  Project Value: Circa $20 Million
  Project Status: Commenced
  Project Owner Laing O'Rourke Australia Construction Pty Ltd

Project Details


Sydney Metro City & Southwest is a new 30km metro line extending metro rail from the end of Sydney Metro Northwest at Chatswood under Sydney Harbour, through new CBD stations and southwest to Bankstown. It is due to open in 2024 with the capacity to run a metro train every two minutes each way through the centre of Sydney.


Further information on the project is available at www.sydneymetro.info


The Sydney Yard Access Bridge (SYAB) project forms part of the Sydney Metro City & Southwest project.


To date, access to Sydney Yard is limited to medium-sized vehicles form Eddy Avenue via Central Station platform 15, and heavy vehicles from the vicinity of Mortuary Station via an at-grade ballast access crossing over the inter-city running lines during track possessions.


The SYAB is a new permanent road bridge that will provide a connection from Regent Street into the Sydney Yard. In particular, the SYAB will extend from Regent Street over the Mortuary Station line and intercity tracks into the Sydney Yard.


The users of the SYAB will include:

  • the contractors responsible for the construction of the Sydney Metro City & Southwest works at Central Station

  • the contractors responsible for other construction activities at Central Station

  • the operator and maintainer of Sydney Metro; and

Sydney Trains and NSW Trains for the purpose of maintenance activities and periodic major projects in and around Sydney Yard.


For all work packages, registrants are required to download, complete and sign the two project documents and email to: SYABcommercial@laingorourke.com.au


The two forms are available to download from the Project Documents section below.


Please note that you will only need to complete these forms once, regardless of how many work packages you register for within this project. 

SHOW LESS

Associated Opportunities


SHOW MORE

Project Documents


Documents to be submitted with EOI

  ▲ CONTRACT
E-T-3-0461 Supply Chain HSES Evaluation
Confidentiality Undertaking
SHOW LESS

Work Packages


To submit an expressions of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   DOCUMENTS TO BE SUBMITTED WITH EOI    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Electrical Package4 May 1725 May 17 
Electrical Package
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Hard & Soft Landscaping15 Jun 1729 Jun 17 
Hard & Soft Landscaping
Drainage Works17 Jun 178 Jul 17 
Drainage Works
Anti-Graffiti Structural Steel Surface27 Apr 1717 May 17 
Anti-Graffiti Structural Steel Surface
Architectural Cladding Panels22 May 1712 Jun 17 
Architectural Cladding Panels
Bridge Protection Screens22 May 1712 Jun 17 
Bridge Protection Screens
Buffer Stop27 Apr 1711 May 17 
Buffer Stop
Communications & CCTV4 May 1725 May 17 
Communications & CCTV
Concrete Supply27 Apr 1714 Jun 17 
Concrete Supply
Demolition Package27 Apr 1711 May 17 
Demolition Package
Electronic Access Control Systems (EACS)10 May 1731 May 17 
Electronic Access Control Systems (EACS)
Expansion Joints27 Apr 1717 May 17 
Expansion Joints
FRP & Civils (incl. Tower Crane base, bridge, retention structure & Regent St. Protection slab)27 Apr 1711 May 17 
FRP & Civils (incl. Tower Crane base, bridge, retention structure & Regent St. Protection slab)
General Labour Hire27 Apr 171 Jun 17 
General Labour Hire
General Plant Hire27 Apr 1731 May 17 
General Plant Hire
OHW Works1 May 1722 May 17 
Overhead Wire: (OHW) is the 1500v Sydney Trains overhead wire that provides power to the trains on the network.

Permanent Fencing and Gate24 May 1714 Jun 17 
Permanent Fencing and Gate
Piling Platform27 Apr 1717 May 17 
Piling Platform
Precast (incl. mould)27 Apr 1711 May 17 
Precast (incl. mould)
Quarry Supply27 Apr 1717 May 17 
Quarry Supply
Reinforcement (Piles, Pile Caps, Piers & Deck)25 May 178 Jun 17 
Reinforcement (Piles, Pile Caps, Piers & Deck)
Signage Package11 May 171 Jun 17 
Signage Package
Signalling Cables / Equipment27 Apr 1711 May 17 
Signalling Cables / Equipment
Signalling Investigation27 Apr 1711 May 17 
Signalling Investigation
Signalling Works27 Apr 1711 May 17 
Signalling Works
Site Security27 Apr 1711 May 17 
Site Security
Site Waste Management27 Apr 1711 May 17 
Site Waste Management
Soil Disposal and Classification Testing27 Apr 1716 Jun 17 
Soil Disposal and Classification Testing
Structural Steel and Composite Box Girders (incl. Shop Drawings)27 Apr 1711 May 17 
Structural Steel and Composite Box Girders (incl. Shop Drawings)
Track work27 Apr 1716 May 17 
Track work