Project Details


KEPCO proposes to develop the Bylong Coal Project, located approximately 55 km north-east of Mudgee and 53 km from Denman in New South Wales, Australia. The purpose is to extract, wash and export coal. The Bylong Coal Project proposes to supply 6.5 million tonnes (ROM) of thermal coal per annum to the export market. The mine will cover an area of approximately 3,000 ha and will include two open-cut mining areas and an underground mining area.

The mine is likely to employ up to 665 people during construction and maintain a workforce of approximately 290 people during operations.

The life of mine is expected to be approximately 25 years, with open-cut operations commencing around year 4 and operation of an underground mine commencing afterwards at around year 7. Coal will be transported from the Project site to the Port of Newcastle via rail, which will require the construction of a dedicated rail loop connecting to the existing Sandy Hollow-Gulgong Line.

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   EQUIPMENT - OPERATIONS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Substations, Switchgear Cables 29 Sep 1531 Mar 1831 Mar 18
Supply of HV and LV power to site,including transmission towers and reticulation around site
Coal Bins29 Sep 1531 Mar 1831 Mar 18
Loading coal trains.
Load coal waste to trucks.
CPP feed surge bin
Coal Prep Plant (CPP) Excluding Dewatering29 Sep 1531 Mar 1831 Mar 18
Complete CPP Plant, Including CPP primary washing equipment (Mechanical, Electrical, Instrumentation, CPP Surge Bin)
Coal Preparation . Dewatering29 Sep 1531 Mar 1831 Mar 18
Centrifuges, Thickener and Belt Filter Press
Communications equipment 20 Jun 1731 Mar 1831 Mar 18
Communications equipment
Conveyor system ( including belt, drives, motors, motor starter panels, brakes and structural steel)29 Sep 1531 Mar 1831 Mar 18
Complete surface conveyor systems
including drives, belting,motors and starters brakes and structural steel
Rail Track System 29 Sep 1531 Mar 1831 Mar 18
Rail Switching and Signalling Systems.for balloon loop
Raw Coal Feed System 29 Sep 1531 Mar 1831 Mar 18
Feed and Crushing Plant.
Stockpile and Reclaim System: Stacker reclaimers29 Sep 1531 Mar 1831 Mar 18
Includes product stockpile structures, coal flow activators and feeders.
Includes dust and fire management.
Water reticulation equipment 20 Jun 1731 Mar 1831 Mar 18
Water reticulation equipment
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Above-ground Mine Infrastructure23 May 1731 Mar 18 
e.g. concreting, road works, office accommodation, fencing, water reticulation
Civils - Bulk earthworks 20 Jun 1731 Mar 1831 Mar 18
Civils - Bulk earthworks
Civils - Dams20 Jun 1731 Mar 1831 Mar 18
Civils - Dams
Civils - Roads20 Jun 1731 Mar 1831 Mar 18
Civils - Bulk earthworks
Professional services and labour hire23 May 1731 Mar 18 
e.g. environmental services, surveying, security, logistics, labourers
Services or goods not included elsewhere23 May 1731 Mar 18 
Goods and services not included in any other work package