BLUEFLOAT AUSTRALIA HOLDINGS PTY LTD

GIPPSLAND DAWN OFFSHORE WIND PROJECT

location_onVIC Australia
location_on

VIC Australia

business

BLUEFLOAT AUSTRALIA HOLDINGS PTY LTD

Project Primary Contact
person_outline
Colin Young - Victoria
Industry Adviser
phone_enabled
+61 438 753 428
Overview

Project overview
BlueFloat Energy is developing the Gippsland Dawn Offshore Wind Project in the Gippsland offshore wind zone, in Bass Strait, off the Victorian coast.
The wind turbines and offshore substations will be approximately 10-33 km from the coast between Paradise Beach and Ocean Grange, in Gippsland.
The proposed project includes up to 140 fixed foundation wind turbines, four offshore substations and associated infrastructure. It has the capacity to generate up to 2.1 GW of electricity - that's enough to power more than one million homes.
The Federal Government recently announced an intention to award BlueFloat Energy a feasibility licence for the Gippsland Dawn. This licence will enable the project to conduct technical and environmental feasibility studies.
A management plan under the Offshore Electricity Infrastructure Act will be prepared to enable various investigative activities in Commonwealth waters, and in due course, the construction and operation of the project. A commercial licence is required for the project to move into the construction phase.

Project development timeline
2022 - 2024 Phase 1
Pre-feasibility studies
Preliminary site studies and desktop assessments.

2024 - 2029 Phase 2
Feasibility Licence awarded
Planning and approvals
Detailed technical studies and surveys to be completed as part of Gippsland Dawn's Management Plan. Gippsland Dawn will continue to seek feedback and engage closely with stakeholders and the community.

2029 Phase 3 (2 to 3 years)
Construction
A commercial licence is required for the project to move into the construction phase. It can be applied for once the project is environmentally, technically, and commercially viable.

2031 Phase 4 (up to 30 years)
Operations and maintenance
Up to 140 fixed foundation wind turbines, four offshore substations and associated infrastructure in operation, generating up to 2.1 GW of electricity!

2061 Phase 5 (18 to 24 months)
Decommissioning
Decommissioning strategy deployed.
As part of the project's approval, Gippsland Dawn will have a comprehensive decommissioning strategy

Opportunities
We are committed to supporting industry in Gippsland, Victoria and Australia.
Gippsland Dawn will seek to secure key contracts for various project elements, including turbines, foundations, cables, substations, grid connections, transport and installation services.
We will provide information about local businesses registered on the ICN Gateway to contractors bidding for these contracts.
Downstream opportunities through the successful contractors may include marine operations support, logistics support, civil construction, site services, and electrical and mechanical completions.
Gippsland Dawn encourage all businesses to submit an expression of interest if you would like to be a part of the development, construction and/or operation of this project.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.


ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.


1) Gateway by ICN Setup Wizard

2) Gateway by ICN User Guide

3) Gateway by ICN EOI User Guide

42
Total Work Packages
42
Other Work Packages
42
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
1.0 Development Phase - Consulting and/or Surveys
Status
Closed
Full scope EOI closes on
18 Dec 2024

Offshore geotechnical and geophysical surveys at the proposed wind farm site and along the offshore export cable route.
Onshore geophysical and geotechnical surveys along the onshore export cable route.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Deployment, installation, maintenance, and recovery of floating lidar unit(s).
Analysis of metocean data.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Environmental surveys for the proposed wind farm (including both the offshore environment and also along the onshore export cable routes).

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Electrical engineering, structural engineering, geosciences, transport and installation analysis, wind turbine engineering.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

General legal counsel, procurement advisory, easement negotiation, insurance brokerage etc.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Development Phase - Consulting and/ or Surveys

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Express interest for any opportunities that may arise for this project.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

2.0 Fabrication Phase - Wind Turbine
Status
Closed
Full scope EOI closes on
18 Dec 2024

Fabrication of wind turbine blades, nacelles, towers. This also includes the major subcomponents e.g. bearings etc.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Internals within the wind turbine e.g. ladders, access platforms, fall arrest devices, fasteners.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Fabrication Phase - Wind Turbine

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

3.0 Fabrication Phase - Steel Foundations
Status
Closed
Full scope EOI closes on
18 Dec 2024

Fabrication of monopiles, pin piles, jacket modules or transition pieces. Provision of appropriate plate steel.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Fabrication of secondary steel items e.g.: ladders, handrails, access platforms, gratings etc.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Welding and assembly fit out capability.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Fabrication Phase - Steel Foundations

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

4.0 Fabrication Phase - Concrete Foundations
Status
Closed
Full scope EOI closes on
18 Dec 2024

Supply of sands, aggregate, cement, formwork, admixtures, batching equipment etc

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Construction capability for large structures which may include in-situ casting, pre-fabrication of components, post tensioning etc

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Supply of reinforcement steel. Bending the reinforcement steel to the required shape/ layout.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Fabrication Phase - Concrete Foundations

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

5.0 Fabrication Phase - Onshore Electrical Infrastructure
Status
Closed
Full scope EOI closes on
18 Dec 2024

Construction of the onshore substation. This includes the key equipment e.g. high voltage switch gear, transformers etc.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Supply and/ or installation of high voltage onshore cables.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

HDD will likely be required at the shore landing.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Fabrication Phase - Onshore Electrical Infrastructure

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

6.0 Fabrication Phase - Offshore Electrical Infrastructure
Status
Closed
Full scope EOI closes on
18 Dec 2024

Fabrication of offshore substation topside, including any of the components e.g. high voltage switch gear, transformers, etc

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Supply of offshore array cables

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Supply of high voltage offshore export cables

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Fabrication Phase - Offshore Electrical Infrastructure

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

7.0 Port Infrastructure
Status
Closed
Full scope EOI closes on
18 Dec 2024

Related to the port used for the construction phase of an offshore wind farm (i.e able to accommodate large construction vessels and significant component storage/ handling). Includes e.g. provision of associated services at the port.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Related to the port used for the operations phase of an offshore wind farm (i.e. able to accommodate crew transfer vessels and/ or service operating vessels and Operations Base). Includes provision of associated services at the port.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All services associated with an offshore wind port. Handling, load-in/ load-out, storage of heavy components. Management of personnel logistics and tools/ spares. Marine services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Port Infrastructure

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

8.0 Transport, Installation and Commissioning Phase
Status
Closed
Full scope EOI closes on
18 Dec 2024

Onshore cranes for assembly of foundations and towers, potentially also for load-in of components at port, among other requirements.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

SPMTs and/ or skidding systems or similar.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Jack up vessel, heavy lift vessel, support vessels, associated services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Cable laying vessels and associated services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Transportation vessels, heavy lift vessels and associated services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Design, fabrication and operation of crew transfer vessels and/ or service operating vessels. Helicopter operations. Associated services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Commissioning of offshore wind turbine generators and offshore substations etc.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Transportation vessels and associated services.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Transport, Installation and Commissioning Phase

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

9.0 Operations and Maintenance
Status
Closed
Full scope EOI closes on
18 Dec 2024

Operation and maintenance of wind turbines, foundations, substations, electrical infrastructure, vessels, onshore facilities.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

Operation of helicopter or vessels for the transport of technicians from shore to the wind turbines/ offshore substations.

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
18 Dec 2024

All other products/services for Operations and Maintenance

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.