NSW Australia
Future Generation JV
Future Generation is a joint venture created specifically to build Snowy 2.0 on behalf of Snowy Hydro Limited. We bring the combined engineering expertise of three companies – Italy’s Salini Impregilo, Australian-based Clough and US-based Lane Construction. Our team’s pair local expertise with global experience.
Snowy 2.0 will supercharge the Snowy Scheme’s existing hydro-electric generation and large-scale storage capabilities. The fast-start, on-demand generation of pumped-hydro and Snowy 2.0’s massive storage capacity will be vital as more intermittent, renewable energy sources such as wind and solar come online and coal-fired power stations retire.
Snowy 2.0 will add 2,000 megawatts of energy generation and provide 175 hours of storage for the National Electricity Market (NEM), enough to ensure the stability and reliability of the system during prolonged weather events, such as wind or solar ‘droughts’.
Snowy Hydro already plays a critical role in ensuring system stability and at times of peak demand, we keep the lights on. Snowy 2.0 will enhance our existing capability and ensure that we can continue to provide increased stability and security to the energy market well into the future.
The project links two existing Scheme dams, Tantangara and Talbingo, through tunnels and an underground power station with pumping capabilities. Hydro-power will be generated by falling water spinning Snowy 2.0’s giant reversible turbines, which can also pump water in the opposite direction.
Snowy 2.0’s pumping capabilities work in a ‘closed’ system – water is recycled between the upper dam (Tantangara) and lower dam (Talbingo) so the same water can be used to generate power more than once, making the most of available water. Snowy Hydro already has pumped-hydro capabilities at the Tumut 3 Power Station - it is proven technology used across the world
The ability to store water and generate power on-demand means Snowy 2.0 can be ‘switched on’ very quickly. Snowy 2.0 will pump water using the excess electricity in the system at times of low demand. Then, when energy is needed most, the stored water will be used to generate electricity within minutes.
For example, if the wind is blowing in the middle of the night when consumers are asleep, Snowy 2.0 can use the wind energy to pump and then store the water in the upper dam. When households wake up and the demand for energy soars, Snowy 2.0 can quickly generate energy for the grid.
The first power produced from Snowy 2.0 is expected in late 2024-25, with progressive commissioning on the six units. Snowy 2.0’s operating life is expected to be consistent with the Snowy Scheme’s existing assets, which continue to operate reliably many decades after installation.
Building Snowy 2.0
The project will involve underground excavation and tunneling works between Tantangara and Talbingo dams to depths of up to one kilometre. There will be surface works in several locations including intake-outlet structures at Talbingo and Tantangara dams, surge shafts and tunnel portal sites. A number of supporting works are also required, such as establishing or upgrading access roads, and electricity connections to construction sites.
CONSTRUCTION
About 27km of power waterway tunnels will be constructed to link Tantangara and Talbingo dams. The tunnels are about 10m in diameter and entirely concrete-lined to ensure construction safety, operational longevity and low maintenance. Intake and outlet structures will be constructed at both dams.
The power station complex will be located approximately 800m underground. Two main caverns will be excavated:
● Machine hall - approx. 240m (long) x 50m (high) x 30m (wide).
● Transformer hall - approx. 200m (long) x 50m (high) x 20m (wide).
Six galleries run between the two halls and carry cables that connect the generators with the transformers.
To reinforce the structure, rock bolts of 15 to 20m in length will be drilled into the rock at the top and sides of each cavern. Up to three tunnel boring machines, as well as drill and blast techniques, will be used for tunneling and excavation.
MECHANICAL AND ELECTRICAL
The power station will house six reversible Francis pump-turbine and motor-generator units. Three units will be synchronous (fixed) speed and three will be asynchronous (variable) speed. The units will be arranged in the power station in alternating order. There will be a single inclined pressure tunnel that is concrete-lined and will divert water into six steel-lined penstocks (the tunnels that feed water into the generating units).
To find out more about Future Generation JV please visit the website www.futuregenerationjv.com.au
To find out more about the Snowy 2.0 https://www.snowyhydro.com.au/our-scheme/snowy20 /
COMMUNITY ANNOUNCEMENTS
- Community Notification: Apr 2020 - Segment Factory pre-construction at Polo Flat - Cooma
- Media Release: The Polo Flat segment factory for Snowy 2.0 brings local jobs and investment – 2 April 2020
- Media Release: Snowy Hydro welcomes planning approval for Snowy 2.0 Exploratory Works – 11 February 2019
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in design of Structural, Civil,
Mechanical and Geotechnical works etc
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation is seeking to identify suppliers that have the ability and plant equipment to provide:
. External Access Road & Bus Stop to the Polo Flat Segment Factory.
. Fully operational plants with monitoring systems and accessories.
. Equipment should be to Industry safety and maintenance standards.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation is seeking to identify suppliers that have the ability and plant equipment to provide:
. Concrete FRP Footings, Slabs, Aggregate Bays at the Polo Flat Segment Factory
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like potential suppliers to register expression of interest for Supply of Steel Fibre for Concrete Segment Lining in the Tunnels
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Please register for the opportunity to supply capabilities or products that may not be listed elsewhere
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Subcontractor is required to submit a fee proposal for the Main Roads Construction as below.
. Pipeline Rd -Adit Platforms Stage 2,
. Ravine Road Stage II (Ch. 0-7,000),
. Ravine Rd Stage II (Ch 7,000-14,000),
. Talbingo Spoil Rd,
. Talbingo Construction Access - Low Haul Rd,
. Talbingo Permanent Access, Talbingo Construction Access - Upper Haul Rd,
. Marica Trail Rd (Part I),
. Marica Trail Rd (Part II),
. Surge Shaft Access Rd,
. Marica West RD (Part I),
. Marica West Rd (Part II),
. Tantangara Rd, Quarry Trail Rd,
. Tantangara Barge Ramp,
. Tantangara Camp Rd (becomes Spoil Haul Rd),
. Tantangara Intake Access Rd (Upper),
. Tantangara Intake Access Rd (Lower) 1,
. Tantangara Stockpile Access Rd.
. Please see attached Drawings
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
In this SOW the supplier is to provide 5 cranes for the assembly
of TBM 4, the rated capacity of each crane are as follows:
i) 1 x Crawler crane 750t capacity
ii) 2 x Crawler cranes 250t capacity
iii) 1 x Franna crane 25t capacity
iv) 1 x Franna crane 40t capacity
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply and Placement of Asphalt across the project
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in balance of plant electrical systems,
communication system and integrated security systems
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the supplying bottled
drinking water including transport to the respective sites and shall
comply with to Chain of Responsibility requirements as per the
Australian Legislation.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the following scope of
supply.
- Specification of Bulk Diesel:
a) Automotive Diesel Fuel - Ultra Low Sulphur
b) Alpine Diesel - Winter Fuel
- Delivery Locations:
1) Poloflat = 1 Tank of 43,950 Liters
2) Lobs Hole = 8 Tanks of 43,950 Liters
3) Marica = 1 Tank of 29,350 Liters
4) Tantangara = 4 Tank of 43,950 Liters,
1 Tank of 30,000 Liters
1 Tanks of 60,000 liters
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The scope of service encompasses the provision and management of shuttle
bus transportation Services for the Personnel Logistics of the Snowy 2.0
Project. The Scope is divided into key phase described below;
Phase 1 - External Personnel Logistics Runs (Wet Hire Buses)
Phase 2 - Internal Personnel Logistics (Dry Hire of 4x4 Mine Spec. Buses)
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Subcontractor is required to submit a fee proposal for the design, fabrication and construction for water treatment plant for the main yard at Polo Flat in Cooma.
. Capacity 2Lts/sg with the following process equipment.
. Plug & Play type
. All internal piping and electrical cables included
. For batching plant and workshop operations as a containerised unit.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Design and Supply formwork for various constructions sites project wide,
preliminary details are specified in document available for download
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Design fabrication and construction Air Tight Asbestos Steel Structure Shed
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This Scope of Work (SoW) covers the design, fabrication, supply, and
erection of a special airtight shed that complies with Asbestos safe
handling and containment standards, which is to be built around the
existing Slurry Treatment Plant (STP) at Tantangara, for the plant to
treat potential asbestos content. Total shed area is approximately 7100
m2.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in supply, fabrication, delivery,
erection, and completion of all structural steelwork for the buildings.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in design, supply and installation of
drip shield for cavern and tunnel.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation is seeking to identify suppliers that have
the ability to provide:
-Digital marketing support
-Website design services
-Social media campaigns
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of supply of 600mL drinking water bottles
- Provision of supply of 15L drinking water bottles (returnable)
- Provision of supply of water dispensers (hot & cold) to suit the 15L
bottles
- Suitable cages to suit the 15L bottles for delivery and return
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation is seeking to identify suppliers that have the ability and plant equipment and material to provide:
. Earthmoving, Drainage, Stablisation and Pavement at the Polo Flat Segment Factory
. Site preparation
. Wet and dry labour capability and supplies for civil works
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Excavation works including installation of grout curtain to reduce permeability of the natural rock.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Fabrication and supply of 8 x Temporary Steel Frames for Cross Package excavation including radius bending, the structure will be installed on one side of the tunnel approx. 11 M diameter to Snowy 2.0 Project Construction Sites. Refer to photo for further clarification of scope.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation is seeking to identify suppliers that have the ability, plant equipment and material to provide:
. Fencing services at the Polo Flat Segment Factory
. Labour and supplies for construction works
. Design of fencing requirements
. Supply of fencing items
. Supply of security items
. Installation of fencing
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a company with proven, project experience of, Fire Suppression System Commissioning and Maintenance Services Site wide for the Snowy Hydro 2.0 Project.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
- The subcontractor's general scope of works is to install the civil works for various site installations and facilities to be used for the construction of the ECVT (Emergency Cable and Ventilation Tunnel). Main Yard, Talbingo and Tantangara civil works. This shall include subgrade preparation, blinding, installing precast concrete blocks or installing formwork, reinforcement and pouring concrete for casting in-situ concrete slabs.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the works of Formwork
Erection and dismantling, Fixing Reinforcement, Concrete Placement for the
works Intake Diffuser Structure, HRT Tunnel at Tantangara
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience Design, Certification, fabrication,
Supply, Installation, and commissioning of Steel formwork moulds
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This Scope of Work covers the provision tools and equipment to undertake the excavation and lining of the Headrace Surge Shaft (HSS) which will be the hydraulic shaft upstream for the Snowy 2.0 project
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven, project experience for Horizantal Directional
Drilling at Marica Road West
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven, project experience for Hydromulching services at
Lobs Hole, Marica and Tantangara Sites
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The SOW for the hydro mulching contractor (Subcontractor) will be to provide personnel, equipment, and materials for hydro mulching and hydroseeding of slopes, batters, drains and any other areas as identified by FGJV. The SOW may include subsequent maintenance and watering of treated areas until such time that adequate cover and stability have been achieved to the satisfaction of FGJV.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Subcontractor is required to submit a fee proposal for the execution of the following works:
supply and installation of both precast and cast insitu foundations for modular buildings, stair foundations, laundry slab and other miscellaneous foundations, slabs, driveways.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven project experience for the manufacturing and
supply of Steel Couplers with disc springs (precision engineering) used
in the alternative design solution, under study, for the Inclined Pressure
Shaft (IPS). The IPS is a mechanically excavated hydraulic tunnel (using
a TBM) with an internal diameter of 9,84m and a length of about 1.52
kilometers. The application of FACS (Force-Activated Coupling System)
segments is extended for about 200m beyond the IPS on either side, for
a total length of application of about 1.952km, which corresponds to
about 976 rings (each 2m long).
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This indicative Scope of Work covers the provision labour, plant and equipment to undertake the installation of modular accommodation units and associated facilities for the Marica Camp on the Snowy 2.0 Project
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of Work includes:
Excavation, Erosion & Sedimentation Controls, construction of drainage channels, slope treatment and stabilization;
- All excavation to cover the Pad (including necessary drill and blast activities);
- Slope treatments as detailed (Shotcrete, Steel Wire Mesh & Diagonal Strip Drain); Rockbolt & Subhorizontal Drainage;
- Tecco System (Erosion Control Matting & Tecco Steel Wire Mesh);
- Drainage channels on benches;
. Yard Surface Drainage excavation (AS AN OPTION)
. Yard Surface Drainage construction (AS AN OPTION).
. Settlement Pond construction (AS AN OPTION)
. Survey and setting out (AS AN OPTION)
. Fixed surveying points Installation
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in subaqueous excavation.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Two intake-outlet structures are planned to connect the Tantangara
(upstream) and Talbingo (downstream) Reservoirs. The intake gates will
act as the primary closure devices of the power waterways.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This indicative Scope of Work covers the provision labour, plant and equipment to undertake the installation of modular accommodation units and associated facilities for the Pacific Hills Camp for the Snowy 2.0 Project
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Pipe supports as per downloadable document
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Gen is interested in the following plant:
. Truck-mounted sprayed concrete boom pump.
. Concrete agitator truck 3.5m3/5m3/9m3.
. Concrete pump 30m3/87m3.
. Injection plant dosing system.
. Pneumatic concrete vibrator 75mm.
. Gasoline vibrating levelling screed 5250mm.
. Trowl.
. Electric concrete vibrator for cls 35mm.
. Jackhammer
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Gen is interested in the following plant:
. Pressure relief valves.
. Air release valves.
. Isolation valves.
. Gate valves.
. Water reservoirs.
. Flow valves.
. Water level sensors.
. Paddle level indicators.
. Flow dividers.
. Hydrant valves.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Gen is interested in the following plant:
. Bench grinder.
. Bench sander.
. Hydraulic press.
. Sliding bench saw.
. Hand tools.
. Industrial lathes.
. Magnetic drill press.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the scope of
Establishing a Framework Agreement for Supplying of Portable Water
project wide for a period of minimum of 12 months. Required locations
are Lobs Hole, Tantangara, Maria, Polo Flat, Rock Forrest and
Gooandra Trail.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Pre Employment Medical Services
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Subcontractor is required to submit a fee proposal for Project wide Spoil Management.
The project involves significant open and underground excavation which is expected to generate
about 8 million cubic metres of waste rock. Some of the spoil material will be re-used in the
construction of the permanent works, such as for road construction, back-filling of structures and
for tunnel portal accesses. However, most of the spoil material is to be placed in permanent spoil
emplacement areas within the project, at the locations listed
Within the following Areas:
Lobs Hole Main Yard
Lobs Hole GF01
Peninsula at Tantangara reservoir
Ravine Bay (wet and dry emplacement)
Rock Forest
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of Training Services
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in vertical shaft excavation by raise
borer machine.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the following scope
of reinforced concrete works,
1. The installation and dismantling of formwork/falsework,
reinforcement steel installation and concrete pours of final lining for
the following structures within Snowy 2.0 project at Tantangara Site
as shown on Figures 1 and 2:
a. Transition Structure C1 (50m length)
b. Connection Tunnel
c. Transition Structure C2 (20m length)
d. Transition Structure C3 (12.9m length)
e. HRT01-01 Tunnel
f. Gate Shaft Lining
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Subcontractor is required to submit a fee proposal for the design and approval of the road work for the critical points identified below. The following locations require road work upgrades. (See Appendix B for map locations):
1) Link Road & Lobs Hole Ravine Road South Intersection, Kosciuszko National Park.
2) Lobs Hole Ravine Road North & Snowy Mountain Highway Intersection, Kosciuszko National Park
3) Lobs Hole Ravine Road North, Kosciuszko National Park.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven, project experience for supply of scaffolding
material with erection and dismantling services.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Project site where security services are required defined as follows
Link Road Ravine Road Entrance
Snowy Mountains Highway Tantagara Entrance
Snowy Mountains Highway Marica Entrance
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a transport contractor on a personnel labour hire / dry hire agreement to manage the delivery of the Oversize Overmass (OSOM) precast concrete tunnel segments from the point of manufacture at the Polo Flat segment factory in Cooma NSW to the installation site locations at Lobs Hole, Tantangara, Marica & Talbingo in the KNP.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Execution of an elliptical intake gate of a 50 meters height and
diameters of 20 and 14.6 meters at Tantangara sites.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven, project experience for the Spoil Management at
Lobshole and Tantangara Sites for an approximate quantity of 5 million
cubic meters
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Steel component manufacturing and assembly in accordance with the Engineering Design workshop excluding welding, heat treatment, and corrosion protection. Steel Fabrication works would be performed ONLY at Vendor's production facilities
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Steel fabrication works excluding special processes ( Fabrication and assembly on Site )
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the scope of establishing a
Subcontract Agreement for the design, off-site fabrication, supply and
installation of Steel Framed Sheds.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
- Supply of approximately 30,000 meters of steel pipes and
accessories for Dewatering and slurry system in the tunnel as per
TBM program and ground conditions.
- Delivery of the pipes and accessories (According to the delivery
schedule which will be shared later in the tender process
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the scope of
Supply and delivery of steel reinforcement for Precast Lining Segments'
(pre-assembled cages) approx. 12,000 Tons - 12 months.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
- Detailed design of all Steel Structure works in accordance with the
Project design basis standards and Australian Standards.
- Shop & Fabrication Drawings
- Fabrication, Supply(Delivery) and Erection of the Steel Structure as per
the Fabrication Drawings
- Complete system with all structural steel frame, anchorage,
connections, anchorage and assembly / tensioning tools.
- testing and commissioning of the shed package in accordance with
NSW safe work regulation
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the scope of supply
and delivery of approx. 4,675-ton reinforcement steel bar cut and bend
for Tantangara permanent work.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply and delivery of Reinforcing steel bar and wire mesh for Snowy
2.0 project wide.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply and Transport of rock bolts to Snowy 2.0 Project Construction Sites.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in Supply of bulk diesel supply to
project sites Cooma, Tantangara, Marica and Lobs Hole for duration of
36 months
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the scope of supply
of HV and LV cables project wide - framework agreement (24 Months).
- This Scope of Work (SoW) covers the supply of HV and LV cables as
per the attached Appendix BOQ.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Vendor's Scope of Work includes:
- Draft and submission of Shop Drawings and Calculation Reports
- Set-up of a Production Facility fit for purpose and meet AS/ISO 9001:2016 or AS/ISO 3834 standards at the designated Project Area. Following is the key information of project steel lines with approximate details:
* Inner Diameter ranging from 2.2Meters to 6.6Meters
* Thickness ranging from 20mm to 72mm and
* Length of 1km for upstream tunnel steel liners and 0.8km long for downstream tunnel steel liners
* 11000 Tonnage for steel lining work
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor shall state in his express of interest compliance with the
following requirements;
- Supply of (PPE) Personal Protective equipment in accordance with
the Australia Standard and construction site rules.
- All the clothing is required to be reflective taped and embodied.
- Project requirements and accreditation to international standards
such as ISO 9001, ISO 140001, ISO 45001.
- The Vendor shall comply at any time with all requirements relates to
project in respect of Traffic Management System for transport of
goods to FGJV project site as per the regulation in force in Australia
during the lifetime of the Contract.
- Ensure adequate capacity for uninterrupted supply as per the
agreed supply schedule.
- Transport of goods to site shall comply with to Chain of
Responsibility requirements as per the Australian Legislation.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Design, certification, fabrication, installation of Gantry cranes and
Over Head cranes in accordance with the Engineering Design,
supply finish product as per the drawings.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply of tires including transport to site.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply of various lifting materials project wide for a period of 12 months.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the scope of supply
of water treatment chemicals and consumables - 3 years framework
agreement.
- This Scope of Work (SoW) covers the supply of water treatment
chemicals and consumables as per below list;
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
- Silica fume for concrete and shotcrete. The material should comply
with AS/NZ 3528.3 standard approx. qty 4000 ton subject to mix
design approval, type of material dry powder or wet
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation Joint Venture (FGJV) would like to engage a
company with proven experience in surveying activity for underground
and surface works.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the following scope
of underground excavation,
Drill and blast; ground support installation, including shotcrete applications; load and haul;
management of underground services, and instruments; construction verification and survey control
for the construction of Talbingo's Tailrace Tunnel, Y-Junction and Transition Tunnel (as per below
Figure), in accordance with the relevant drawings and Employer Requirements provided by the
Contractor.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Excavation (Intake and Gate Shaft) and Service Areas
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This indicative Scope of Work covers the provision labour, plant and equipment to undertake the installation of modular accommodation units and associated facilities for the Tantangara Camp on the Snowy 2.0 Project
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
- Undertake concrete works at various sites within the project under a
framework agreement.
- Provision of formwork.
- Provision of steel fixing Works (Steel to be supplied by FGJV).
- Provision of Pouring concrete (RMC supplied by FGJV) and final
finish in accordance with the Project requirements
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The vendor is required to state its interest for the for the on-site and
off-site Traffic Control Services stating from October '23 to September
'26
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Transportation of Silica
Sand via Pneumatic Tankers from South Australia to Lobs hole.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Transportation from Cooma Warehouse to FGJV Construction sites,
Lobs Hole, Tantangara & Marica.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of logistics and freight services to Future Generation. Please refer to scope document attached to this work package
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The installation and dismantling of formwork/falsework,
reinforcement steel installation and concrete pours for the following
underground structures within Snowy 2.0 project at Lobs Hole Site
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Generation is seeking to identify suppliers that have the ability and equipment to provide civil works to provide:
. Utilities, Trenching & Civils services at the Polo Flat Segment Factory
. Site preparation
. Underground and Infrastructure services
. Wet and dry labour capability and supplies for civil works
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Scope of Work (SoW) under this supply agreement will cover the provision of waste management services for all Snowy 2.0 project work fronts including, but not limited to:
- Lobs Hole
- Talbingo
- Marica
- Tantangara
- Segment Factory
- Rock Forest; and
- Accommodations at Joule Ridge and Adaminaby.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Scope of Work consists of the provision for preliminaries,
mobilization and demobilization, overheads, management, labour,
training, equipment, materials, tooling and consumables required for
safe execution of the work, personal protective equipment, supervision,
surveying, technical expertise, and all other items required to safely
execute the welding of the TBM 4 components, in accordance with the
relevant drawings and specifications provided by the Contractor.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Future Gen wish to identify providers that have the ability to weld to assemble TBMs.
Subcontractor is to provide welding machines that are 450A and above, DC operated and can operate in both Electrode and MIG configurations.
Subcontractor is to ensure enough welding equipment is provided for the required quantity of welders and as below:
- Spare welding machine will also be required to cover breakdowns.
- Welding consumables, welding wire, welding electrodes and gas.
- The Contractor will also arrange required scaffolding and heating elements to ensure scope completion
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.