Logan Hospital Expansion Project (LHEX)


Project at a glance


QLD Australia
Committed
Metro South Health - Queensland Government
$460M

Contact Details


Nimmi Pushparajan
Procurement Engineering Specialist
+61 7 3364 0670

Logan is one of the fastest growing regions in the state with more than 70,000 additional dwellings expected in the area by 2041.

This expansion will enhance the clinical services delivered at the Logan Hospital and improve facilities for patients, visitors and staff.

  • The vertical expansion of Building 3 by three clinical levels and one additional level for plant, with infill of the existing ground level, currently a car park under Building 3, to provide additional clinical support and services capability. 
  • Extensive refurbishment and repurposing of clinical, clinical support and operational services in Building 1 and some refurbishment in Building 2; and 
  • The installation of a new High Voltage Power feed to the site to support the expanded services, with upgrade works on site to provide for increased stability and redundancy of the electrical supply. 


The Building 3 vertical expansion will deliver: 

  • Five 32-bed inpatient units consisting of single and double bedrooms with ensuites, and one 16-bed Intensive Care unit. 
  • A relocated and expanded pathology department.
  • An 8-bed coronary care unit with an adjacent Respiratory and Cardiac clinical measurements and cold shell for future expansion.
  • A new acute care of the elderly unit.
  • A new education and training space including a simulation suite and a range of clinical support departments; and 
  • An additional 13 short stay Emergency Department beds. 


The infill of the existing ground level of Building 3 will deliver: 

  • New administrative offices for the clinical and administrative staff relocated from the Emergency Department.
  • A 24-bed and 9-chair Transit Care Hub. 
  • A new Satellite Medical Imaging service that will include a 3T MRI service, fixed X-Ray, Ultrasound and Fluoroscopy services and a warm shell space for a future CT scanner; and 
  • A relocated Central Equipment Store, Biomedical Technology Services and a new Building Engineering workshop. 


The refurbishment within Building 1 will deliver: 

  • A 14-bed Palliative Care inpatient ward. 
  • Additional beds in the adult Acute Mental Health Unit. 
  • A new 9-chair chemotherapy services collocated with 14 same day treatment bays and a small satellite pharmacy. 
  • An expanded pharmacy. 
  • Refurbished and expanded kitchen and food services (including staff dining facilities).
  • Refurbished back of house areas (including linen, stores and waste services). 

The refurbishment within Building 2 includes the refurbishment of endoscopy services delivering an additional 2 procedure rooms. 

John Holland has appointed as the Managing Contractor. All major agreements will be with John Holland directly.



DELIVERY SCHEDULE


During 2020, John Holland is undertaking the Detailed Design on the Project that will inform a final investment decision by Metro South Health (MSH). MSH’s decision is expected to be received in the third quarter of 2021. Some early enabling works may be awarded prior to the finalisation of the Detailed Design.

Construction of the main Building 3 works is anticipated to take approximately 24 months once final approval is granted.



REGISTRATION OF INTEREST (ROI)


John Holland encourages local industry interested in supplying to the project to provide a Registration of interest (ROI) through the ICN Gateway.

Information on specific supply opportunities will be communicated on the ICN Gateway project page as it becomes available, with local industry able to register its interest against them.


Please ensure that:

  • Your company profile on the ICN Gateway is complete, up-to-date and accurate including electing to be notified via e-mail of supply opportunities
  • You register your interest as a full or partial scope supplier (where applicable), and
  • You respond to all project and work package-specific questions.

It is important that businesses submitting an ROI are aware that their submission does not guarantee that they will progress further in the procurement process. Only companies that can demonstrate capability and capacity in accordance with John Hollands standards will be invited to pre-qualify for specific opportunities.


APPLICABLE GOVERNMENT POLICIES


Please note the below link works in Google Chrome and not on other web browsers.


The following Queensland Government policies are applicable to this project:


 QLD Procurement Policy 2019

https://www.hpw.qld.gov.au/__data/assets/pdf_file/0020/3377/qldprocurementpolicy.pdf

QLD Building and Construction – Code of practice 2000

https://www.oir.qld.gov.au/sites/default/files/oir-code-of-practice-building-and-construction_0.pdf?acsf_files_redirect

QLD Charter for Local Content

file:///C:/Users/joconnor1/Documents/Procurement%20docs/Logan%20Procurment%20docs/QLD%20Procurement%20policy%20Docs/queensland-charter-for-local-content.pdf

QLD Gov Building and Construction Training Policy

https://desbt.qld.gov.au/__data/assets/pdf_file/0023/8339/qg-building-construction-training-policy.pdf

https://desbt.qld.gov.au/__data/assets/pdf_file/0015/10572/training-policy-fact-sheet.pdf

Best Practice principles: Quality, Safe workplaces

https://www.hpw.qld.gov.au/__data/assets/pdf_file/0016/3940/qualitysafeworkplaces.pdf

Ethical Supplier Threshold

https://www.business.qld.gov.au/running-business/marketing-sales/tendering/supply-queensland-government/ethical-supplier-requirements/threshold

Ethical Supplier Mandate

https://www.forgov.qld.gov.au/search-procurement-resources/ethical-supplier-mandate



INDUSTRY BRIEFING


An industry briefing session for this project was held on 29th April 2021.


The below webcast link is available to be clicked on to go through the recorded version of the Industry Briefing Session. 


Click here to view the recorded webinar




FURTHER ASSISTANCE


John Holland strongly encourage local industry to contact the ICN Queensland in the first instance to improve their understanding of the ROI process.

John Hollands primary contact is:

Senior Contracts Administrator

LHEX.ROI@jhg.com.au


Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

Building works

AccordianPlus Staff Dining Fitout

Full Scope EOI

Closed: 
24 Nov 2021 (AEST)

Partial Scope EOI

Closed: 
24 Nov 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
24 May 2022 (AEST)

Partial Scope EOI

Closed: 
24 May 2022 (AEST)
  Closed
Accordian collapse

Early works

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Awarded
AccordianPlus HV Early works

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Awarded
AccordianPlus ISS Room Fitout

Full Scope EOI

Closed: 
19 Feb 2021 (AEST)

Partial Scope EOI

Closed: 
19 Feb 2021 (AEST)
  Closed
AccordianPlus ISS Room Structural

Full Scope EOI

Closed: 
19 Feb 2021 (AEST)

Partial Scope EOI

Closed: 
19 Feb 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
23 Feb 2021 (AEST)

Partial Scope EOI

Closed: 
23 Feb 2021 (AEST)
  Closed
Accordian collapse

Enabling works

AccordianPlus Gantry

Full Scope EOI

Closed: 
14 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Awarded
AccordianPlus Scaffold

Full Scope EOI

Closed: 
16 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Awarded

Full Scope EOI

Closed: 
14 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Awarded

Full Scope EOI

Closed: 
26 Jun 2021 (AEST)

Partial Scope EOI

Closed: 
26 Jun 2021 (AEST)
  Awarded
AccordianPlus Early Mechanical works

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Closed
AccordianPlus Waterproofing

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Closed
AccordianPlus Demolition

Full Scope EOI

Closed: 
14 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Closed
AccordianPlus Mobile Cranes

Full Scope EOI

Closed: 
14 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Closed
AccordianPlus Metal Roofing

Full Scope EOI

Closed: 
15 Feb 2021 (AEST)

Partial Scope EOI

Closed: 
15 Feb 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
26 Jun 2021 (AEST)

Partial Scope EOI

Closed: 
26 Jun 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
29 Jun 2021 (AEST)

Partial Scope EOI

Closed: 
29 Jun 2021 (AEST)
  Closed
Accordian collapse

Group 1

Full Scope EOI

Closed: 
21 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
21 Dec 2020 (AEST)
  Awarded

Full Scope EOI

Closed: 
04 Jun 2021 (AEST)

Partial Scope EOI

Closed: 
04 Jun 2021 (AEST)
  Awarded
AccordianPlus Surveyor

Full Scope EOI

Closed: 
14 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Closed

Full Scope EOI

Closed: 
16 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Closed

Full Scope EOI

Closed: 
13 May 2021 (AEST)

Partial Scope EOI

Closed: 
13 May 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
04 Jun 2021 (AEST)

Partial Scope EOI

Closed: 
04 Jun 2021 (AEST)
  Closed
AccordianPlus Formwork

Full Scope EOI

Closed: 
09 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
09 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
09 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
09 Jul 2021 (AEST)
  Closed
AccordianPlus Structural Steel

Full Scope EOI

Closed: 
09 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
09 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
09 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
09 Jul 2021 (AEST)
  Closed
AccordianPlus Brick and Blockwork

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed
AccordianPlus Medical Gases

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
14 Jul 2021 (AEST)

Partial Scope EOI

Closed: 
14 Jul 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
10 Aug 2021 (AEST)

Partial Scope EOI

Closed: 
10 Aug 2021 (AEST)
  Closed
AccordianPlus Facade Glazing

Full Scope EOI

Closed: 
10 Aug 2021 (AEST)

Partial Scope EOI

Closed: 
10 Aug 2021 (AEST)
  Closed
AccordianPlus ICT Systems Integrator

Full Scope EOI

Closed: 
13 Aug 2021 (AEST)

Partial Scope EOI

Closed: 
13 Aug 2021 (AEST)
  Closed
AccordianPlus Ceramic Tiling

Full Scope EOI

Closed: 
17 Aug 2021 (AEST)

Partial Scope EOI

Closed: 
17 Aug 2021 (AEST)
  Closed
AccordianPlus Painting

Full Scope EOI

Closed: 
17 Aug 2021 (AEST)

Partial Scope EOI

Closed: 
17 Aug 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
30 Aug 2021 (AEST)

Partial Scope EOI

Closed: 
30 Aug 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
28 Oct 2021 (AEST)

Partial Scope EOI

Closed: 
28 Oct 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
28 Oct 2021 (AEST)

Partial Scope EOI

Closed: 
28 Oct 2021 (AEST)
  Closed
AccordianPlus Lockers

Full Scope EOI

Closed: 
28 Oct 2021 (AEST)

Partial Scope EOI

Closed: 
28 Oct 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
28 Oct 2021 (AEST)

Partial Scope EOI

Closed: 
28 Oct 2021 (AEST)
  Closed
AccordianPlus Operable Walls

Full Scope EOI

Closed: 
29 Oct 2021 (AEST)

Partial Scope EOI

Closed: 
29 Oct 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
29 Oct 2021 (AEST)

Partial Scope EOI

Closed: 
29 Oct 2021 (AEST)
  Closed
AccordianPlus Kitchen Fitout

Full Scope EOI

Closed: 
03 Nov 2021 (AEST)

Partial Scope EOI

Closed: 
03 Nov 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
04 Nov 2021 (AEST)

Partial Scope EOI

Closed: 
04 Nov 2021 (AEST)
  Closed
AccordianPlus Joinery

Full Scope EOI

Closed: 
04 Nov 2021 (AEST)

Partial Scope EOI

Closed: 
04 Nov 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
04 Nov 2021 (AEST)

Partial Scope EOI

Closed: 
04 Nov 2021 (AEST)
  Closed
AccordianPlus MRI Faraday Cage

Full Scope EOI

Closed: 
07 Nov 2021 (AEST)

Partial Scope EOI

Closed: 
07 Nov 2021 (AEST)
  Closed

Full Scope EOI

Closed: 
15 Feb 2022 (AEST)

Partial Scope EOI

Closed: 
15 Feb 2022 (AEST)
  Closed

Full Scope EOI

Closed: 
26 Apr 2022 (AEST)

Partial Scope EOI

Closed: 
26 Apr 2022 (AEST)
  Closed
AccordianPlus Final Clean

Full Scope EOI

Closed: 
27 Apr 2022 (AEST)

Partial Scope EOI

Closed: 
27 Apr 2022 (AEST)
  Closed

Full Scope EOI

Closed: 
21 Jun 2022 (AEST)

Partial Scope EOI

Closed: 
21 Jun 2022 (AEST)
  Closed
Accordian collapse

SITE ESTABLISHMENT WORKS

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Awarded
AccordianPlus Waste Management

Full Scope EOI

Closed: 
16 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Awarded

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Closed

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Closed

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Closed

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Closed

Full Scope EOI

Closed: 
07 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
07 Dec 2020 (AEST)
  Closed
AccordianPlus Dilapidation Survey

Full Scope EOI

Closed: 
09 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
09 Dec 2020 (AEST)
  Closed
AccordianPlus Site Security

Full Scope EOI

Closed: 
14 Dec 2020 (AEST)

Partial Scope EOI

Closed: 
14 Dec 2020 (AEST)
  Closed
Note: The closing date/s for expressions of interest are subject to change.