Pluto LNG Train 2



Contact Details


  Linus O'Brien
  +61 8 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: FEED
  Project Owner Woodside Energy Ltd

Project Details


The project comprises a proposed expansion of the Woodside-operated Pluto LNG facility through construction of a second LNG train.  Expanded capacity allows for the potential processing of third-party gas resources through the Pluto LNG facilities, including the proposed Scarborough Development. 

                                                                                                       

Woodside has selected Bechtel as its preferred contractor, initially to undertake FEED and with an option to construct the project subject to FID.  Woodside intends to enter into negotiations to finalise contract arrangements for the work, based upon Bechtel’s proposal which reflects a proven design that it has previously constructed in Australia.

                                                                                                                    

As the successful EPC contractor, Bechtel would assume responsibilities as the procurement entity for all itemised packages that result as sub-contracts.

                                                              

Woodside’s own procurement activities will be limited to sourcing materials or services occasionally required to supplement the services provided by the EPC contractor.

                                                   


Woodside’s project milestones are aligned with the proposed upstream Scarborough Development, targeting front-end engineering and design entry in Q1 2019 and a final investment decision in 2020. Ready for start-up of the downstream expansion is targeted in 2024.                                                                                              

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Gaskets26 Mar 202006 Apr 202006 Apr 2020
Please refer to SOW for further details.
CO2 Absorber13 Mar 201903 Apr 201903 Apr 2019
Please refer to the scope of works document for details of the package
Inlet Air Chilling System13 Mar 201903 Apr 201903 Apr 2019
Please refer to scope of works document for details of the package
Heavy Wall Vessels - Carbon Steel (CS)14 Mar 201904 Apr 201904 Apr 2019
Please review the scope of works document for details of the package.
Internals for Columns14 Mar 201904 Apr 201904 Apr 2019
Please review the scope of works document for details of the package.
FEED Gas Expander Compressor14 Mar 201905 Apr 201905 Apr 2019
Please review the scope of works document for details of the package.
Power Transformers14 Mar 201905 Apr 201905 Apr 2019
Please review the scope of works document for details of the package.
Columns and Vessels (Carbon Steel) - Proprietary14 Mar 201908 Apr 201908 Apr 2019
Please review the scope of works document for details of the package.
Columns and Vessels (Stainless Steel)14 Mar 201908 Apr 201908 Apr 2019
Please review the scope of works document for details of the package.
Columns and Vessels (Carbon Steel)15 Mar 201909 Apr 201909 Apr 2019
Please review the scope of works document for details of the package.
Columns and Vessels (Stainless Steel)15 Mar 201909 Apr 201909 Apr 2019
Please review the scope of works document for details of the package.
Coalescers15 Mar 201910 Apr 201910 Apr 2019
Please review the scope of works document for details of the package.
Prefabricated Substation Buildings15 Mar 201910 Apr 201910 Apr 2019
Please review the scope of works document for details of the package.
Filters and Gas Separators15 Mar 201911 Apr 201911 Apr 2019
Please review the scope of works document for details of the package.
Safety Instrumented System and Fire and Gas System15 Mar 201911 Apr 201911 Apr 2019
Please review the scope of works document for details of the package.
Actuated On-Off Ball Valves15 Mar 201912 Apr 201912 Apr 2019
Please review the scope of works document for details of the package.
General Service Control Valves15 Mar 201912 Apr 201912 Apr 2019
Please review the scope of works document for details of the package.
Concrete Batch Plant and Aggregate Supply05 Apr 201926 Apr 201926 Apr 2019
Please review the scope of works document for details of the package.
Construction Village Buildings Utilities Operations and Catering16 Apr 201907 May 201907 May 2019
Please refer to the scope of works document for details of the package
Air Services23 May 201913 Jun 201913 Jun 2019
Please review the scope of works document for details of the package.
Bussing23 May 201913 Jun 201913 Jun 2019
Please review the scope of works document for details of the package.
Temporary Buildings - Facilities - Utilities23 May 201913 Jun 201913 Jun 2019
Please review the scope of works document for details of the package.
Temporary Telecoms23 May 201913 Jun 201913 Jun 2019
Please review the scope of works document for details of the package.
Concrete Pumping24 May 201914 Jun 201914 Jun 2019
Please review the scope of works document for details of the package.
NDE Testing24 May 201914 Jun 201914 Jun 2019
Please review the scope of works document for details of the package.
Site Preparation - Crushing and Earthworks24 May 201914 Jun 201914 Jun 2019
Please review the scope of works document for details of the package.
Soil and Concrete Testing24 May 201914 Jun 201914 Jun 2019
Please review the scope of works document for details of the package.
Medical and ER Services11 Jun 201925 Jun 201925 Jun 2019
Please refer to the scope of works document for details of the package
Road Paving11 Jun 201925 Jun 201925 Jun 2019
Please refer to the scope of works document for details of the package
Compressor Bridge Crane26 Jun 201906 Jul 201906 Jul 2019
Please refer to the scope of works for further details pertaining to this package.
Pump Metering or Proportioning26 Jun 201906 Jul 201906 Jul 2019
Please refer to scope of work for further details pertaining to this package.
Pump Vertical Sump26 Jun 201906 Jul 201906 Jul 2019
Please refer to scope of work for further details pertaining to this package.
Level Gauge Sight Glass11 Jul 201921 Jul 201921 Jul 2019
Please refer to the package description as detailed in the pdf under DOCS
Nitrogen Generation Plant11 Jul 201921 Jul 201921 Jul 2019
please refer to the package description as detailed in the pdf under DOCS
Pressure Relief Valves11 Jul 201921 Jul 201921 Jul 2019
please refer to the package description as detailed in the pdf under DOCS
Pump Centrifugal API11 Jul 201921 Jul 201921 Jul 2019
Please refer to the package description as detailed in the pdf under DOCS
Pump (Centrifugal/API) Lean Solvent Charge11 Jul 201921 Jul 201921 Jul 2019
Please refer to the package description as detailed in the pdf under DOCS
Rupture Disks11 Jul 201921 Jul 201921 Jul 2019
please refer to the package description as detailed in the pdf under DOCS
T-Strainers11 Jul 201921 Jul 201921 Jul 2019
please refer to the package description as detailed in the pdf under DOCS
Vibration Monitoring System11 Jul 201921 Jul 201921 Jul 2019
Please refer to the package description as detailed in the pdf under DOCS
Security (Access and Traffic Control - Camp)12 Jul 201902 Aug 201902 Aug 2019
Please review the scope of works document for details of the package.
Waste (Solid and Liquid and Hazardous) Removal and Recycle12 Jul 201902 Aug 201902 Aug 2019
Waste (Solid, Liquid and Hazardous) Removal and Recycle
Anti - Foam Metering and Injection System16 Aug 201926 Aug 201926 Aug 2019
Please refer to the scope of works document for details of the package.
Anchor Bolts and Steel Embeds13 Sep 201923 Sep 201923 Sep 2019
Please review the scope of works document for details of the package.
Fabricated Reinforcing Steel13 Sep 201923 Sep 201923 Sep 2019
Please review the scope of works document for details of the package.
Mercury Removal Adsorbent and Ceramic Balls13 Sep 201923 Sep 201923 Sep 2019
Please review the scope of works document for details of the package.
Molecular Sieve Adsorbent and Ceramic Balls13 Sep 201923 Sep 201923 Sep 2019
Please review the scope of works document for details of the package.
IEC Bulk Electrical Materials and Cable Management20 Sep 201904 Oct 201904 Oct 2019
Please review the scope of works document for details of the package.
N2 Sealgas Booster Compressor Package20 Sep 201904 Oct 201904 Oct 2019
Please review the scope of works document for details of the package
Pipe and Fittings - HDPE/Polypropylene20 Sep 201904 Oct 201904 Oct 2019
Please review the scope of works document for details of the package.
Piping Specialty Items - Inline Mixer20 Sep 201904 Oct 201904 Oct 2019
Please review the scope of works document for details of the package.
Domestic Transport and Logistics Services29 Oct 201912 Nov 201912 Nov 2019
Please refer to the scope of works document for details of the package
Supply and Fabrication of Structural and Miscellaneous Steel12 Nov 201903 Dec 201903 Dec 2019
Please review the scope of works document for more details of the package.
Architectural Building Materials for Shelters26 Nov 201906 Dec 201906 Dec 2019
Please review the scope of works document for more details of the package.
Pipe Supports Spring Hangers30 Jan 202010 Feb 202010 Feb 2020
Please refer to SOW for further details.