Continuum - Metro Tunnel Project - Tunnel & Stations PPP



Contact Details


  Peter McCracken
  ICN - VIC
  (04) 0750 5477
CONTACT EMAIL

  Chris Reilly
  ICN - VIC
  (04) 3961 6759
CONTACT EMAIL

  Locations: VIC Australia
  Project Value: $6 billion
  Project Status: Bid Phase
  Project Owner Acciona Ferrovial Joint Venture

Project Details


About Continuum

Continuum is one of three consortia that have been shortlisted for this $6 billion Public Private Partnership (PPP) to build the Metro Tunnel. The Continuum consortium is made up of organisations that bring the best local and international experience to deliver this city-changing project in a manner that reflects Melbourne and cements the city's reputation as the most liveable city in the World.  


About the Project

The scope of the Project includes over 9km of twin tunnels, five underground stations, station fit-out, mechanical and electrical systems, specific maintenance services for the infrastructure delivered by the package and commercial opportunities at the new stations.


Responsible for the design and construction of the project, the Construction Joint Venture is composed of Acciona Infrastructure Australia and Ferrovial Agroman (Australia). Between Acciona and Ferrovial, these experienced contractors have completed over 650km of tunnelling (including 400km of TBM tunnelling) and 200 underground stations, including the landmark Crossrail rail tunnel project in London and Barcelona Line 9 in Spain, the longest underground line in Europe with 50km of tunnels and 52 stations along the alignment. Following on from overseas successes, these contractors have now firmly cemented their tunnelling and rail credentials in Australia with the completion of Legacy Way in Queensland and the current delivery of Sydney Light Rail in New South Wales.


Continuum is seeking Expressions of Interest (EOIs) from interested suppliers and contractors for a wide range of work packages that will be required to construct the project. A list of work packages is being constantly updated and uploaded onto this ICN gateway project page.


Specific criteria that interested parties will need to comply with include: 

  • Health & Safety
  • Quality Assurance
  • Environmental & Sustainability
  • Transparency & Ethics
  • Conflict of Interest & Intellectual Property Rights
  • Victorian Industry Participation & Local Employment
  • Major Project Skills Guarantee
  • Aboriginal Employment & Business Engagement
  • Social Procurement
  • National Code of Practice for the Construction Industry
  • Commercial & Contractual Obligations
  • Insurance Coverage


Supplier Pre-Qualification

A Continuum supplier questionnaire pre-qualification document is listed below under the Project Documents section of this page.


Interested suppliers and contractors are encouraged to download and complete this document although it is not a compulsory requirement during the EOI phase.  


Project Timelines

Shortlisted bidders for the PPP have been asked to submit a formal proposal by early 2017. A contract is expected to be awarded by the end of 2017 with work to begin shortly thereafter.

 

Local Industry Participation Opportunity - 'Meet Continuum'

Continuum, together with ICN, are committed to providing full, fair and reasonable opportunity for capable local industry to participate across its supply chain opportunities, and reflect the project teams' commitment to local industry participation.


Come along to this event to meet the Continuum consortia construction project team, find out about their requirements and understand how they are building supply chain capability.

 

Event Details

Date: Tuesday 13 December 2016

Time: 4.00pm - 6.00pm

Cost: FREE

Venue: Grand Star Reception & Convention Centre
499 Grieve Parade, Altona North, VIC 3025

CLICK HERE  to register for the event.


Important notes about event registration:

  1. Event registration closes when maximum capacity is reached or by Friday 9 December 2016 at 3.00pm (whichever is sooner).

  2. Please ensure you reserve your place by registering through the event registration web link provided above. Sending an Expression of Interest on the 'Industry Briefing Session' work package listed below does not constitute registration for the event.

 

HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • Work Packages currently available to submit an EOI for are listed below. It is expected that additional work packages will be available following the briefing session.
  • To submit an EOI for any of the Work Packages listed, companies must have an ICN Gateway company profile that is complete and up to date. Information on how to register your company on ICN Gateway is detailed below.
  • All companies who submit an EOI will be included in information presented to Continuum for this project.
  • Continuum will be provided with your detailed company profile outlining capabilities to supply into the project. It is important that businesses submitting an EOI are aware that their submission does not guarantee that they will progress further in the procurement process. Only companies that can demonstrate capability and capacity in accordance with Continuum's standards will be invited to pre-qualify for specific opportunities.
  • When the work packages are listed on ICN Gateway, your company will be notified provided you have selected relevant capabilities in the Notification section of your company profile on ICN Gateway.
  • Register your interest as a full or partial scope supplier (where applicable).
  • Respond to all project and work package specific questions (where applicable).
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complimenting a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

 

ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance is available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email Notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Major Projects and Construction Opportunities.

(1) ICN Gateway Setup Wizard

(2) ICN Victoria 2015 Gateway User Guide



SHOW LESS

Project Documents


A. Industry Briefing Session

  ▲ CONTRACT
Continuum Presentation - Metro Tunnel & Stations PPP Bid Phase Tender Update
'Meet Continuum' Event - Metro Tunnel & Stations PPP Bid Phase - 13 Dec 2016
Continuum - Metro Tunnel Stations - Industry Briefing Event Flyer - 08 Feb 2017
Continuum - Metro Tunnel Stations - Industry Briefing Event Flyer - 15 Feb 2017 (002)
MMTS Continuum Presentation 8 Feb 2017

B. Subcontracting Opportunities

  ▲ CONTRACT
Continuum - MMTS - Vendor Prequalification Questionnaire - Nov 2016
SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   A. INDUSTRY BRIEFING SESSION    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Continuum | Meet the Builder | Metro Tunnel & Stations PPP Bid Phase | Tue 13 Dec 2016 | 4pm - 6pm28 Nov 1613 Dec 16n/a
Continuum, together with ICN, are committed to providing full, fair and reasonable opportunity for capable local industry to participate across its supply chain opportunities, and reflect the project teams' commitment to local industry participation.

Come along to this event to meet the Continuum consortia project team, find out about their requirements and understand how they are building supply chain capability.

Date: Tuesday 13 December 2016

Time: 4.00pm - 6.00pm

Cost: FREE

Venue: Grand Star Reception & Convention Centre
499 Grieve Parade, Altona North, VIC 3025

To register, please go to: http://bit.ly/continuum_mtsbid

Download the attached document for event details.

Note: Sending an Expression of Interest on this work package does not constitute registration for this event. Please ensure you register via the link provided above.
STATUS   B. SUBCONTRACTING OPPORTUNITIES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Compressed Air Systems (Inclusive of Pipework)8 Feb 1722 Feb 1722 Feb 17
Express interest for potential Compressed Air Systems including pipework opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Concrete Pumps & Spraying Equipment28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Concrete Pumps & Spraying Equipment opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Concrete Works incl. Structural, Precast, Flooring & Paving28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Concrete Works incl. Structural, Precast, Flooring, Paving opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Concrete, Shotcrete, Fly Ash & Lime Supply28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Concrete, Shotcrete, Fly Ash & Lime Supply opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Contaminated Soil Treatment28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Contaminated Soil Treatment opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Formwork and Scaffolding Systems28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Formwork and Scaffolding Systems opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
General Equipment Hire28 Nov 1610 Mar 1710 Mar 17
Express interest for potential General Equipment Hire opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Heavy Equipment Hire (Major Plant)28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Heavy Equipment Hire (Major Plant) opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Labour Hire incl. Traffic Control, Maintenance, Cleaners and Security28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Labour Hire including Traffic Control, Maintenance, Cleaners and Security opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Landscaping & Site Reinstatement28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Landscaping & Site Reinstatement opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Mining Tunnel Equipment incl. Transport, Conveyors, Grouting28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Mining Tunnel Equipment incl. Transport, Conveyors, Grouting opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Overhead Gantry Crane Supply28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Overhead Gantry Crane Supply opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Piling, D-Walls & Ground Treatment28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Piling, D-Walls & Ground Treatment opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Precast Equipment incl. Moulds & Lifting Clamps28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Precast Equipment incl. Moulds & Lifting Clamps opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Providers - Indigenous Employment28 Nov 1610 Mar 1710 Mar 17
Continuum is seeking to expand its database of Indigenous Employment providers.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Providers - Social Capital / Procurement28 Nov 1610 Mar 1710 Mar 17
Continuum is seeking to expand its database of Social Capital / Procurement providers.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Spoil Haulage 28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Spoil Haulage opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Structural Steel Supply & Fabrication Work28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Structural Steel Supply & Fabrication Work opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
TBM Tunnel Equipment28 Nov 1610 Mar 1710 Mar 17
Express interest for potential TBM Tunnel Equipment opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Temporary Power Supply, Transformers, Equipment Rooms28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Temporary Power Supply, Transformers, Equipment Rooms opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.
Water Treatment Plant, Slurry Plant, Rainwater Harvesting28 Nov 1610 Mar 1710 Mar 17
Express interest for potential Water Treatment Plant, Slurry Plant, Rainwater Harvesting opportunities on this project.

Interested suppliers will need to comply with specific criteria as outlined in the 'Project Details' section above.

Shortlisted suppliers/contractors will be required to complete Continuum's pre-qualification document. A copy of this document is available for download under the 'Docs' column of this work package listing.