water - supply to site offices
- Construction water - supply to site for construction works
- Supply of water tanks and pumps
To submit your Expression of Interest please:
1) click Create EOI and respond to the questions
2) when completed, click SUBMIT
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.