NSW Australia
John Holland Pty Ltd
Sydney's north west is experiencing rapid population growth and needs to be supported by essential infrastructure capable of servicing growing demand. In response, Sydney Water is undertaking staged upgrades to the NWTH to support growth to 2056 in line with the NSW Government's long term population forecasts and Sydney Water's operating licence obligations. This requires balancing treatment capacity upgrades, improving environment and community outcomes and complying with environmental regulatory requirements as the NWGA develops. In particular, the NSW EPA's Hawkesbury Nepean Nutrient Framework imposes new nutrient load and concentration limits in our Environment Protection Licences (EPLs) effective from mid 2025. Upgrades to the NWTH in response to new EPL load and concentration limits as well as EPL pollution reduction program (PRP) obligations are currently underway.
The upgrade works involve upgrades at both Riverstone WRRF and Rouse Hill WRRF as per below:
1. Rouse Hill Water Resource Recovery Facility (WRRF):
- Amplification and augmentation of the secondary treatment process
- Odour containment and treatment from new odorous sources
- Augmentation of the disinfection facilities
- Conversion of the existing IDALs to four-stage nutrient removal bioreactors, with a new Membrane Bioreactor (MBR) solids separation system
- Construction of the feed pipeline from the Fine Screens to Bioreactor
- Construction of a new Membrane Bioreactor (MBR)
- HV and LV system upgrades
- Modification of existing switchrooms to support plant augmentation
- SCADA and PLC control system augmentation and upgrades
- Augmentation and amplification of chemical storage and dosing facilities
- New biosolids dewatering and outloading facility
- New RDT polymer storage and dosing facility
- Augmentation of the existing UV facilities
- Augmentation of the existing Super Chlorination Contact Tanks (SCCTs) inlet and outlet pipes
2. Riverstone Water Resource Recovery Facility (WRRF)
- New dryer and gasifier system including odour control and gas scrubbing facilities
- Augmentation of the existing thickening, dewatering, and outloading facilities to facilitate thermal treatment
- HV and LV augmentation and upgrades including new switchrooms
- SCADA and PLC control system augmentation and upgrades
- Odour containment and treatment from new odorous sources, including augmentation of the existing Odour Control Facility (OCF) ducting
- Augmentation and amplification of chemical storage and dosing facilities
- Augmenting and replacement of the existing inlet screens
- A new de-gritter complete with ancillaries
Market Sounding - Project Resource Efficiency Strategy and Targets
The project is looking for input and collaboration from the industry on circular economy opportunities that can contribute to the achievement of the Project resource efficiency targets and requirements.
The project is hoping to engage with the following groups within the market to collaborate and contribute towards positive circular economy outcomes:
- Circular economy businesses
- Industry groups
- Community/local/Indigenous groups
- Greater Project Supply Chain
- Training, education and apprenticeship groups/business
NWTH Circular Economy SMART Targets
- 10-30% reduction in energy use and carbon emissions for the construction phase
- 10% reduction in energy use and carbon emissions over the lifecycle of the asset
- 10% reduction in water demand model for the construction phase
- 10% of materials by cost have a sustainability label
- 10% reduction in materials embodied emissions
- 85% diversion of clean / inert excavation spoil from entering landfill
- 60% diversion of office waste from entering landfill
- 70% diversion of other inert resource outputs from entering landfill
NWTH Diversity & Inclusion SMART Targets
- 1-3% Aboriginal and Torres Strait Islander people
- 15% women employment
- 5-15% women in STEM positions
- 20-40% women in leadership roles
- 1-3% people with disability
- 4-10% CALD workforce / refugees and asylum seekers
- 10-20% learners worker of all ages
- 1 LGBTIQ+ inclusion awareness activities and / or celebrations yearly
- 2-4 Diversity & inclusion case studies yearly
- 1-5 Diversity & Inclusion training and employment programs, strategies, and / or initiatives to encourage local participation:
- Industry visits - High Schools and Universities
- Employment networking events
- Pre-employment programs
- Cultural awareness - Immersion programs
- Celebrate key Days of Significance
Further information on the project at https://www.sydneywatertalk.com.au/north-west-treatment-hub.
How to register an Expression of Interest (EOI)
- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the EOI User Guide below for instructions and assistance to submit an EOI.
- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
ICN Gateway Company Registration
- Click here to register your company profile on ICN Gateway.
- Support and assistance is available through the web links listed below.
- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply of Quarry Materials including Crushed sandstone, DGB20 recycled
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Scope of Works includes a pre-survey prior to commencing works and multiple post-surveys after completion for each separable proportion of works.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
This Scope of Works covers the supply of all plant, equipment, material, and personnel required for the disposal of spoil from site.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of site bins to site
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of cleaning services to site compound
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of security guards for the site compound.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Hire of dry hire plant for the project
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of scaffolding services.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Register your interest for this opportunity.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Register your interest for this opportunity.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Register your interest for this opportunity.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Register your interest for this opportunity.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Fencing of installations
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Temporary works design as well as third party design verification.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Provision of Annual Sustainability Reports.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Suitably Qualified Professional (SQP) Reviews and audits.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Resource Strategy and Biochar Reuse Strategy
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Indigenous Engagement Consultant
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Demolition, removal and disposal of structures and materials as needed.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Demolition, removal and disposal of structures and materials as required.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply and installation of Metalworks - Buildings
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Site clearing and grubbing,- Installation and maintenance of sitewide ERSED controls including construction sediment basins
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply of vegetation for plant
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Electrical services for site compound
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Temporary works design as well as third party design verification,
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Supply and installation of Inlet Structure and Barometric Loop piles in accordance with project Specifications
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Installation of inground pipework.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Installation of inground pipework.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Register your interest for this opportunity.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Purchase of site shed for site compound.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Hire of site shed for site compound.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Plumbing services for site compound
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
Scope of works includes fabrication, supply and installation of metal roofing.
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.
The Subcontractor is to provide all management, supervision, design drawing to safely carry out the complete Piling cut-off
Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.